Tender For Construction Of Various Civil And Fabrication Work For Hydrogen Plant Equipment At Oil Jetty At Kandla. Construction of electrolyser building RCC foundation and grade slab as per the attached drawing and detailed engineering drawing as directed by the Engineer In charge. The work includes, marking of Co-ordinates with DGPS, Excavation in Granular Sub Base (GSB), PCC, Shuttering work, RCC work , coated TMT bar (FE 500D) as per Bar bending schedule, Back filling work with compaction, Bitumen paint to RCC work below Ground, fixing of foundtion bolts, Grouting , IPS flooring , Alakali resistant Tiles, Plastering etc as per the drawing and as ditected. 1.00 2 Construction of Sea Water Tank per the attached drawing and detailed engineering drawing as directed by the Engineer In charge. The work includes , marking of Co-ordinates with DGPS,Excavation in Granular Sub Base (GSB), PCC, Shuttering work, RCC work , coated TMT bar (FE 500D) as per Bar Bending Schedule, Back filling work with compaction, Bitumen paint to RCC work below Ground, Fixing of SS Darin Nozzles, PVC Water Stopper, Grating, Water Proof Plaster, Epoxy Coating internal surface etc as per the drawing and as ditected. 1.00 3 Construction of Dry Cooler/Cooling System RCC foundation as per the attached drawing and detailed engineering drawing as directed by the Engineer In charge. The work includes ,marking of Co-ordinates with DGPS, Excavation in Granular Sub Base (GSB), PCC, Shuttering work, RCC work , coated TMT bar (FE 500D) as per Bar bending schedule, Back filling work with compaction, Bitumen paint to RCC work below Ground, fixing of foundtion bolts, Grouting, ISMB 200, etc as per the drawing and as ditected. 1.00 4 Construction of Hydroden Storage /H2 Cascade Cylinder RCC foundation as per the attached drawing and detailed engineering drawing as directed by the Engineer In charge. The work includes marking of Co-ordinates with DGPS, Excavation in Granular Sub Base (GSB), PCC, Shuttering work, RCC work , coated TMT bar (FE 500D) as per Bar bending schedule, Back filling work with compaction, Bitumen paint to RCC work below Ground, fixing of foundtion bolts, Grouting, etc as per the drawing and as ditected.