| 1 | House keeping and Cosmetics Maintenance, as per clause no. 1 of technical specification |
| 2 | Preventive Maintenance of power & Lighting Panels as per clause No.2 of technical specification |
| 3 | Panel incomer 300A (1 No) (Service frequency - Once in a year) |
| 4 | Panel incomer 125A (1 No) (Service frequency - Once in a year) |
| 5 | Distribution boards as per clause No.3 of specification (13Nos)(Service frequency - Half Yearly) |
| 6 | Earthing Stations as per clause No.4 of specification (5Nos)(Service frequency - Half Yearly) |
| 7 | Maintenance of following LED lighting fixtures |
| 8 | Maintenance of 36W Recess type LED lighting fixtures as per clause No 5.1 of specifications |
| 9 | Maintenance of 12W/15W/18W LED lighting fixtures as per clause No 5.2 of specifications |
| 10 | Maintenance of 100W flood light LED lighting fixtures as per clause No 5.3 of specifications. |
| 11 | Supply, installation, testing and commissioning of electronic driver for 36W LED lights as per clause No 6 of specifications. |
| 12 | Supply, installation, testing and commissioning of electronic driver for 12W/15W/18W LED lights as per clause No 7 of specifications. |
| 13 | Supply, installation, testing and commissioning of electronic driver for 100W LED lights as per clause No 8 of specifications. |
| 14 | Break down maintenance of exhaust fans (Size 300mm) as per clause No.9 of specifications |
| 15 | Breakdown maintenance of wall mounted fansas per clause No.10 of specifications |
| 16 | Break down maintenance of ceilling fans(1200mm)as per clause No.11 of specifications |
| 17 | MS box : Supply and installation of following MS concealed/surface-mount boxes as directed by EIC along withfaceplate and cover as per technical specification |
| 18 | 2 module box |
| 19 | 4 module box |
| 20 | 6 module box |
| 21 | 12 module box |
| 22 | Switches : Supply, installation, testing and commissioning of following modular switches as per technical specification |
| 23 | 16A SP switch |
| 24 | 6A SP switches |
| 25 | Blanking plate |
| 26 | Sockets : Supply, installation, testing and commissioning of following sockets as per technical specification |
| 27 | 6/16A sockets 3 module |
| 28 | 6A sockets |
| 29 | Casing Capping:Supply and installation ofFR PVC casing capping size of 25 mmx 12 mm as per clause No.15 of technical specification |
| 30 | MS S Item; supply & installation of MS items fabricated from channel/angles/pipe/plate etc as per clause No.16 of technicalr specification. |
| 31 | MS Box : supply & installation of MS box fabricated from 14 / 16 SWG MS sheet duly powder coated etc as per clause No.17 of technical specification. |
| 32 | Only installation, termination, testing and commissioning of RJ-45 I/Oas per clause No.18 of technical specification |
| 33 | Only installation, testing and commissioning of cat-6 cable along with crimping with RJ-45 connector on both ends as per clause No.19 oftechnical specification |
| 34 | Semi-comprehensive maintenance (preventive + breakdown) of following equipments as per tender technical specifications (for 24 months): |
| 35 | 1.0 TR capacity split type air-conditioners (Qty-4 nos) (Service frequency - quarterly) |
| 36 | 1.5/2.0 TR capacity split type air-conditioners (Qty-6 nos) (Service frequency - quarterly) |
| 37 | 3.0 TR capacity cassette type air-conditioners (Qty-3 nos) (Service frequency - quarterly) |
| 38 | Water cooler having capacity up-to 40 ltrs. (Qty-2 no) (Service frequency - quarterly) |
| 39 | RO type water purifier of make Kent (including all candles/filters) (Qty-1 no) (Service frequency - quarterly) |
| 40 | Water purifier DOLPHIN (FILFAB) purifier (including all candles/filters) (Qty-1)(Service frequency - quarterly) |
| 41 | Semi-comprehensive maintenance (preventive + breakdown) of Air Handling Unit of 5000 cfm flow @ 150 mm st. pr. Along with 8.5 TR x 02 nos. DX ODU as per tender technical specifications (Service frequency - quarterly) |
| 42 | Providing spare parts / items for split ACs, cassette ACs, water coolers etc as per tender technical specifications as & when required during breakdown as per following: |
| 43 | Replacement of non-inverter compressor for upto 2 TR capacity split AC as per OEM along with gas charging |
| 44 | Providing PCB (with sensor) of non-inverter split AC & cassette AC |
| 45 | Providing new IDU blower motor/condenser fan motor for non-inverter split AC & cassette AC |
| 46 | Carrying out installation/ re-installation work of split ACs as per technical specification as & when required during contract period |
