| 1 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. |
| 2 | Supplying and filling in foundation and basement and trenches with M. SAND in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete. |
| 3 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. |
| 4 | R CEMENT CONCRETE 1:1.5:3 mixusing 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 (One cement and three sand ) and Kraft paper laid without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers. |
| 5 | Precast concrete block masonry (including Quoin Blocks, Jamb blocks, closers, etc) with Solid cement concrete blocks of approved size size made of cement concrete1:3:6 mix ( 1 cement, 3 coarse M.Sand, 6 graded stone aggregate 20mm and down gauge)in foundation and plinth in cement lime mortar 1:2:9 (1 cement, 2 lime putty 9 coarse M.Sand)/ 1:1:6 (1 cement, 1 lime putty, 6 coarse M.Sand )/ Cement 1:6 (1 cement: 6 coarse M.Sand) Details of cost for 1.89cum of precast concrete blocks masonry.) 100 sqft x 2/3 = 66 2/3 cft= 1.89cum) (No. 7.75) |
| 6 | Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS. STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm * 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over countrywood joists of size 10cm * 6.50cm spaced at about 90cm centre to centre and supported by Casuarian props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete and as directed. |
| 7 | Plain CEMENT CONCRETE 1:2:4 mix using 20mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. |
| 8 | Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication. |
| 9 | PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications. |
| 10 | Towards Cost and Supply of 110mm PVC (2.54x7.62 Slotts) rectangular Slotted Pipe |
| 11 | Filter Bed including cost and conveyance and all labour charges etc., complete |
| 12 | 4 -8mm Metal |
| 13 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}12% |