| 1 | Main. Of Tubewell |
| 2 | Only unlowering of submersible pump set along with lowering pipes depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set,reporting and transportation of pump set from tube well site to storeas per direction. |
| 3 | 65 mm/80mm |
| 4 | Only lowering of the submersible pump setinto tube well along with submersible cable, lowering pipes depth up to 120 mtr,specials etc and commissioning of the tube well. The job also includes cable jointing,checking of discharge of pump set,interconnection of lowering pipe from nearby distribution pipe line,checking of starter and reporting for completion of Job or fault/problem if any. |
| 5 | 65 mm/80mm |
| 6 | Repair Rewinding of Submersible motor includes full servicing and rewinding (wherever required) as per manufacturer\"s specification and to the satisfaction of Engineer Incharge. It includes the replacement of minor parts such as bushes (oil seal bush) Nut Bolts, washers, cable seal, gland ring, vent plug, water drain plug, etc. complete job |
| 7 | Above 10 HP to 12.5 HP |
| 8 | V-6 |
| 9 | V-8 |
| 10 | Above 12.5 HP to 15 HP |
| 11 | V-6 |
| 12 | V-8 |
| 13 | Above 15 HP to 17.5 HP |
| 14 | V-6 |
| 15 | V-8 |
| 16 | Above 17.5 HP to 20 HP & Above |
| 17 | V-6 |
| 18 | V-8 |
| 19 | Maintenance of tubewells which includes round the clock monitoring oftubewells of all sizes, completerepairs /rewinding ofsubmersible pumpsets including cost ofmaterial components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheetas directed by Engineer-in-charge for tubewell per month. |
| 20 | 0.5 HP to 5.0 HP |
| 21 | 6.0 HP to 7.5 HP |
| 22 | 8.0 HP to 10.0 HP |
| 23 | 11.0 HP to 12.5 HP |
| 24 | 13.0 HP to 15.0 HP |
| 25 | 16.0 HP to 25.0 HP |
| 26 | 26.0 HP to 45.0 HP |
| 27 | Maintenance of tubewells which includescompleterepairs /rewinding ofsubmersible pumpsets including cost ofmaterial components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of Histroy sheetas directed by Engineer-in-charge for tubewell per month. |
| 28 | 0.5 HP to 5.0 HP |
| 29 | 6.0 HP to 7.5 HP |
| 30 | 8.0 HP to 10.0 HP |
| 31 | 11.0 HP to 12.5 HP |
| 32 | 13.0 HP to 15.0 HP |
| 33 | 16.0 HP to 25.0 HP |
| 34 | 26.0 HP to 45.0 HP |
| 35 | Pump House |
| 36 | Running expenditure of pumphouses which includes completeoperation of pumpmotor , maintenance of log-books as directed by Engineer-in-charge, general upkeeping of premises, security arrangements, Regular chemical dosing in CWR, cleaning and desilting of SR/CWR/SUMP once every six months, daily valve operation under the Campus of pump house and all other works as mentioned in scope of work in tender document for per pump house per month. (excluding repairing of pumping machinery etc.) |
| 37 | upto 50 HP |
| 38 | Maintenance ofcentrifugal pump sets and motor/ Monoblock including cost ofrewinding of motor, material components & accessories required to repair pumpsets, starters etc. of electric panels, deinstallation and re installation of pumpsets complete in all respect for per Centrifugal pump set with pannel per month.maintenance ofhistroy sheetas directed by Engineer-in-charge for centrifugal pump set per month.Operated load of Centrifugal Pump sets (HP) |
| 39 | 0.5 HP to 2.5 HP |
| 40 | 3.0 HP to 5.0 HP |
| 41 | 6.0 HP to 12.5 HP |
| 42 | 13.0 HP to 20.0 HP |
| 43 | 21.0 HP to 30.0 HP |
| 44 | 31.0 HP to 40.0 HP |
| 45 | 41.0 HP to 50.0 HP |
| 46 | Rewinding of three phase squirrel cage induction motor ofMonoblock pump sets including all necessary material and of the same characteristics as original with required size of super enameled copper wire (including cost of copper wire),\"E\" class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including transportation of motor pump to and from Div/AEn/JEn store complete as per direction of engineer in charge. |
| 47 | 10.00 HP |
| 48 | 12.5 HP |
| 49 | 15.00 HP |
| 50 | 17.50 HP |
| 51 | 20.00 HP |
| 52 | Rewinding of three phase squirrel cage induction motor of HSC pump sets including all necessary material and of the same characteristics as original with required size of super enamelled copper wire (including cost of copper wire) \"E\" class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including making electric connection at site of installation of motor with starter, alignment with pump setsand transportation to and fro from installation site complete as per direction of engineer in charge at site. |
| 53 | Above 25.00 HP but upto 30.00 HP |
| 54 | Above 30.00 HP but upto 35.00 HP |
| 55 | Above 35.00HP but upto 40.00 HP |
| 56 | Above 40.00 HP but upto 45.00 HP |
| 57 | Above 45.00 HP but upto 50.00 HP |
| 58 | Above 50.00 HP but upto 60.00 HP |
| 59 | Above 60.00 HP but upto 75.00 HP |
| 60 | Above 75.00 HP but upto 100.00 HP |