| 1 | Fabrication, installation and Painting of seat for Equipments weight<= 5 Kg |
| 2 | Fabrication, installation and Painting of seat for Equipments weight>5 Kg to 40 Kg |
| 3 | Fabrication, installation and Painting of seat for Equipments weight>40 Kg to 60 Kg. |
| 4 | Installation of equipments, welding of earthing pads, fabrication & installation of earthing (including shock mounts, wherever applicable) for equipment weight <= 5 Kg |
| 5 | Installation of equipments, welding of earthing pads, fabrication & installation of earthing (including shock mounts, wherever applicable) for equipment weight> 5 Kg to 40 Kg. |
| 6 | Installation of equipments, welding of earthing pads, fabrication & installation of earthing (including shock mounts, wherever applicable) for equipment weight> 40 Kg. to 60 Kg. |
| 7 | Installation of equipments, welding of earthing pads, fabrication & installation of earthing (including shock mounts, wherever applicable) for equipment weight> 60 Kg. to 100 Kg. |
| 8 | Installation of equipments, welding of earthing pads, fabrication & installation of earthing (including shock mounts, wherever applicable) for equipment weight>100 Kg. (for purposes of paymentfor installation, weights above 100kg will be considered as two units of this category ,above 300 kg as three units of this category and so on in multiples of 100kg) |
| 9 | Galvanised iron Cable Tray for Local route (50 mm to 150mm) - Route marking, fabrication & painting of brackets at site, drilling of brackets, bracket welding onboard, installation of tray & Painting as applicableas per SoW |
| 10 | Dressing, clamping of all cables on Galvanised iron cable tray Local route (50 mm to 150mm) - Fabrication of clamps to suit at site, Final cable dressing, Fixing clamps on tray, and clamping of all cables on Galvanised iron Cable Trays.(Rate per meter of cable tray) |
| 11 | Aluminium Cable Tray for Local route (50 mm to 150mm) - Route marking, fabrication & painting of brackets at site, drilling of brackets, bracket welding onboard, installation of tray & Painting as applicableas per SoW. |
| 12 | Dressing, clamping of Aluminium Cable Tray for Local route (50 mm to 150mm)- Fabrication of clamps to suit at site, Final cable dressing, Fixing clamps on tray, and clamping of all cables on Aluminium Cable Trays. (Rate per meter of cable tray) |
| 13 | Installation of Local Cable Hanger route - Route marking, Inspection,Lug fabrication, drilling of lugs,hotwork onboard, Painting as applicableas per SoW. |
| 14 | Fabrication hangers - Hanger sizes 125mm, 175mm - single tier |
| 15 | Fabrication hangers - Hanger sizes 125mm, 175mm - two tier |
| 16 | Fabrication hangers - Hanger sizes 225mm, 275mm - single tier |
| 17 | Fabrication hangers - Hanger sizes 225mm, 275mm - two tier |
| 18 | Fabrication hangers - Hanger size 325mm- single tier |
| 19 | Fabrication hangers - Hanger size 325mm - two tier |
| 20 | Fabrication hangers - Hanger size 325mm - three tier |
| 21 | Assembly & installation of local cable hangers - Hanger sizes 125mm, 175mm - single tier |
| 22 | Assembly & installation of local cable hangers - Hanger sizes 125mm, 175mm - two tier |
| 23 | Assembly & installation of local cable hangers- Hanger sizes 225mm, 275mm - single tier |
| 24 | Assembly & installation of local cable hangers- Hanger sizes 225mm, 275mm - two tier |
| 25 | Assembly & installation of local cable hangers- Hanger size 325mm- single tier |
| 26 | Assembly & installation of local cable hangers- Hanger size 325mm - two tier |
| 27 | Assembly & installation of local cable hangers - Hanger size 325mm - three tier |
| 28 | GI Conduit for local route (Upto 25mm OD) - Route marking, bending, cutting of conduit, fabrication of installation brackets, Hot work & Installation of conduit, Painting as applicable as per SoW. |
| 29 | GI Conduit for local route (26mm to 50mm OD) - Route marking, bending, cutting of conduit, fabrication of installation brackets, Hot work & Installation of conduit, Painting as applicable as per SoW. |
| 30 | GI Conduit for local route (51mm to 75mm OD) - Route marking, bending, cutting of conduit, fabrication of installation brackets, Hot work & Installation of conduit, Painting as applicable as per SoW. |
| 31 | Threading on conduit ends; fabrication of brass end caps; threading,drilling and fitment of brass end caps for conduits upto 25mm OD, sealing cap with para-plastic cable compound |
| 32 | Threading on conduit ends; fabrication of brass end caps, threading, drilling and fitment of brass end caps for conduits of size 26mm to 50mm OD, sealing cap with para-plastic cable compound |
| 33 | Threading on conduit ends; fabrication of brass end caps, threading, drilling and fitment of brass end caps for conduits of size 51 mm to 75mm OD, sealing cap with para-plastic cable compound for conduits |
| 34 | Local Cable Tallies Installation |
| 35 | Instruction Tallies Installation |
| 36 | Equipment/Service, ECB Tallies Installation |
| 37 | Local Cable laying on Hangers,trays :- Route measurement, Receipt of cable, cutting of cable if required, Cable Laying on hangers & trays, Preliminary dressing (cable Sizes Up to 6 mm dia) |
| 38 | Local Cable laying on Hangers,trays :- Route measurement, Receipt of cable, cutting of cable if required, Cable Laying on hangers & trays, Preliminary dressing (cable Sizes > 6 up to 10 mm dia) |
| 39 | Local Cable laying on Hangers,trays :- Route measurement, Receipt of cable, cutting of cable if required, Cable Laying on hangers & trays, Preliminary dressing (cable Sizes >10 up to 25 mm dia) |
| 40 | Local Cable laying on Hangers,trays :- Route measurement, Receipt of cable, cutting of cable if required, Cable Laying on hangers & trays, Preliminary dressing (cable Sizes >25 up to 35 mm dia) |
| 41 | Local Cable laying on Hangers,trays :- Route measurement, Receipt of cable, cutting of cable if required, Cable Laying on hangers & trays, Preliminary dressing (cableSizes > 35 up to 45 mm) |
| 42 | Local Cable laying on Hangers,trays :- Route measurement, Receipt of cable, cutting of cable if required, Cable Laying on hangers & trays, Preliminary dressing(cable Sizes > 45 mm to 80mm dia) |
| 43 | Local Cable laying on Hangers,trays :- Route measurement, Receipt of cable, cutting of cable if required, Cable Laying on hangers & trays, Preliminary dressing (Fibre Optic Cable up to 20mm dia ) |
| 44 | Local Cable laying on Hangers,trays :- Route measurement, Receipt of cable, cutting of cable if required, Cable Laying on hangers & trays, Preliminary dressing (Co-Axial Cable upto 20mm dia ) |
| 45 | Local Cable laying on Hangers,trays :- Route measurement, Receipt of cable cutting of cable if required, Cable Laying on hangers & trays, Preliminary dressing (Co-Axial Cable > 20mm to 50mm dia) |
| 46 | Local Cable laying in conduits :- Route measurement, Receipt of cable, cutting of cable if required,Cable Laying in Conduits (cable Sizes Up to 6 mm dia) |
| 47 | Local Cable laying in conduits :- Route measurement, Receipt of cable, cutting of cable if required,Cable Laying in Conduits( cable Sizes > 6 up to 10 mm dia) |
| 48 | Local Cable laying in conduits :- Route measurement, Receipt of cable, cutting of cable if required,Cable Laying in Conduits (cable Sizes >10 up to 25 mm dia) |
| 49 | Local Cable laying in conduits :- Route measurement, Receipt of cable, cutting of cable if required,Cable Laying in Conduits(cable Sizes >25 up to 35 mm dia) |
| 50 | Local Cable laying in conduits :- Route measurement, Receipt of cable, cutting of cable if required,Cable Laying in Conduits (cable Sizes > 35 up to 45 mm) |
| 51 | Local Cable laying in conduits :- Route measurement, Receipt of cable, cutting of cable if required,Cable Laying in Conduits (Fibre Optic Cableup to 20mm dia ) |
| 52 | Local Cable laying in conduits :- Route measurement, Receipt of cable, cutting of cable if required,Cable Laying in Conduits (Co-Axial Cable up to 20mm dia ) |
| 53 | Local Cable laying in conduits :- Route measurement, Receipt of cable, cutting of cable if required,Cable Laying in Conduits (Co-Axial Cable of dia> 20mm to 50 mm dia ) |
| 54 | Final Dressing of all cables in local hangerroute with cable tie bands, wooden gutties etc - Hanger sizes 125, 175 mm- single tier. ( Rate per Hanger) |
| 55 | Final Dressing of all cables in local hangerroute with cable tie bands, wooden gutties etc - Hanger sizes 125, 175 mm- two tier. ( Rate per Hanger) |
| 56 | Final Dressing of all cables in local hangerroute with cable tie bands, wooden gutties etc - Hanger sizes 225, 275 mm - single tier. ( Rate per Hanger) |
| 57 | Final Dressing of all cables in local hangerroute with cable tie bands, wooden gutties etc - Hanger sizes 225, 275 mm - two tier. ( Rate per Hanger) |
| 58 | Final Dressing of all cables in local hangerroute with cable tie bands, wooden gutties etc - Hanger sizes 325, single tier. ( Rate per Hanger) |
| 59 | Final Dressing of all cables in local hangerroute with cable tie bands, wooden gutties etc - Hanger sizes 325,two tier. ( Rate per Hanger) |
| 60 | Final Dressing of all cables in local hangerroute with cable tie bands, wooden gutties etc - Hanger sizes 325,three tier. ( Rate per Hanger) |
| 61 | Cable gland plate opening, drilling, gland drilling, cable entry, cable bunching & dressing inside panel, gland sealing, sleeve insertion, ferruling, lugs crimping/ soldering, connectorisation of cables including panel opening and closing (Power Cables / Lighting / Control Cables) - Cable core size Up to 1.5 Sq.mmNote: \"EA\" refers to \"Per Core\" here. |
| 62 | Cable gland plate opening, drilling, gland drilling, cable entry, cable bunching & dressing inside panel, gland sealing, sleeve insertion, ferruling, lugs crimping/ soldering, connectorisation of cables including panel opening and closing (Power Cables / Lighting / Control Cables) - Cable core size > 1.5 sq.mm to 10 sqmmNote: \"EA\" refers to \"Per Core\" here. |
| 63 | Cable gland plate drilling, gland drilling, cable entry, cable bunching & dressing inside panel, gland sealing, sleeve insertion, ferruling, lugs crimping/ soldering, connectorisation of cables including panel opening and closing (Power Cables / Lighting / Control Cables) - Cable core size > 10 sq.mm to 35 sqmmNote: \"EA\" refers to \"Per Core\" here. |
| 64 | Cable gland plate opening, drilling, gland drilling, cable entry, cable bunching & dressing inside panel, sleeve insertion, ferruling, lugs crimping/ soldering, connectorisation of cables including panel opening and closing (Power Cables / Lighting / Control Cables) - Cable core size > 35 sq.mm to 70 sqmmNote: \"EA\" refers to \"Per Core\" here. |
| 65 | Preparation ofPlugs - cable core size Up to 1.5 Sq.mmNote: \"EA\" refers to \"Per Core\" here. |
| 66 | Preparation ofPlugs for Co-axial cable up to 20mm diaNote: \"EA\" refers to \"Per End connector\" here. |
| 67 | Preparation ofPlugs for fibre optics cable up to 20mm diaNote: \"EA\" refers to \"Per End connector\" here. |
| 68 | Preparation ofRJ 45 connector Note: \"EA\" refers to \"Per End connector\" here. |
| 69 | Preparation ofRJ 11connector Note: \"EA\" refers to \"Per End connector\" here. |
| 70 | Preparation ofPlugs for Co-axial cable >20 mm to 50 mm dia Note: \"EA\" refers to \"Per End connector\" here. |
| 71 | Checkwire of cables(Power Cables / Lighting / Control Cable)-cable core size Up to 1.5 Sq.mmNote: \"EA\" refers to \"Per Core\" here. |
| 72 | Checkwire of cables(Power Cables / Lighting / Control Cable)-cable core size > 1.5 sq.mm to 10 sqmmNote: \"EA\" refers to \"Per Core\" here. |
| 73 | Checkwire of cables(Power Cables / Lighting / Control Cable)-cable core size > 10 sq.mm to 35 sqmmNote: \"EA\" refers to \"Per Core\" here. |
| 74 | Checkwire of cables(Power Cables / Lighting / Control Cable)-cable core size > 35 sq.mm to 70 sqmmNote: \"EA\" refers to \"Per Core\" here. |
| 75 | Checkwire ofPlugs- cable core size Up to 1.5 Sq.mmNote: \"EA\" refers to \"Per Core\" here. |
| 76 | Checkwire ofPlugs for Co-axial cable up to 20mm diaNote: \"EA\" refers to \"Per End Connector\" here. |
| 77 | Checkwire ofPlugs for fibre optics cable up to 20mm diaNote: \"EA\" refers to \"Per End Connector\" here. |
| 78 | checkwire of RJ 45 connectorNote: \"EA\" refers to \"Per End Connector\" here. |
| 79 | Checkwire of RJ 11 connectorNote: \"EA\" refers to \"Per End Connector\" here. |
| 80 | Checkwire ofPlugs for Co-axial cable >20mm to 50mm diaNote: \"EA\" refers to \"Per End Connector\" here. |
| 81 | Round Cable Glands (RM 70, RM 100) ) - marking, inspection, cutting opening , Installation, welding, painting of welded area and packing |
| 82 | MCT Type Cable Glands (Size 2X1,4X1 & 4X2) - marking, inspection, cutting opening , Installation, welding & painting of welded area and packing |
| 83 | MCT Type Cable Glands (Size 6X1,6X2 & 6X3) -marking, inspection, cutting opening , Installation, welding & painting of welded area and packing |
| 84 | Deck Tubes/bulkhead gland (Size M-10 to M-25) - marking, inspection, cutting opening , welding,Installation & painting of welded area, packing |
| 85 | Deck Tubes/bulkhead gland (Size M- 35 to M-50) - marking, inspection, cutting opening , welding,Installation & painting of welded area, packing |
| 86 | Cable Slots/Coaming (Size in mm 275 x 100,225 x 200, 225 x 100, 175 x 100, 150 x 100, 125 x 100) - marking, inspection, cutting opening , welding, Installation, painting of welded area and rat proofing |
| 87 | Cable Slots/Coaming (Size in mm 50x120, 50 x 150,60 x 80) - marking, inspection, cutting opening , welding, Installation , painting of welded area and rat proofing |
| 88 | Girder Coaming (Size 50x150, 50x200, 50x235) -marking, inspection, cutting opening , welding, Installation , painting of welded area and rat proofing |
| 89 | Skilled mandays for modification. |
| 90 | Un-skilled mandays for modification |