Tender for Supply of material, design, erection, testing, commissioning forS.O.P for Providing LWSS to Panchrukhi and adjoining in Palam area under Jaisinghpur constituencyin E- section BhuanaUESD Chadhiar under ED Baijnath .(SEOP-04/2025-26); 1 11 KV HT LINE 2 Prov. Steel Tublarpole9mtr longw/L 200 kg. 3 Prov. RCC Muff with concerete feelingPROVIDED BY HPSEBL 4 Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/ctolerance of 100 mm either side) x 1 structure 5 Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 1 structures 6 Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]x1 structure 7 Prov. C.I.X -Arm1800 x 100 x50 mm doublepole 8 X-Bracing Set - MS Angle Iron: 50x50x6, Length: 1800 & 2700 mm x 2 No. 9 X-Arm (Horizontal) - MS Channel Iron C type: 100X50x6, Length: 2340 mm x 2 No.] ∆ Formation 10 Earth Channel 1800X 50x50x6(MS AI ) 11 Prov. Pin Insulator with pin hellically formed fitting (set of 3 No .) 12 Disc Insulator set cleaves and tongue helically formed fitting 13 Prov.H.T Stay Set Complete PROVIDED BY HPSEBL 14 Prov.Stay wire 7/3.15 mm (@ 8.0 kg per Stay set ) PROVIDED BY HPSEBL 15 Prov. HT earthing set complete PROVIDED BY HPSEBL 16 Prov. G.I.wire 8 SWG (0.102 kg/m) 17 Danger Plate (203 x 200x1.6 mm) 18 Prov. Nut & Bolt ( off sizes) 19 Aluminum Paint 20 Prov . AAAC 7/3.15 (55mm) 21 Earth Hook HT 8 Long 22 Prov . Full Clamp (MS flate 50x6) mm 23 Prov. PolehalfClamp 24 Add transportation charges 25 Add erection charges 26 Dismentaling of conductor 27 11 KV HT LINE RE-CONDUCTRING 28 Prov. Steel Tublarpole9mtr longw/L 200 kg. 29 Prov. Steel Tublarpole11mtr longw/L 200 kg. 30 Prov. RCC Muff with concerete feelingPROVIDED BY HPSEBL 31 Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/ctolerance of 100 mm either side) x 4 structure 32 Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 4structures 33 Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]x4 structure 34 Prov. C.I.X -Arm1800 x 100 x50 mm doublepole 35 X-Bracing Set - MS Angle Iron: 50x50x6, Length: 1800 & 2700 mm x 2 No. 36 X-Arm (Horizontal) - MS Channel Iron C type: 100X50x6, Length: 2340 mm x 2 No.] ∆ Formation 37 Earth Channel 50x50x6(MS AI ) 1500mm 38 Prov. Pin Insulator with pin hellically formed fitting (set of 3 No .) 39 Disc Insulator set cleaves and tongue helically formed fitting 40 Prov.H.T Stay Set Complete PROVIDED BY HPSEBL 41 Prov.Stay wire 7/3.15 mm (@ 8.0 kg per Stay set ) PROVIDED BY HPSEBL 42 Prov. HT earthing set complete PROVIDED BY HPSEBL 43 Prov. G.I.wire 8 SWG (0.102 kg/m) 44 Danger Plate (203 x 200x1.6 mm) 45 Prov. Nut & Bolt ( off sizes) 46 Aluminum Paint 47 Prov . AAAC 7/3.1555MM 48 Earth Hook HT 8 Long 49 Prov . Full Clamp (MS flate 50x6) mm 50 Prov. PolehalfClamp 51 G.O Switch 40 Amp. PROVIDED BY HPSEBL 52 CI X arm 2400x75x40mm2 53 PVC Multi strand 4mm2 copper wire with Dia 1 inch GI pipe for concealing 54 Add transportation charges @ 5% 55 Errection of Single pole 56 Errection of Double pole 57 Errection of Stay Set 58 Errection of Earthing 59 Errection of GO switch 60 CTPT errection 61 Errection of conductor 62 Dismentalment of existing conductor 63 11/0.4kV DTR 630 KVA 64 11/0.4kV DISTRIBUTION TRANSFORMER 630 KVA 65 S/T POLE 9MTR.W/L200KG 66 MUFF PROVIDED BY HPSEBL 67 X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] forincomer line 68 MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LAs 69 X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] forsupporting DO fuse unit & GO switch 70 Transformer Bed, Belting & Knee Bracing 71 X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer bed 72 X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos forsupporting Main Channel of Transformer] 73 MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 74 MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos 75 CT/PT combined unit for 630KVADTR 76 PVC Multi strand 4mm2 copper wire with Dia 1 inch GI pipe for concealing 77 Transformer Bed,(Civil work ) + Chain link fencing, Angle iron gate extra for transformer fencing 78 MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed KneeBracing 79 Transformer LT Distribution Box and GO Switch fixing Assembly 80 MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 81 MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos 82 GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length 460mm 83 GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type 84 D.O Fuse Unit 85 Surge Arrester, 9 kV Station Class (Porcelain Type) 86 Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90KN)including Dead End Clamps etc. 87 Stay set complete PROVIDED BY HPSEBL 88 Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) PROVIDED BY HPSEBL 89 Pipe Earthing Set PROVIDED BY HPSEBL 90 Chemical Earth Copper Bonded Rod With Back Fill Compound & Conductive gel, Earth Pit Cap etc. 91 Energy Meters HT 3-ɸ, 3/4 wire CT-PT operated Static TriVector meter. (PT ratio-/ 110 V, CT ratio-/5 A 92 LT Panal Distribution Box With ACB(630A, 50KA,4P, 1No) & SFU(100A,6No, rewirable) 93 Half Clamp (M.S. Flat 50X6 mm) 94 Full Clamps (M.S. Flat 50X6 mm) 95 Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mm Φ or more (with flat and spring washers)] 96 Aluminium Thimble 97 CopperThimble 200 Amp 98 Danger Plate 99 Barbed Wire 100 LT Cable (3.5 Core) 500mm² x2 incomer 101 LT Cable (3.5 Core) 400 mm² x4 outgoing 102 Aluminium Paint. 103 Capacitor Bank 415V for 630 kVA DTR 216 kVAr 104 Add transportation charges 105 Add erection charges 106 11/0.4kV DTR 400 KVA 107 11/0.4kV DISTRIBUTION TRANSFORMER 400 KVA 108 S/T POLE 9MTR.W/L200KG 109 MUFF PROVIDED BY HPSEBL 110 X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] forincomer line 111 MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LAs 112 X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] forsupporting DO fuse unit & GO switch 113 Transformer Bed, Belting & Knee Bracing 114 X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer bed 115 X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos forsupporting Main Channel of Transformer] 116 MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 117 MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos 118 CT/PT combined unit for 400KVADTR 119 PVC Multi strand 4mm2 copper wire with Dia 1 inch GI pipe for concealing 120 Transformer Bed,(Civil work ) + Chain link fencing, Angle iron gate extra for transformer fencing 121 MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed KneeBracing 122 Transformer LT Distribution Box and GO Switch fixing Assembly 123 MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos 124 MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos 125 GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length 460mm 126 GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type 127 D.O Fuse Unit 128 Surge Arrester, 9 kV Station Class (Porcelain Type) 129 Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90KN)including Dead End Clamps etc. 130 Stay set complete PROVIDED BY HPSEBL 131 Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) PROVIDED BY HPSEBL 132 Pipe Earthing Set PROVIDED BY HPSEBL 133 3 Ph(3-Phase, 4-Wire) DLMS compliant Static Trivector Meter 134 LT Distribution Panel Boxfor 400 KVA DTR 135 Half Clamp (M.S. Flat 50X6 mm) 136 Full Clamps (M.S. Flat 50X6 mm) 137 Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mm Φ or more (with flat and spring washers)] 138 Aluminium Thimble 139 CopperThimble 200 Amp 140 Danger Plate 141 Barbed Wire 142 LT Cable (3.5 Core) 400mm² x2 incomer 143 LT Cable (3.5 Core) 240 mm² x4 outgoing 144 Energy Meters HT 3-ɸ, 3/4 wire CT-PT operated Static TriVector meter. (PT ratio-/ 110 V, CT ratio-/5 A 145 Aluminium Paint. 146 Capacitor Bank 415V for 250 kVA DTR 81 kVAr 147 Add transportation charges 148 Add erection charges 149 3-ph LT line 150 AAAC Conductor 7/3.15 mm2 151 S/T Pole 8 Mtr. W/L 140 kg 152 RCC Muff PROVIDED BY HPSEBL 153 Channel Iron (75x40x5) [Length- 1.50 Mtr + 0.2 Mtr] 154 Shackle InsulatorPROVIDED BY HPSEBL 155 D-Iron. PROVIDED BY HPSEBL 156 LT Stay Set PROVIDED BY HPSEBL 157 Stay Wire 7/3.15 mm ( @ 06 kg Per Stay Set) PROVIDED BY HPSEBL 158 Complete earthing setPROVIDED BY HPSEBL 159 G.IWire 8 SWG for Earthwire (0.102 kg/m) 160 M.S. Nuts and Bolts (Off Sizes) 161 EggInsulator PROVIDED BY HPSEBL 162 Eye Hook Bolt 163 Aluminium Paint 164 L.T Cable PVC (1.1kV, 3C, Al, Armour) 240 mm2 165 L.T Cable PVC (1.1kV, 3C, Al, Armour) 180 mm2 166 Transportation charges 167 Erection charges 168 Erection charges for AB Cable 169 Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.