Housing Urban and Rular Development Government Departments Closing in 0 days TDR #49135968

Tender For C/O Badhar Ghar At Gadiyara (Sh:- C/O Stone Masonary Work In Foundation And Structural Steel Work , Prepainted Sheet Roofing Etc )( Deposit Worksdp/2024/184 )

Issued by Government Departments · baijnath, Himachal Pradesh
Tender Value
1.45 Lakhs
Estimated cost
Bid Submission
22 May 2025
0 days left
EMD
3000
Bank guarantee accepted
Document Fee
350
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
baijnath → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

C/O Badhar Ghar at Gadiyara (SH:- C/O stone masonary work in foundation and Structural steel work , Prepainted sheet roofing etc )( Deposit workSDP/2024/184 )

BOQ

Name of Work: C/O Badhar Ghar at Gadiyara (SH:- C/O stone masonary work in foundation and Structural steel work , Prepainted sheet roofing etc )( Deposit workSDP/2024/184 )
Sl. No. Item Description
1Excavation in foundation, trenches etc. in earth work lift upto 1.50 mtr stacking the excavated soil excavated soil not more than 3 mtrsclear from the edge of excavation and then retuning the stacked soil in15cm layers, whenrequired into plinths, sides of foundation etc; consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as directed by the Engineer-Incharge, with in a lead of 20 meter.The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge.The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
2Providing and laying cement concrete 1:6:12 (One cement isto six sand isto twelve aggregate) graded crushed/broken stone aggregate 40mm (forty milimeter) nominal size mechanically mixed and curing complete, excluding cost of form work in foundation and plinth. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge.The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
3Stone filling under floor complete as per PWD specification The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge.The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
4Random rubble masonry/polygonal rubble masonry (uncoursed/brought to courses) with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (one cement : six sand : twelve graded stone aggregate 20mm (twenty) millimeter nominal size mechanical mixed in cement mortor 1:6 (one cement six sand) including curring and carriage of material within all leads and lifts complete in all respect as per direction of Engineer in Charge. The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
5Square rubble masonry coursed with hard stone of approved quality in foundation and plinth including racking out joints in cement mortar 1:6 (one cement : six sand) and curing complete including carriage of materials within all leads and lifts complete in all respect as per the direction of Engineer-in-Charge.The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
6Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 40 mm nominal size)The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government.
7Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government
8Providing and fixing pre-painted sheet roofing of kotar metal single skin trapezoidal 10 (ten) refitted sheeting 0.60mm thickness having 1060mm (one thousand sixty millimetre) cover width cover all width 1126mm, 28mm crest depth at 353mm (three hundred fifty three millimetre) 2.50mm (two decimal fifty millimetre) the main crest with at top 25mm and at lower 81mm base metal of coil rolled steel coil with zinc waiting top coat with regular modified polysters coating of approved shade and balancing reverse coat 5.5mm (five decimal five millimetre) dia and 55mm (fifty five millimetre) length with EPDM seal complete in all respect The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge.The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
9Providing and fixing pre-painted sheet ridge or hips 60cm (sixty centimetre) over all of kotar metal skin trapezoidal profiled sheeting 0.60mm cover with over all width 1126mm (one thousand one hundred twenty six) 28mm (twenty eight) crest depth at 353mm (three hundred fifty three) 2mm (two millimetre) C/C crest distance. There will be two ribs at the centre for stiffening heaving crest depth of 2.5mm (two decimal five millimetre) the main crest with at topzinc waiting top coat with regular modified polyster coating of approved shade and balancing reverse coat 5.5mm (five decimal five millimetre) dia and 550mm (five hundred fifty millimetre)length with DPDM seal complete in all respect as per approved drawing design The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge.The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.

AI Tender Summary

OUR REF NO 49135968
AUTHORITY Government Departments
TENDER VALUE 1.45 Lakhs
LAST DATE 22-05-2025
Authority
Authority Name Public Works Department
Work Description C/O Badhar Ghar at Gadiyara (SH:- C/O stone masonary work in foundation and Structural steel work , Prepainted sheet roofing etc )( Deposit workSDP/2024/184 )
Basic Detail
Tender No PWD/BD/NIT/2024-25/-1512-61 dated 09.05.2025
Bidding Type Tender
Location
City baijnath
State Himachal Pradesh
Key Dates
Publish Date 14 May 2025
Submission Date 22 May 2025
Open Date 22 May 2025
Finance
Tender Value 1.45 Lakhs
Tender Fee 350
EMD 3000
Exemption Not Available
Document List
Tendernotice_2.pdf
fc4555b8-54a7-42f3-b0de-8ecb191a79e8.html
SBD.pdf
BOQ_154156.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 14, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
May 22, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 22, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_2.pdf

html

fc4555b8-54a7-42f3-b0de-8ecb191a79e8.html

pdf

SBD.pdf

xls

BOQ_154156.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders