| 1 | Erection of Structures :- Storage , shifting up to designated place , erection of structure & alignment , leveling and tightening , punching of nuts and bolts and its earthing etc.01. 132KV CT Structures- 03 Nos., 02. 132KV LA Structures- 03 Nos.03. 132KV PI Structures - 03 Nos.04. 132KV Isolator Structures - 03 Nos.05. 33KV Isolator Structures - 02 Nos.06. 33KV CT Structures - 03 Nos. 07. 33KV LA Structures - 03 Nos.08. 33KV PI Structures- 03 Nos.09. 33KV Aux. Bus Structures- 01 No. |
| 2 | Dismantling of 132 KV /33KV Structure.01. 33KV Isolator Structures - 01 No.02. 132KV PI Structures - 03 Nos.03. 33KV PI Structures - 03 Nos. |
| 3 | Stringing of overhead Gantries ,vertical Droppers with ACSR Conductor including fixing of insulator string , spacer, clamps etc.Single Zebra |
| 4 | Stringing of overhead Gantries ,vertical Droppers with ACSR Conductor including fixing of insulator string , spacer, clamps etc.Twin Zebra |
| 5 | Unit rate of storage installation and erection of 132KV outdoor Equipments132KV Circuit Breaker :- Shifting & placement of all the three Circuit Breaker poles on structure including shifting with in sub station premises complete assembly of Circuit Breaker including erection of mechanism box interconnecting piping work , erection of all accessories of the equipments & making interconnecting and its earthing. |
| 6 | Unit rate of storage installation and erection of 132KV outdoor Equipments132KV CT :- Shifting & placement on structure fixing of junction box & all accessories making all interconnections etc. including its earthing. |
| 7 | Unit rate of storage installation and erection of 132KV outdoor Equipments132KV LA :- Shifting & placement of LA equipment on structure including all accessories making all interconnections checking and installation along with earthing etc. |
| 8 | Unit rate of storage installation and erection of 132KV outdoor Equipments132KV Isolator without E/S (Three Phase) :- Shifting & placement ofcomplete Isolator in all three phase of isolator on structure and its earthing along with mounting of mechanism box , interconnections piping , alignment of contacts and all accessories along with the application of petroleum jelly of jaws and contacts of isolators etc. |
| 9 | Unit rate of storage installation and erection of 132KV outdoor Equipments132KV Post/Solid Core Insulator :- Making all interconnection checking and installation along with Earthing etc. |
| 10 | Dismantle of 132KV Solid Core Insulator :- Shifting of dismantling of PI on structure including all accessories making allinterconnection and along with Earthing etc. |
| 11 | UNIT RATE OF UNLOADING , STORAGE , INSTALLATION AND ERRECTION , EARTHING ANDFIXING OF GLANDS IN INDOOR EQUIPMENTS IN THE CONTROL ROOM132KV C&R PANELS (FOR TYPE-SAS-TCRA) :- Storage , shifting of control & Relay panel and placements grouting of panel compete with all relay and there accessories and earthing and fixing of glands etc. making of all connection for the control & relay panel on terminal block as per drawing provided by EE Testing Dn.II MPPTCL Gwalior including all AC & DC connections. |
| 12 | Unit rate of storage installation and erection of 33KV outdoor Equipments33KV Circuit Breaker :- Shifting & placement of all the three Circuit Breaker poles on structure including shifting with in sub station premises complete assembly of Circuit Breaker including erection of mechanism box interconnecting piping work , erection of all accessories of the equipments & making interconnecting and its earthing. |
| 13 | Unit rate of storage installation and erection of 33KV outdoor Equipments33KV CT :- Shifting & placement on structure fixing of junction box & all accessories making all interconnections etc. including its earthing. |
| 14 | Dismantle of 33KV CT :- Shifting & dismantling on structure fixing of junction box & all accessories making all interconnections etc. including its earthing. |
| 15 | Unit rate of storage installation and erection of 33KV outdoor Equipments33KV LA :- Shifting & placement of LA equipment on structure including all accessories making all interconnections checking and installation along with earthing etc. |
| 16 | Unit rate of storage installation and erection of 33KV outdoor Equipments33KV Isolator without E/S (Three Phase) :- Shifting & placement ofcomplete Isolator in all three phase of isolator on structure and its earthing along with mounting of mechanism box , interconnections piping , alignment of contacts and all accessories along with the application of petroleum jelly of jaws and contacts of isolators etc. |
| 17 | Dismantling of 33KV Isolator with E/S (three Phase) :-Shifting & dismantling ofcomplete Isolator in all three phase of isolator on structure and its earthing along with mounting of mechanism box , interconnections piping , alignment of contacts and all accessories . |
| 18 | Unit rate of storage installation and erection of 33KV outdoor EquipmentsErection of 33KV Post/Solid Core Insulator :-Shifting andplacement of PI on structure including all accessories making allinterconnection checking and installation along with Earthing etc. |
| 19 | Dismantling of 33KV Solid Core Insulator :- Shifting anddismantling of PI on structure including all accessories making allinterconnection and along with Earthing etc. |
