| 1 | Survey - HT |
| 2 | Survey - UG |
| 3 | Extension of Single Pole - HBM Pole |
| 4 | Extension of Single Pole - 9 mtr. PCC |
| 5 | Stringing & Sagging of ACSR 100 sq. mm - 3 Wire |
| 6 | Fixing of 33 kV Pin Insulator |
| 7 | Dismental & Refixing 11KV PIN Insulator |
| 8 | Dismental & Refixing 11KV DISC Insulator |
| 9 | Re-sagging of existing 50 sq. mm ACSR - 3 Wire |
| 10 | FIXING OF 33KV V BRACKET OR THEIR EQUIVALENT SUPPORT ON RAIL/9M POLE |
| 11 | Dismaintaling \" V\" Bracket and return to store |
| 12 | Dismaintaling and Top Adopter and return to store |
| 13 | Fixing of Cradle Guard Bracket - Single Pole |
| 14 | Fixing of Cradle Guard Bracket - Double Pole |
| 15 | Lead Wire upto 30 mtr. - 2 Wire |
| 16 | Lead Wire upto 60 mtr. - 2 Wire |
| 17 | Fixing of Cross Lacing Wire |
| 18 | Stay Set Complete - HT |
| 19 | Earthing Complete |
| 20 | Fixing of Solid Tee-Off Bracket - Single Pole |
| 21 | Fixing of Solid Tee-Off Bracket - Double Pole |
| 22 | Dismantling & Refixing of Solid Tee-Off Bracket - Single Pole |
| 23 | Laying & dressing of 11KV XLPE 3x300 sq.mm cable in the excavated cable trenches as perdrawing no. PLN(D)/SS/104 dt. 05.05.2015 and as per instruction of site engineer (Cut ncover+ Loop+Riser) |
| 24 | Supply & fixirfg of cable tag on the cable |
| 25 | Micro-Tunnelling work with laying of 160mm diam. HDPE pipe as per instruction of SiteEngineer and as per site condition with laying of U.G cable including supply of HDPE pipeas per IS: 4984-1995 including preparation and submission of drawing for such cablelaying (this rate is applicable for state highway/NH/Road with propensity of high densityof heavy vehicle) |
| 26 | Supply & fixing / laying of G.I. Pipe 150 mm dia (medium) of make TATA / JINDAL /Equivalent as per I.S.I. suitable for cable protection as per instruction of site engineer. 6 X3Mtr Each |
| 27 | Excavation of soil for making of trial hole (min. size 1.2x1x2m depth) as per instruction ofsite engineer including backfiling the excavated soil. |
| 28 | Excavation of soil for formation of cable trenches as per instruction of site engineerincluding backfiling the excavated soil. |
| 29 | Supply of kiln burnt 1st class bricks having proper size & shape suitbale for cableprotective cover as per instruction of site engineer (16nos/Mtr) |
| 30 | Laying of bricks as per drawing & instruction of site engineer |
| 31 | Making of Straight Through/Transition Joint including making of jointing pit of thefollowing 11KV 300sqmm XLPE cable without supply of jointing materials excludingmaking of \"protection duct for cable joint\" |
| 32 | Making & fixing of end termination joint indoor or outdoor type for 11 KV 300sqmm XLPEcable including fixing of the jointing box at the existing structure but without the jointingmaterials as per instruction of the Site Engineer. |
| 33 | Making protective duct for cable joint complete as per WBSEDCLs approved drawing (Ref.Drg. no.PLN(D)/SS/106, dt. 05.05.2015) |
| 34 | Supply & erection of cast iron cable marker on concrete foundation blocks for straightrun, road crossing, joint location etc. as per drawing no. PLN(D)/SS/107 or 108 dt.05.05.2015 & specification & direction of site engineer |