| 1 | A For ROADProviding and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/quartzite/ gneiss metal for foundation and bedding including bailing out water, Steelcentering,formwork, laying/pumping, compacting, roughening them if special finish is to be provided,finishingifrequiredand curingcomplete,withfullyautomaticmicroprocessor based PLC with SCADA enabled reversible Drum Typemixer/concreteBatchmixplant(Panmixer)etc.complete. Withfineaggregate(CrushedsandVSI Grade) Bd. E. 1 Page Number 287 |
| 2 | Providing and laying Cast in situ/Ready Mix cement concrete in M20 of trap/ granite/quartzite/gneissmetalforbedblocks,foundationblocksand suchotheritems includingbailing outwater, Steelcentering,formwork,laying/pumping,compacting, rougheningthemifspecialfinish is to be provided, finishing uneven and honeycombedsurfaceandcuringetc.complete.TheCement Mortar 1:3plaster is consideredfor rendering unevenandhoneycombedsurface only. Newly laid concrete shallbe coveredby gunnybag,plastic, tarpaulin etc. (Wooden centeringwill not beallowed.), with fully automatic microprocessorbasedPLCwithSCADAenabledreversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Bd.E.4 Page Number 289 and B- 7, Page Number38 |
| 3 | Laboratory testing charges are not considered in the Rate Abstracts. Where ever required separate item shall be taken in the estimate for material testing charges, on the basis of testing frequency and charges fixed by Vigilance & Quality Control Circle, for the current year and shall form part of tender.testing of material by Quality control and certified quality must be use by contractor. CONCRETE Compressive Strength of C. C. Cube (Set of 3 Cubes) |
| 4 | B For DRAINExcavationforcatch/side watergutterinallsortsofsoilsto thespecifiedsectionincluding stackingthe excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. MORTH 309 |
| 5 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. MORTH 305 |
| 6 | Providing rubble filling of trap/ granite/ quartzite gneiss stones for foundations including filling voids with sand/grit and compaction etc complete. CD.1 Page.No. 159 |
| 7 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/quartzite/ gneiss metal for foundation and bedding including bailing out water, Steelcentering,formwork, laying/pumping, compacting, roughening them if special finish is to be provided,finishingifrequiredand curingcomplete,withfullyautomaticmicroprocessor based PLC with SCADA enabled reversible Drum Typemixer/concreteBatchmixplant(Panmixer)etc.complete. Withfineaggregate(CrushedsandVSI Grade) Bd. E. 1 Page Number 287 |
| 8 | Providing and laying Cast in situ/Ready Mix cement concrete in M20 of trap/ granite/quartzite/gneissmetalforbedblocks,foundationblocksand suchotheritems includingbailing outwater, Steelcentering,formwork,laying/pumping,compacting, rougheningthemifspecialfinish is to be provided, finishing uneven and honeycombedsurfaceandcuringetc.complete.TheCement Mortar 1:3plaster is consideredfor rendering unevenandhoneycombedsurface only. Newly laid concrete shallbe coveredby gunnybag,plastic, tarpaulin etc. (Wooden centeringwill not beallowed.), with fully automatic microprocessorbasedPLCwithSCADAenabledreversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Bd.E.4 Page Number 289 and B- 7, Page Number38 |
| 9 | Providing cast in situ / ready mix M20 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing andcuring etc. complete. (withreversible drum type mixer/ concrete batch mix plant (pan mixer)with SCADA CD 8 Page 163 |
| 10 | Providing and laying in situ / ready mix M-20 controlled cement concrete of trap/ granite/ quartzite/ gneiss metal for RCC work in solid/ deck slab etc. including ramming, vibrating, curing, formwork, centering and finishingincementplasterexcludingreinforcement etc.complete.(withfullyautomaticmicroprocessor basedPLCwithSCADAenabledconcretebatchmixplant/panmixerandfineagreegatesofrequired specifications ( VSI sand finely washed etc )i) Height up to 5 m, normal rate. |
| 11 | Providing, cutting, bending, hooking, tyingand laying in position TMT FE 500 steel bars for reinforcement for all RCC works as per detailed drawings etc. complete. BR.35 Page Number 134 |
| 12 | ROYALTY CHARGES FOR OTHER MINERALS |
| 13 | Laboratory testing charges are not considered in the Rate Abstracts. Where ever required separate item shall be taken in the estimate for material testing charges, on the basis of testing frequency and charges fixed by Vigilance & Quality Control Circle, for the current year and shall form part of tender.testing of material by Quality control and certified quality must be use by contractor. CONCRETE Compressive Strength of C. C. Cube (Set of 3 Cubes) |
| 14 | MIX DESIGN |