| 47 | Providing & installing additional running length of soft drawn copper tubes + sleeve type close cell nitrile rubber insulation of sizes suitable for new split ACs & as per technical specification |
| 48 | Providing & installing PVC braided flexible drain pipe of 5/8\" dia as per technical specification |
| 49 | Providing & installing 4Cx2.5 mm² electrical cable for split ACs as per technical specification |
| 50 | Providing & installing PVC trunking of 50mm x 50mm cross sectional size |
| 51 | Providing standard wall mounting ODU stand with 06 nos. 10 mm & minimum 100 mm long anchor fastener & 04 nos. GI nut-bolts with washers along with rubber pad for ODU installation |
| 52 | Comprehensive Maintenance (Including All Spares) of Submersible Water pump (3 HP) along with control and phase failure protection panel |
| 53 | Pest control treatment of surrounding & inside areas as per clause No.30 of specification |
| 54 | Water tank cleaning (Service frequency - halfyearly) as per clause No.31of specification |
| 55 | Capacity 5000 Ltr (1 Nos) |
| 56 | Capacity 1500 Ltr (1 Nos) |
| 57 | Capacity 1000 Ltr (1 Nos) |
| 58 | Providing and fixing single point lock cum handle foraluminium openable windows / top hung shutterscomplete all as per specifications and as directed by the Engineer-in-charge |
| 59 | Providing and fixing Heavy Duty Stainless steeladjustable friction windows stays of approved quality with necessary stainless steel screws to the side hung windows as per specifications and as directed by the Engineer-in-charge |
| 60 | Size 12\" x22 mmx 2.50 mm |
| 61 | Providing and fixing glazing in aluminium doors, window, ventilator shutters and partitions etc with PVC / Neoprene gasket etc. complete as per the architectural drawings and directions of the Engineer-in-charge (Cost of snap beading shall be paid in basic item) |
| 62 | Withclear float glass panes of 5.00 mm thickness |
| 63 | Repairing of metal almera/metal storage cabinets hinges, drawers, handles, aldropetc. |
| 64 | Providing and fixing IS:1341 marked OXIDIZED M.S. HEAVY WEIGHT BUTT HINGES / PARLIAMENTARYHINGES of size 125 x 90 x 3.15 mm with necessary screws etc. Complete |
| 65 | Providing and fixing durable heavy duty multipurpose furniture drawer lock of 40mm x 40mm for 22mm panel thickness with atleast two keys, with SS screws complete as per direction of Engineer-in-Charge. |
| 66 | Providing and fixing durable heavy duty brass wardrobe lock of size 25mm, cabinet with nickel plated finish, with atleast two keys, with SS screws complete as per direction of Engineer-in-Charge. |
| 67 | Providing and fixing heavy duty stainless steel soft close 4-hole full overlay cabinet hinges with stainless steel screws etc. complete as directed by the Engineer-in-charge. |
| 68 | Providing and fixing CP BRASS / COPPER INLET CONNECTION pipes heavy quality suitable for hot and cold including CP brass unions and nuts 15 mm dia 600 mm long. |
| 69 | Providing and fixing 15mm PVC INLET CONNECTION SUITABLE FOR HOT AND COLD WATER 600 mm long with nuts andwashers complete for wash basins/ Urinals etc. with all necessary acessories completeas directed by the Engineer-in-charge. |
| 70 | FILLING THE GAP WITH SILICON SEALANT between aluminium frame & adjacent RCC / Brick work / Stone work over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete Up to 5 mm depth and 5 mm width. |
| 71 | Providing and fixing ALUMINIUM HANGING HEAVY QUALITY FLOOR DOOR STOPPERISI markedwith twin rubber stoppers, anodised transparent or dyed to required. colour or shade with necessary screws etc. complete. |
| 72 | Providing and fixing 6 LEVERS MORTICE LATCH AND LOCK of approved make and a pair of handles Inside opening Left / Right with necessary screws etc completesuitable for fixing in wooden / steel/ FRP/ doors. |
| 73 | Providing and fixing 4 LEVER MORTICE LOCK / cylinder lock of approved make suitable for aluminium sections. |
| 74 | Providing and fixing ANODISED ALUMINIUM BABY LATCH of size 75 X 12 mmISI marked of approved make transparent or dyed to requried colour or shade with necessary screws etc. |
| 75 | Supplying, providing and fixing DOOR CLOSER with necessary screws, fixing to the aluminium/glass/wooden door complete as per drawing, specifications including all labour, transporting charges etc. & as directed by EIC. Note- Tentative/suggested make for the guidance of the bidder (s) : M/s. Techma, hardwin, Hyper, Dormaor equivalent make for door closer |
