|
| 1 | Dewatering work by 5 HP Diesel pump set with operator & P.O.L. |
| 2 | Site Clearence before work |
| 3 | Making approach road With o/soil up to 1.50 m. lift & 30m.lead i/all complet. |
| 4 | Earth work excavation in ordinary soil / kanker mixed hard soil I/c incl allID SOR Chap. V Sl.No. 6(a) + 18 |
| 5 | Excavation of foundation in ordinary soil/sandy loam, clay or sand including all. as directed by Engineer-in-charge . As per ID SOR Chap. V Sl.No. 1(a) + 17 |
| 6 | Removal of slush from nala bed before excavation s.soil .incl allID SOR Chap. V Sl.No. 1(iii) With 5 Lift |
| 7 | Excavation of foundation in ordinary soil/sandy loam, clay or sand including all. as directed by Engineer-in-charge .ID SOR Chap. V Sl.No. 1(i) + 17 with 5 lift |
| 8 | P.C.C. Work with 1:3:6 (cement,c/sand & 20-40 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work. |
| 9 | R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in foundation. |
| 10 | R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in superstructure. |
| 11 | R.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in superstructure. |
| 12 | P.C.C. Work with 1:2:4 (cement,c/sand & 12.5-20 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work. |
| 13 | Plaster work 1:3 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work. |
| 14 | Raised pointing work 1:2 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work. |
| 15 | Laying of dry stone boulder filling in inverted filter including cost of material, labour etc. |
| 16 | Excavation in embankment in ordinary soil/sandy loam, clay or sand including lift upto 1.5 meter and lead upto 30 meter.as directed by Engineer-in-charge . As per S.O.R Chap. V Sl.No.6(a)+18 |
| 17 | Supply and fixing of sign board at site. |