| 1 | Removing of the motor unit after disconnecting the electriccal connection, lubrication line etc. in all respect as per direction of the EIC. |
| 2 | Transportation of the motor set from operation site to workshop for repairing and back to site after due repairing |
| 3 | Dismantelling of motor, removing of rotor and shaft from motor, cleaning stator coilof burnt grease as per direction of the EIC. |
| 4 | Heating and varnishing of stator and rotor with Class F insulation as per direction of the EIC. |
| 5 | Dismantling of old bearing from motor rotor unit (drive end and non drive end) and fitting fixing of new bearing as per direction of the EIC. |
| 6 | Supply & delivery of drive end and Non drive end new bearing 6319 - C3as per technical specification and direction of EIC. |
| 7 | Supply & delivery of litium greass as per direction of the EIC. |
| 8 | Reapring and serviceing of soft starter as per direction of the EIC. |
| 9 | Withdrawing the VT pump and coloumn pipe, motor stool, lower half coupling adjustment nuts, key complete assembly etc. complete in all respect as per direction of EIC. |
| 10 | Dismantling of total VT pumping assembly part by part as per direction of the EIC. |
| 11 | Dismantaling of old Cutless bearing and Fitting fixing charges of new Cutless Bearing from retainer as per direction of EIC. |
| 12 | Dismantaling of old Cutless bearing and Fitting fixing charges of new Cutless Bearing for suction bowl, impeller bowl and discharge case as per direction of EIC. |
| 13 | Machining charges for bowl, suction case, discharge case and fitting and fixing impeller seal ring as per direction of EIC. |
| 14 | Dismantaling of old TBH bearing and fitting fixing of new bearing with proper allingment as per direction of EIC. |
| 15 | Removing old shaft coupling and packing box sleeve from clogged pump as per direction of EIC. |
| 16 | Fitting and fixing of Sleeve (for line shaft and packing box) as per direction of EIC. |
| 17 | Supply & delivery of gunmetal cutless bearing for retainer as per direction of EIC. |
| 18 | Supply & delivery of pump shaft as per specification and direction of EIC. |
| 19 | Supply & delivery of Line shaft as per technical specification and direction of EIC. |
| 20 | Supply & delivery of cutless bearing for bowl section and discharge case as per direction of EIC. |
| 21 | Supply & delivery of gunmatal shaft sleeve for line shaft as per direction of EIC. |
| 22 | Supply & delivery of Bearing (7319 BEP) as per direction of EIC. |
| 23 | Supply & delivery of Shaft coupling as per direction of EIC. |
| 24 | Supply & delivery of gland bush as per direction of EIC. |
| 25 | Supply & delivery of motor and pump cupling rubber pin bush as per direction of E.I.C. |
| 26 | Supply & delivery of S.S. nut bolt (20*60) as per direction of EIC. |
| 27 | Supply & delivery of S.S. nut bolt (20*90) as per direction of EIC. |
| 28 | Supply & delivery of Gland packing (16 mm) as per direction of EIC. |
| 29 | Transportation of the pump set from operation site to workshop for repairing and back to site after due repairing |
| 30 | Labour Charges for painting including paint complete in all respect as per direction of EIC. |
| 31 | Labour Charges for Refitting, testing and commissioning of total pumping set in all respect at site as per direction of EIC. |
| 32 | Re-installation and lowering ofpump assembly, motor over stool for pumpby making proper alignment with the line shaft including head shaft and motor coupling bolts and nuts including replacement of worn out rubber pads of the coupling bolts, making reconnection of the oil cooling line refixing and rearrangement of LT cable and connecting the same with the motor terminal and commissioing the system complete up to the satisfaction ofEIC. |