| 76 | Providing and fixing double action hydraulic floor spring of approved brand and manufacturer (conforming to relevant Indian Standard) for doors including cost of cutting floors as required, embedding in floors and cover plates with M.S pivot and singlepiece of M.S sheet outer box with slide plate etc. complete as per directions of Engineer-in-charge. |
| 77 | Repairing of Chairs for alignment, wheels,sheet cover, arm, hydrolic system etc. |
| 78 | REPAIRING OF BIBS TAP / PILLAR TAP / STOP COCK etc. by changing with the spindle, new washers etc. as per site requirement & directed by Engineer-In-Charge. |
| 79 | Opening of nahani trap, removing nahani trap jalli, CLEANING THE COMPLETE NAHANI TRAP / FLOOR TRAP and refixing the same with white cement etc. as directed by Engineer in charge. ( 1 operation = 1 time operation of all taps per month) |
| 80 | Opening of bottle trap from its joint, CLEANING THE COMPLETE BOTTLE TRAP and refitting/refixing same to the sinks, wash basins etc. as directed by Engineer in charge (Note:- If bottle trap is found in unused condition it will be supplied by department at free of cost).( 1 operation = 1 time operation of all taps per month) |
| 81 | CLEANING THOROUGHLY THE EXISTING SERVICE SHAFTS (ALL FLOORS IN VERTICAL) / BEHIND RCC JALI / GENTS & LADIES TOILET at all floors including cleaning throughly the existing cast iron soil and rain water pipes of all wastes, removing rags, loose material, cob webs, cloth pieces , broken concrete pieces and all deleterios materials including lift and lead charges, cost of all tools, tackles, plants, accessories etc. all complete and as directed by Engineer in charge.( 1 operation = 1 time operation of all shaft per quarter) |
| 82 | CLEANING OF SEWAGE PIPE LINE: Cleaning and removal of sewage or drainage wastes, muck etc. from horizontal, sloping RCC/CI/PVC lines of all dia. (burried undergroung/under roads/exposed)connecting to sewage inspection chambers, manhole chamber etc. by mechanically / manually as desired by EIC including cost of labour, tools, machines, transportation etc. |
| 83 | CLEANING AND REMOVAL OF CHOCKING OF SEWAGE WASTES, MUCK, FROZEN SEWAGE CAKES ETC. FROM EWC/IWC/AIWC MANUALLY, including cost of labour tools, trooly of sewage muck for disposal of designated place, all complete in all respect and as directed by Engineer in charge.( 1 operation = 1 time operation per month) |
| 84 | Tree pruning as per the direction of EIC |
| 85 | Providing and fixing white vitreous china European type floor / wall mounted Water Closet with suitableTrapwith solid seat and lid of approved make, 10 litre low level white PVC flushing cistern with manually controlled device (handle lever) conforming to IS:7231,flush bend, fixing EWC with C.P brass screws, 15 mm PVC heavy quality inlet connection of 450 mm long, including testing , commissioning & cleaning and filling the joints with white cement etc.complete all as per drawings and specifications and as directed by the Engineer-in-charge |
| 86 | E.W.C. pan in White colourwith ISI marked white solid plastic seat and lid including cost of white cement for jointing the trap to line. |
| 87 | Provifing and fixing white vitreous China European type wall mounted / wash down type water closet pan of approved pattern ofapproved make, including necessary screws and jointing complete etc. including solid plastic seat of approved colour suitable to existing EWCwith lidincluding CP brass / SS bolts, screws etc. for wall mounted / pedestal type W.C. pan complete as per specifications and as directed by the Engineer-in-charge |
| 88 | Providing and fixing 15 mm C.P brass urinal spreader sizewith 1/2\" BSP thread and shapes, weighing not less than 60 gm of approved make and type. |
| 89 | Providing and fixing Brass 15 mm C.P presstomatic series auto shut urinalflush cock ofapproved make and quality |
| 90 | Providing and fixing 15 mm C.P brass tube 600 mm long with nuts andwashers complete for wash basins / urinals with all necessary acessories completeas directed by the Engineer-in-charge |
| 91 | Dismantling C.I pipes of following dia in shafts / open piping including taking out the pipes manually, breaking lead caulked joints, melting of lead, making into blocks including stacking of pipes within a lead of 200 m as per direction of Engineer-in-charge-100 Dia C. I pipe |
| 92 | Dismantling PVC or Asbestos rain water pipe of all diameter with fittings and clamps including the serviceable materials within 100 m lead as directed by the Engineer-in-charge |
| 93 | Dismantling old plaster / skirting carefully ,raking out joints and cleaning the surface for plaster includingdisposal of rubbish to the dumping ground within 100 m lead |
| 94 | Dismantling brick bat coba cement based water proofingover roof and chajjascarefully without damaging adjacent structures includingloweringand stacking of materials and dispoal of unserviceable materials within 200 m lead as per direction of Engineer-in-charge |
| 95 | Preparing the existingwater proofing by making it slightly rough by grinding the same by mechanical means and cleaning the surface, removal of polycon net etc. and to make it free from all unwanted dust, loose material and other contaminants that may damage the water proofing treatment complete as directed by the Engineer-in-charge |
| 96 | Supply and Application of Chemical (Epoxy, Polyurethane) and membrane (fleece) based Waterproofing system: Providing and applying (Pre Measured Packed) silver grey coloured 2 components solvent free, odourless, excellent adhesion property Epoxy-based Primer on the clean and grinded surface. The substrate can be slightly moist (in concrete, the moisture must be < 20 %), sound and free from any material that would hinder adhesion. Mix component A into component B in ratio specified, thoroughly with stirring stick. The mixture should be a uniform colour, free from streaks. Apply the primer evenly with roller. The primer should be completely dry for further application of liquid applied polyurethane based membrane. The Consumption depending on the nature and condition of the substrate for priming ̴ 250 to 400 gm/sqm. The rate shall including cost of material, labour, tools & plants etc. complete. \"Providing and Applying a cold liquid applied waterproofing based on highlyflexible solvent free single component Polyurethane system and a special needle punched non woven, system compatible polyester fleece of minimum 120 GSM as reinforcement. The cold liquid applied reinforced system is highly crack bridging, UV stable, Solvent free, Cool Roof system. Stir the material before use. Over the prime substrate, Approximately 2/3 of the waterproofing mix material is applied to the substrate and Fleece is rolled with roller, removing air bubbles and allowing overlap of 5cm. The remaining 1/3 of the waterproofing mix material is poured onto the surface until complete saturation is achieved. After curing on next day apply one coat of material approx. 300g/m2. Note :Tentative / suggested make for the guidance of the bidder (s) : Kemper 2K POX primer, Kemper 1K waterproofing system & Kemper Fleece 120or equivalent make - Technical specifications of Primer:1) Workability: approx 45min 2) Average tensile strength: 1.5N/mm2 3) Minimum tensile strength: 1 N/mm2 Technical specifications of liquid applied waterproofing system:1) Workability: approx 30min 2) Specific gravity: 1.25 to 1.35g/m3 3) Viscosity: 12000-18000mPas 4) Applicable on Roof Slope: <5% to >30% 5) Hardnesshore A: 70 6) Tear resistance: 41.4 N/mm 7) Tensile strength with fleece: 8.625 N/mm2 8) Elongation at break with fleece: 83.5% 9) Adhesive strength: 2.45 N/mm2 Technical specifications of Fleece:1) Tensile strength at break: >6894 N 2) Elongation: >50% 3) Tear resistance: >2357 N 4) Puncture strength: 4737 N |
| 97 | Providing 15 mm thick Internalplaster in cement mortar 1:4 without cement punning (usingCrushed Sand) finished smooth, including sieving of sand to required fineness, preparation of the surface, scaffolding, curingall as per specifications, drawings and as directed at site complete. |
| 98 | Providing & applying structural repairs with pre-packed dual shrinkage controlled (volume stable in wet & hardened state), single-component ready-to-use, structural grade high build, alkali-resistant, fibre-reinforced, thixotropic polymer modified repair mortar having excellent bond strength to old damaged concrete structures / surfaces in the following process:1) Removal of loose/spalled or damaged concrete by chipping and cleaning the concrete surface to open up to 20mm behind the reinforcement steel with wire brush and with clean water 2) Cleaning the rebars with Acetone for complete rust removal and washing with water to make the surface clean. 3) Applying protective coat / bond coat using Styrene Butadiene Rubber (SBR) polymer and cement in the proportion of 1: 1 (1 part of polymer : 1 parts of cement). 