|
| 1 | Construction of 10000 Litre Capacity OHT at Mumbalaipattinam in Mumbalai Panchayat |
| 2 | Earthworkexcavatio and depositing on bank with initial lead and lift in all clauses of soil except hard rock as per SS20BX2 etc 1st Depth |
| 3 | 2nd Depth |
| 4 | Collection and supply ofM. Sandand filling in to the basement including cost and conveyanceto the siteand all labour charges etc |
| 5 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc |
| 6 | Reinforced Cement Concrete 1:1.5:3 mix for RCCusing 20mmISS BG metal including cost and conveyance of all materials to site including all labour charges etc |
| 7 | A) Below GL |
| 8 | B) For Items 0 to1.5m Ground Level |
| 9 | C) For Column above G.L. and upto 4.50m from GL |
| 10 | D) For Column aboveand upto 4.51m to 7.32m above GL |
| 11 | E) Roof Slab 7.32m to 10.98m from GL |
| 12 | Centering the sides and soffits of Rcc structure including necessary strutting etc copmlete |
| 13 | A) PLAIN SURFACE |
| 14 | i. below GL (0 to 3.3m ) |
| 15 | ii.Above GL (0 to 3.3m ) |
| 16 | iii.Above GL (6.30m to 7.32m) |
| 17 | iv.Above GL (7.32 m to10.98m) |
| 18 | B) CURVED SURFACE |
| 19 | i.) Side Wall (Above GL 7.32m to 10.98m) |
| 20 | ii.) Above GL 10.98m |
| 21 | C) SQUARE COLUMN |
| 22 | i.) Below GL ( 0 to 3.30m) |
| 23 | ii.) Above GL (0 to 3.30m) |
| 24 | iii.) Above GL (3.30mto 4.30m) |
| 25 | iv.) Above GL (4.30m to 5.30m) |
| 26 | v.) Above GL (5.30m to 6.30m) |
| 27 | vi.) Above GL (6.30m to 7.30m) |
| 28 | Painting two coats with approved cement paint over one of priming coat over cement plastered exposed surface of the reservoid including cleaning preparing the surface and curing etc., complete |
| 29 | Supply and febrication and placing inposition mild steel or ribbed for steel and all rainfoced cement comcrete works as per the design given including cost of steel and building wire in all floors etc, complete compltying with standard specification |
| 30 | Fabrication supply delivery and fixing of outside MS ladder wide 45 cm made out of 50x50x6 mm Ms angle for sides and steps in 16mm Ms plain rods fixed at 30cm centre to centre welded, jointed etc providing with suitable |
| 31 | Providing and fiing of RCC inner access ladder in R.C.C 1:1:5:3 mis using 20 mm metal including cost and conveyance of all materials to work site and all labour charges etc.complete |
| 32 | Ventilator made up of 45 stem with 65mm GI Pipe and arms made out of 65mm GI Tee,elbow with 20cm and 65mm Pipe nipple and firmly welded etc |
| 33 | Providing Manhole cove of size 0.60x0.60M in RCC 1:1:5:3 with suitable reinforecement and 50x50x6nn MS angle fixed along edges. |
| 34 | Provision for pipe connection arrangement for inlet, outlet,source and overflow etc., including cost of pipes specials, value, labour charge |
| 35 | 65mm dia GI pipes for inlet connection |
| 36 | 65mm dia GI pipes for overflow &rainwater harvesting pipe |
| 37 | 50mm dia GI pipes Scour arrangement |
| 38 | 65mm dia GI pipes for delvery |
| 39 | 65mm dia GI pipes GI Tee |
| 40 | 65mm dia 90degree bend |
| 41 | 65mm dia GI Coupler |
| 42 | 65mm dia GI Union |
| 43 | 65mm dia GI Elbow |
| 44 | 50mm dia GI Union |
| 45 | 65x50mm dia GI Reducer |
| 46 | 75x63mm dia PVCReducer |
| 47 | 65mm dia GM Gate value |
| 48 | 50mm dia GM Gatevalue |
| 49 | Refilling with excavated earth includingalllabour charges etc complete |
| 50 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc |
| 51 | Supply and delivery of following PVC Pipes 63mmOD 4 KSC PVC Pipes |
| 52 | Conveyance of the following rigd PVC pipes, lowering to trenches and laying to proper grade and alignment etc Complete63mmOD 4 KSC PVC Pipes |
| 53 | Refilling with excavated earth includingalllabour charges etc complete |
| 54 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |