Tender For Rate Contract For Supply Of Machinery And Labour For Disaster Situations In District Srigangangar Area - Supply of skilled labour (Plumber/ Electrician/ Welder/ Drille/ Black Smith/ other proffesional as required at site)incl. required working tools (For working upto 8 Hrs. in a day of 24 Hrs.) 2 Supply of skilled labour (Plumber/ Electrician/ Welder/ Drille/ Black Smith/ other proffesional as required at site)incl. required working tools. (For each additional hour working beyond of 8 Hrs. in a day) 3 Supply of Semi-skilled/ Un-skilled labour incl. required working tools like kassi, favra, gainti, hammer, chiesel, tokri, tagari, etc as required at site (For working upto 8 Hrs. in a day of 24 Hrs.) 4 Supply of Semi-skilled/ Un-skilled labour incl. required working tools like kassi, favra, gainti, hammer, chiesel, tokri, tagari, etc as required at site (For each additional hour working beyond of 8 Hrs. in a day) 5 Hire charges of Generator 10 KVA with required length of wires etc for connections etcincluding POL and skilled electrician.(For working upto 8 Hrs. in a day of 24 Hrs.) 6 Hire charges of Generator 10 KVA with required length of wires etc for connections etcincluding POL and skilled electrician.(For each additional hour working beyond of 8 Hrs. in a day) 7 Hire charges of Generator 63 KVA with required length of wires etc for connections etcincluding POL and skilled electrician.(For working upto 8 Hrs. in a day of 24 Hrs.) 8 Hire charges of Generator 63 KVAwith required length of wires etc for connections etcincluding POL and skilled electrician.(For each additional hour working beyond of 8 Hrs. in a day) 9 Hire charges of Generator 125 KVA with required length of wires etc for connections etcincluding POL and skilled electrician.(For working upto 8 Hrs. in a day of 24 Hrs.) 10 Hire charges of Generator 125 KVA with required length of wires etc for connections etc including POL and skilled electrician.(For each additional hour working beyond of 8 Hrs. in a day) 11 Hire charges for Front end loader 1 cum bucket capacity @45 cum/hourincluding POL and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 12 Hire charges for Front end loader 1 cum bucket capacity @45 cum/hourincluding POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 13 Hire charges of Hydraulic Excavator (JCB)including POL and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 14 Hire charges of Hydraulic Excavator (JCB)including POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 15 Hire charges of Heavy duty & high power Hydraulic Excavator (Poclain)including POL and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 16 Hire charges of Heavy duty & high power Hydraulic Excavator (Poclain) including POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 17 Hire and running charges of light crane (Hydra 3-5 Tonne) including POL and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 18 Hire and running charges of light crane (Hydra 3-5 Tonne) including POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 19 Hire charges of crane upto 8Tincluding POL and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 20 Hire charges of crane upto 8Tincluding POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 21 Hire and running charges of crane upto 20 tonne capacityincluding POL and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 22 Hire and running charges of crane upto 20 tonne capacityincluding POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 23 Hire charges of Jack hammer (Mechanical concrete breaker) with tractorincluding POL and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 24 Hire charges of Jack hammer (Mechanicalconcrete breaker) with tractorincluding POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 25 Hire charges of Jack hammer (Manual concrete breaker) including POL or electric wire etc and skilled operator. (For working upto 8 Hrs. in a day of 24 Hrs.) 26 Hire charges of Jack hammer (Manual concrete breaker) including POL or electric wire etc and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 27 Hire chargesof Hammer (Mechanical Breaker) mounted on excavator machine including POL and skilled operator. (For working upto 8 Hrs. in a day of 24 Hrs.) 28 Hire chargesof Hammer (Mechanical Breaker) mounted on excavator machineincluding POL and skilled operator. (For each additional hour working beyond of 8 Hrs. in a day) 29 Hire charges of Three wheel 80-100 KN static rollerincluding POL and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 30 Hire charges of Three wheel 80-100 KN static rollerincluding POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 31 Hire charges of Tipper 5.5 Cum/10 tincluding POL and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 32 Hire charges of Tipper 5.5 Cum/10 tincluding POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 33 Hire charges of Tractor with trollyincluding POL and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 34 Hire charges of Tractor with trollyincluding POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 35 Hire chargesof Gas Cutter with required gas cylinders and skilled operator etc.(For working upto 8 Hrs. in a day of 24 Hrs.) 36 Hire chargesof Gas Cutter with required gas cylinders and skilled operator etc.(For each additional hour working beyond of 8 Hrs. in a day) 37 Hire charges of electric cutter/ grinder machine with wire upto 50 mtr length and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 38 Hire charges of electric cutter/ grinder machine with wire upto 50 mtr length and skilled operator (For each additional hour working beyond of 8 Hrs. in a day) 39 Hire charges of Water tanker 6KL capacity (Tractor mounted)including POL and skilled operator.(For working upto 8 Hrs. in a day of 24 Hrs.) 40 Hire charges of Water tanker 6KL capacity (Tractor mounted)including POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 41 Hire charges of Pumpset of capacity 4000 liters/Hour including POL and skilled operator. (For working upto 8 Hrs. in a day of 24 Hrs.) 42 Hire charges of Pumpset of capacity 4000 liters/Hour including POL and skilled operator.(For each additional hour working beyond of 8 Hrs. in a day) 43 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal ofexcavated earth, lead upto 50m andlift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil 44 Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.M10 grade Nominal Mix1: 3: 6 (1 cement : 3 coarse sand : 6 graded stoneaggregate 20mm nominal size). 45 Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in :Cement mortar 1 : 6 (1 cement : 6 coarse sand) 46 Half brick masonry in Superstructure , above plinth level upto floor Vlevelusing bricks of designation 75 Cement mortar 1 : 6 (1 cement : 6 coarse sand) 47 Structural steel work riveted,bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: 48 Providing and laying in position specified grade ofcement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcementfor Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.M20 grade Nominal Mix / Design Mix 49 Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. (Original producers who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code) 50 Plaster on new surface on walls in cement sand mortar 1:4 including rackingofjointsetc. complete fine finish : 20mm thick . 51 Repair of road side cuts by earthen bags using empty gunny bag or cement bag including filling by dry sandy soil or local dry soil, transporting and fixing properly at site as per directions by Engineer.