4) Mixing full 25 Kg bag with clean potable water in water to product ratio of 0.12 to 0.18), mixed by heavy-duty slow speed (300 to 600 rpm) drill with spiral mixing paddle or forced action pan mixer pan for 3 minutes to achieve uniform lump free mortar consistency.5) Applyingpolymer modifiedmortar with trowel & float. The polymer modified mortar shall have the following properties/technical parameters:(A) Properties / technical parameters of pre-packed Polymer Modified Mortar:i) Compressive strength 1 day: Min. 20 MPa (as per BS:6319 : Part 2)ii) Compressive strength 7 days: Min. 35 MPa (as per BS:6319 : Part 2)iii) Compressive strength 28 days: Min. 45 MPa (as per BS:6319 : Part 2)iv) Flexural strength in 28 days:Min. 7 Mpa (as per BS:6319 : Part 3)v) Tensile strength in 28 days:Min. 2.5 MPa (as per BS:6319 : Part 7)vi) Bond strength: Min. 5 MPa (as per ASTM : C881)vii) Water permeability: less than 1% (as per ASTM : C881)viii) Drying shrinkage in 28 days: less than 1000 microstrain (as per ASTM C 157-93)ix) Potential Alkali Reactivity - : <0.1% Expansion % ( ASTM C1260)(B) Properties / technical parameters of SBR polymer bond coat material:\"i) Meets the requirements of BS 6319 part 2:1983 & ASTM C 190-85 standardsii) Total solids % by mass at 105oC: 38 + 1iii) pH value: 7.5 to 9.5iv) Specific gravity at 27.5oC: 1 to 1.05v) Coverage: 4.2 - 4.5 sq.m/kg per coat\"Notes:- (a) If ambient temperature is more than 30oC, use chilled water for mixing and store unused product in shed. Placing and finishing the same with trowel carefully compacting the same around the rebars and finishing to bring it in line with existing concrete surface on the beams, slabs, columns, etc. (b)If thickness of repair exceeds 20mm , after every 20 mm thick repair, bond coat as per process no. (3) mentioned above in the BOQ item, to be applied and further thickness of repair to be continued for each layer. (c) The surface preparation & method of application shall be as per manufacturer\"s technical data sheet. (d) The double tubular steel scaffolding will be paid separately in relevant item. (e) Safety Precuations:- Use wear tight-fitting, dust-resistant, chemical splash goggles and dust respirator, if airborne dust is generated, wear protective rubber hand gloves, wear appropriate clothing to prevent any possibility of skin contact. The above item of work is inclusive of all materials, labour, machinery, tools & tackels, consumables, trasportation, loading & unloading, safety PPEs etc. all complete as directed by Engineer-in-charge at site using approved pre-packed polymer modified mortar suitable for structural repair works. Tentative / suggested make for theguidance of the bidder(s): M/s. BASF, Pidilite, FOSROC or equivalent. |
| 99 | Providing and constructing brick workin cement mortar using Standardbricks of approved quality / class, make / brandin super structure above plinth up to Floor-II level in all shapes and sizes including curing, raking out jointscomplete as per specifications and as directed by the Engineer-in-charge.Brickwork in super structure with standard bricks in C.M 1:4 using crushed Sand |
| 100 | LEAD CHARGES FOR LEAD OF DEBRIS by mechanical transport including loading, unloading, stacking / levelling etc. Notes : 1. The rates are applicable for NET Quantities arrived after making deduction for voids @ 30% from corresponding TRUCK Measurement. 2. Finding authorised ground for disposing debries, transporting of debries at disposal ground, disposing, stacking, leveling & statutory charges if any will be responsibility of the Contractor and no extra charges shall be paid for the same. The debris from identified area shall be cleared every week after accumulation of minimum one Truck Load. |
| 101 | Debris Beyond 4 Km but up to and including 5 Km. |
| 102 | Grading roof for water proofing treatment with concrete / cement mortar as specified to obtain proper slope all as directed by the Project engineer. By using Cement Mortar 1:3 using 100% Manufactured sand. |
| 103 | Extra for providing and mixing waterproofing compound added @2% by weight of cement or in the proportion by the manufacturer |
| 104 | Providing and fixing PVC rain water pipes conforming to relevant IS type B and PVC SWR fittings & specialsconforming to relevant ISincluding jointing with seal ring / With PVC solvent adhesive including fixing in walls usingclampsetc completeall as per drawings, specifications and as directed by the Engineer-in-charge . |
| 105 | SWR Pipe 160 mm O/D |
| 106 | Providing and fixing 150 mm x 150 mm cast iron grating for rain water down takes at roof including chipping and grouting complete all as directed by the Engineer-in-charge |
| 107 | Core cutting in RCC beyond 150 mm up to and including 200 mm Dia |
| 108 | Providing and applying wall painting two coats on new work with premium plastic emulsion paint of approved brand to give an even shade, including a coat of approved cement primer, including preparation of the surfaces, scaffolding complete. as per specifications and as directed by the Engineer-in-charge |
| 109 | Providing and fixing WATER PROOF MARINE PLY of any approved brand as per IS 710: 2010.The rates are including the cost ofscrews, washers etc complete providing and fixing hard wood leaping around board in walls etc. |
| 110 | By using 12mm thick water proof marine ply |
| 111 | Providing and fixing decorative high pressure 1.5 mm thick laminated sheet of plain / wood grain in gloss / matt/ suede finish with high density protective surface layer and reverse side of adhesive bonding quality conforming to IS:2046 Type S including cost of adhesive, labour etc. complete as directed by the EIC. |
| 112 | Providing and fixing decorative high pressure 1.0 mm thick laminated sheet of plain / wood grain in gloss / matt/ suede finish with high density protective surface layer and reverse side of adhesive bonding quality conforming to IS:2046 Type S including cost of adhesive, labour etc. complete as directed by the EIC. |
| 113 | Providing and fixing IS:12817 marked stainles steel butt hinges of size 75 x 50 x 2.5mm (heavy weight) of approved make with stainless steel screws etc. complete as directed by the Engineer-in-charge |
| 114 | Providing and fixing aluminium handles175 mm long Inner grip 125 mm with 12 mm dia rod plate type BOW handles ISI marked of approved make, anodised transparent or dyed to req. colour or shade with necessary screws etc. complete. |
| 115 | Providing SFMC Micro concrete for strengthening of structural membersincluding mixing, pouring, curing as per manufacturer specifications and as directed by the Engineer-in-charge |
| 116 | Using 100% SFMC |
| 117 | Providing and fixing in position suspended false ceiling system using 600 x 600 mm mineral fibre reinforcedfactory applied vinyl paintedceiling tiles having 16/15mm thick,and approvred surface design and edge profileplaced in a suspended grid of size of 600 x 600mm made of hot-dipped G.I steel sections having an exposed surface capping of pre-finished baked polyester painted coil wherein the main tee of size 24mm x 32mmxshall be suspended at 1200 mm centres along the length of ceilingwith 4mm dia G.I wire with necessary level adjusters. The cross tees of size 24 x 27 x 1200 mm shall be inserted in to slots between the main tees at 600mm centresand thereafter in directionvertical to the longer tees, cross tees of size 24 x 25 x 600mmshall be inserted to form a grid size of 600x600mm resting on the perifery walls on wall angles of size 24mm x 24mm including providing necessary openings for light fixtures, diffusers, trap doors etc to be made as per layout drawings and as per directions of Engineer-in-charge.The main teesto besuspended from the ceiling/ soffit with the help of metal dash fastners of 6mm x 50mm, soffit clits of 25mm x 35 x1.60mm and 4mm dia G.I wire with galvanised spring steel levelling clips. the entire grid system shall be designed to bear a distributed load of minimum 15 kg/sq.m- Acoustic 600x 600 mmFalse Ceiling--19mm thick |
| 118 | Providing and fixing C.P brass bib cock of heavy quality of specified / approved makeas per specifications and as directed by the Engineer-in-charge - 15 mm Dia LONG BODY bib cock of approved type and make |
| 119 | CARRYING OUT MANUAL MISC. CARPENTRY / PLUMBING / CIVIL / MASONRY JOBS like minor repairs, fixing fitting and fixtures etc.as and when required and as directed by the Engineer-in-charge Note: 1. Labours shall bring necessary carpentary / plumbing tools,minimum materials such as washher, taflon tape, rawlpludge, screws, clips etc. 2) Payment shall be made as per the Log book duly approved by the Enginner in charge. 3) Contrator shall arrange necessary Police Verification Certificate for the workers engaged for thess work. 4) The contractor shall deploy one skilled, semiskilled or unskilled person for each job for 8 1/2 hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. |
| 120 | UNSKILLED CARPENTERY/PLUMBING/MASONRY JOB / WORKS with valid Police Verification Certificate for entire contract period. |