| 1 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete.MORTH 408 SSR OF 2022-23 ITEM NO. 2.29 (a) & PAGE NO.24 |
| 2 | Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)a)80 mm Metal, By breaking Boulders (Hand broken). As directed by Engineer-in-charge SSR OF 2022-23 ITEM NO. 50.56 & PAGE NO.250 |
| 3 | Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) (a)40 mm Metal, By breaking Boulders (Hand broken). As directed by Engineer-in-charge SSR OF 2022-23 ITEM NO. 50.57 & PAGE NO.250 |
| 4 | Supplying soft murum at the road site, including conveying and stacking complete. SSR OF 2022-23 ITEM NO. 2.29 (b) & PAGE NO.24 MORTH 408 |
| 5 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . As directed by Engineer-in-charge SSR OF 2022-23 ITEM NO. 50.58 & PAGE NO.250 |
| 6 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete SSR OF 2022-23 ITEM NO. 2.3 & PAGE NO.24 MORTH 408 |
| 7 | Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.As directed by Engineer-in-charge SSR OF 2022-23 ITEM NO. 50.59 & PAGE NO.250 |
| 8 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete.SSR OF 2022-23 ITEM NO. 2.31 & PAGE NO.24 MORTH 408 |
| 9 | Providing and laying in-situM30 Grade unreinforced plain cement concretepavementover a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS 383, using fine & coarse aggregates combined gradationas per Table 600-3 of MORTH Specification 2013, mixed in a batching and mixing plant/ non tilting mixer and Weigh batcheras per approved mix design, admixtures, transporting to site, spreading, laying with approved make paver,compacted and finished in a continuous operation, finishing to lines and gradesas directed by Engineer-in-charge and curingby curing compound /by providing cement vata in cement Mortar 1:8 @ 0.6m X 0.6m centre to centre, admeasuring 80 mm at bottom and 40 mm at top withdepth of 75mm and maintaining the same through out curing period by any other method approved by Engineer-in-chargeBd.E.4 Page No. 289 and B-7, Page No.38 SSR OF 2022-23 ITEM NO. 24.08 & PAGE NO.131 |
| 10 | Providing and fixing board displaying information, such as \"Name of work, Tender cost, Name of Contractor, Work completion and liability period etc., having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. MORTH 801 & As directed by Engineer in Charge SSR OF 2022-23 ITEM NO. 6.36 & PAGE NO.47 |
| 11 | ROYALTY CHARGES :- Supply of Rubble, Murum, Soil, 60mm./40mm. metal (Hand broken), royalty charges are not included in the rates.[As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No.146 Dt.04 June,2021. States that the royalty charges ofRs.211.95/Cu.M. ) are considered. The surcharge levied on Royalty shall also be payable to the contractor.A)Royalty Charges [A] For Sand (As per statement). |
| 12 | Royalty Charges [B] For Other Minerals (As per statement). |
| 13 | Laboratory testing charges are not considered in the Rate Abstracts. Where ever required separate item shall be taken in the estimate for material testing charges, on the basis of testing frequency and charges fixed by Vigilance & Quality Control Circle, for the current year and shall form part of tender.testing of material by Quality control and certified quality must be use by contractor. A) BASIC TEST OF AGGREGATE Sieve Analysis |
| 14 | CONCRETE Compressive strength of C.C.Cube (Set of 3 cubes) |
| 15 | ADD 18% G.S.T |
| 16 | ADD 1% LABOUR INSURANCE |
| 17 | Add For SQM |