| 1 | Construction of New culvert 4.00spam (2Vent) and Retaining wall surplus channal cross in Vayalveli salai at Kaspakaranai panchayat |
| 2 | Earth work excavation and depositing on bank with an intial lead and lift in hard stiff clay soil as per SS 20B for foundation |
| 3 | Filling in the basement filling M.Sand including cost and conveyance to the site and all labour chages for filling as per standard specifications |
| 4 | Cement concrete 1:4:8 mix using 40mm HBG ISS metal ilncluding cost and conveyance and labour charges etc |
| 5 | Cement concrete 1:3:6 mix using 40mm HBG ISS metal inlucing cost and conveyance and labour charges etc |
| 6 | Supply and erection of centering for RCC works including cost and conveyance and labour charges for placing in position etc |
| 7 | Supply and erection of centering for RCC works including cost and conveyance and labour charges for placing in position etc |
| 8 | Cement concrete 1:2:4 mix using 20mm HBG ISS metal including cost and conveyance and labour charges |
| 9 | RCC 1:1.5:3 mix using 20mm HBG ISS metal including cost and conveyance and labour charges etc |
| 10 | Supply and fabrication of steel including cost and conveyance and labour charges for cutting and bending and placing in position etc |
| 11 | Provision for Retaining wall (Sub Estimate) |
| 12 | Earth work excavation and depositing on bank with an intial lead and lift in hard stiff clay soil as per SS 20B for foundation |
| 13 | Filling in the basement filling M.Sand including cost and conveyance to the site and all labour chages for filling as per standard specifications |
| 14 | Cement concrete 1:4:8 mix using 40mm HBG ISS metal ilncluding cost and conveyance and labour charges etc |
| 15 | Cement concrete 1:3:6 mix using 40mm HBG ISS metal inlucing cost and conveyance and labour charges etc |
| 16 | Supply and erection of centering for RCC works including cost and conveyance and labour charges for placing in position etc |
| 17 | Provision for Weephole pipes etc |
| 18 | Provision for Bitumen pad |
| 19 | Provision for Weephole pipes etc |
| 20 | Provision For Citizen board charge |
| 21 | Provision for Photographic Charges |
| 22 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |