| 1 | Barricading of pipe line of trenches by using bamboopoles, caution tape etc for safety purpose Including all labor, material T&P etc complete. |
| 2 | Dismantling of Bituminous/chauka stone roads for laying of sewer including sorting out and stacking of serviceable materials and disposal of unservice-able materials up to a distance of 50m.Bituminous Road |
| 3 | Interlocking |
| 4 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m and lead upto 50 m filling, watering and ramming of excavated earth into the trenches and disposal of surplus earth upto a distance of 50 m from the centre of the foundation trenches. (a) 00.00 m-01.50 m B.G.L. |
| 5 | Supply of (ø100mm) DI-K7 pipe packing and forwarding charges, transit insurance charges etc. |
| 6 | Unforseen Item as electric cable, telephone cable etc damaged during laying work of HDPE Pipe line Including all labor, material T&P etc complete. |
| 7 | Providing and laying Granular bedding (GSB) with carefully compacted graded hard crusher brokenstone of 100% passing through 20mm sieve, 20-50% passing through 10mm sieve and 100%retained on 6mm sieve. |
| 8 | Laying & Electro fusion, jointing & testing of ø100mm HDPE pipe, Tee, End cap, Bend, coupler etc labor, T&P complete work. |
| 9 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exeeding10km. from the site of work and including watering, dressing, etc. rate to include the cost of all materials, labour, T&P etc. required for proper completion of work. |
| 10 | Making/Shifting new water connection from distribution mains new line with material, labor, cost of fittings and specials, T&P etc complete work. |
| 11 | Providing following size of C.I.D/F Sluice Valve of various size given below including transportation charge, loading, unloading & stacking, etc complete |
| 12 | Carting of following size of sluice valves from store to site of work, lowering in already prepered trenches and fixing them in position including cost of jointing materials and proper completion of work. Sluice Valve (ø100mm) |
| 13 | construction of Sluice Valve chamber Including excavation, brick work, plastering, frame cover supply & fixing, CC work, labor, T&P etc complete. |
| 14 | Fabrication work at site during laying work of water line Including welding, grinding, cutting, finishing etc complete work. |
| 15 | Supply & fixing of Tee at Interconnection point of new pipe line Including cutting, making, welding, jointing etc complete etc. |
| 16 | Provision for Inter connections from Old existing pipe line (250mm)PVC to new pipe line (100mm) D.I as per requirement & direction of Engineer Incharge Including supply of all materials, Labor T&P etc complete. |
| 17 | Restoration /Resetting work of dismantled chauka stone road after completion of work Including proper compaction base, fixing, pointing Including all labor, required material, T&P etc complete work.Bituminous Road(As per PWD Norms) |
| 18 | Interlocking(As per PWD Norms) |
| 19 | Cleaning & disposal of surplus earth/malba/from site within 8Km.municiple limit with all materials,labours T&P etc for complete work. |