Tender For Balanced Sewer Line Work Near Talwandi Circle, Kota - Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths full round HDPE DWC (double wall corrugated) pipes of SN8 grade as per IS 16098 (Part 2) amended upto date in trenches in complete including all material, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications,wings and as per direction of Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not bepayable.200 mm ID 2 Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.In all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar, etc.Depth upto 1.5 m 3 Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after layingipe/ foundation and disposal of surplus excavated material at a lead upto 50muitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standardrawings), re-handling of material/earth to complete the task.In hard rock (Blasting prohibited)Depth upto 1.5 m 4 Add extra for over all depth of excavation above 1.5 m and upto 3.0m over item no 17.1.4.1 5 Providing and laying in position cement concrete of specified grade over prepared base course complete including finishing, curing, all material, labour, machinery, lighting, guarding for road restoration under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size). 6 Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sheive, 20 to 50 % passing through 10mm sheive and 100 % retain on 6.3mm sheive, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer.200 mm internal diameter 7 Providing and fixing Barricading at site of work for restricting the general public using 40 mm dia M.S. pipe (B class) as vertical post with average spacing of 1.80 meter between two vertical posts, having height at least 1.5 m above road/ ground level and at least 30-45 cm below road/ ground level by making suitable size hole in road/ ground, providing and fixing suitably two rows of 100mm wide PVC Tape preferably of red colour. The M.S. pipe shall be painted in red and white colour strips as per approved pattern as and when it becomes shabby but at least after every alternate shifting at new location. After shifting/ removal of barricading the hole shall be filled up properly and site is to be cleared in all respect. (Note: measurement is to be done in linear basis) 8 Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as perMoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. 9 Dismantling of cement concrete pavement for sewer line and manholes by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), rehandling of material/earth to complete the task. 10 Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.Bituminous courses 11 Pre-cast RCC M-40 grade circular manhole conical piece with inbuiltcover and frame (height 1.305), cast-in-situ PCC M-10 gradefoundation, PCC M15 grade circular wall ID 1.425m, wall thickness200mm, wall height equal to ID of sewer pipe + one wall thickness ofpipe + 50 mm, PCC M15 grade benching and channel portion.Depth of manhole shall be measured from top of manhole coverupto lowest invert of pipe. (Depth includes in the item = height ofConical piece + ID of Sewer pipe + 1 Wall thickness of pipe +increased height of wall (if any) + 50mm) 12 Providing and fixing pre-cast RCC M-40 grade circular ring of ID1.5m, wall thickness 125mm, height 150/225/300/600/900/1200mmfor constructing extra depth of manhole beyond depth mentioned initem no-17.61.1 as per drawing 13 Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 110 mm Nominal Dia 14 Constructing providing and fixing of pre-cast RCC M-40 grade circular Road Side Inspection Chamber including earthwork with following dia and depth cylindrical piece with 100mm wall thickness, inbuilt 100mm thick base slab, inbuilt cover & frame on top, provision for 110mm OD in and out sewer connection with making proper inbuilt benching and channel with PCC M-15 grade including providing cast-in-situ 100mm thick base foundation of PCC M-10 grade, supplying and fixing circular precast SFRC Circular 300 / 450mm dia manhole cover with frame MD-10 (as per IS-12592 amended upto date), including steel reinforcement minimum @ 80kg/cum, testing for water tightness complete in all respect as per drawing, specification and the direction of the Engineer.Pre-cast Road side inspection chamber of 450mm dia (internal), 600mm depth and 750mm dia base foundation