| 20 | UNIT RATE OF UNLOADING , STORAGE , INSTALLATION AND ERRECTION , EARTHING ANDFIXING OF GLANDS IN INDOOR EQUIPMENTS IN THE CONTROL ROOM33KV C&R Panel SAS with BCPU:- Storage , shifting of control & Relay panel and placements grouting of panel compete with all relay and there accessories and earthing and fixing of glands etc. making of all connection for the control & relay panel on terminal block as per drawing provided by EE Testing Dn.II MPPTCL Gwalior including all AC & DC connections. |
| 21 | CABLE LAYING :- Laying of Copper cable (armored-un armored on racks/Cable Trays? Angle support overhead racks conduits including dressing of cable with accessories for Copper Conductor and unarmored Control cable. 2 Core x 2.5 Sq.mm |
| 22 | CABLE LAYING :- Laying of Copper cable (armored-un armored on racks/Cable Trays? Angle support overhead racks conduits including dressing of cable with accessories for Copper Conductor and unarmored Control cable. 4 Core x 2.5 Sq.mm |
| 23 | CABLE LAYING :- Laying of Copper cable (armored-un armored on racks/Cable Trays? Angle support overhead racks conduits including dressing of cable with accessories for Copper Conductor and unarmored Control cable. 8 Core x 2.5 Sq.mm |
| 24 | CABLE LAYING :- Laying of Copper cable (armored-un armored on racks/Cable Trays? Angle support overhead racks conduits including dressing of cable with accessories for Copper Conductor and unarmored Control cable. 12 Core x 2.5 Sq.mm |
| 25 | CABLE LAYING :- Laying of Copper cable (armored-un armored on racks/Cable Trays? Angle support overhead racks conduits including dressing of cable with accessories for Copper Conductor and unarmored Control cable. 19 Core x 2.5 Sq.mm |
| 26 | CABLE TERMINATION:-Cable Termination including providing of holes for Cable entry fixing of glands, dressing of Cable leads, fixing of lugs, etc. for each type of control cable including termination at both ends.2 Core x 2.5 Sq.mm |
| 27 | CABLE TERMINATION:-Cable Termination including providing of holes for Cable entry fixing of glands, dressing of Cable leads, fixing of lugs, etc. for each type of control cable including termination at both ends.4 Core x 2.5 Sq.mm |
| 28 | CABLE TERMINATION:-Cable Termination including providing of holes for Cable entry fixing of glands, dressing of Cable leads, fixing of lugs, etc. for each type of control cable including termination at both ends.8 Core x 2.5 Sq.mm |
| 29 | CABLE TERMINATION:-Cable Termination including providing of holes for Cable entry fixing of glands, dressing of Cable leads, fixing of lugs, etc. for each type of control cable including termination at both ends.12 Core x 2.5 Sq.mm |
| 30 | CABLE TERMINATION:-Cable Termination including providing of holes for Cable entry fixing of glands, dressing of Cable leads, fixing of lugs, etc. for each type of control cable including termination at both ends.19 Core x 2.5 Sq.mm |
| 31 | Preparation of Earthing pits :- Preparation of Earthing pits ( 1.25MX1.25MX3M) as per Board\"s drawing No. XII-B- 774 which includes excavation of the soil encountered embedding of 4 Nos. G.I. pipes of size 40mm 3Mtr.long back filling with black cotton soil free from boulders & harmful mixture. These GI pipe are to be welded with MS flat at 3 places by making mesh frame and cutting of pipes as also making holes in pipe for water seepage. The earth pit is to be connected with earth mesh of MS flat. |
| 32 | Installation of earthlings’:-Installation of following jointing up to the equipments earth terminals, fixing and clamping with accessories and hardware such as saddle, clamps, cleats, plugs, screws, nut bolts, washers & welding brazing etc. Installation of 25mm. Dia 3000mm. Long MS rod earth electrodes by directly driving / drilling (6\"\" dia) to in earth including excavation (irrespective of type of solid encountered) , back filling with bentonite soil, welding to earth Conductor etc |
| 33 | Installation of earthlings’:-Installation of following jointing up to the equipments earth terminals, fixing and clamping with accessories and hardware such as saddle, clamps, cleats, plugs, screws, nut bolts, washers & welding brazing etc. Laying of Flat (65mmx or 50mmx6mm) duly buried at a depth of 0.5 Mtr. providing of risers for structures earthing including back filling, welding etc. structures earthing of following length.50X6mm |
| 34 | Installation of earthlings’:-Installation of following jointing up to the equipments earth terminals, fixing and clamping with accessories and hardware such as saddle, clamps, cleats, plugs, screws, nut bolts, washers & welding brazing etc. Laying of Flat (65mmx or 50mmx6mm) duly buried at a depth of 0.5 Mtr. providing of risers for structures earthing including back filling, welding etc. structures earthing of following length.65X8mm |
| 35 | Screening Conductor/ overhead Shield wire :- Stringing of over head shield wire with 7/3.66 mm standard galvanized steel complete with fixing of strain clamp at the structures. |
| 36 | Installation of Lighting Fixture On Structure :- Installation of light fixture on gantry column , supply connection to the light fitting from the nearest lighting board in the yard etc. |
| 37 | Junction Box (36 Ways) |