| 1 | Water Bound Macadam Grading - 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100kNin stages to proper grade and camber, applying and brooming, stone screening to fill-up to interstices of coarse aggregate, watering and compacting to the required density Grading III as per Techincal Specification Clause 405 3BIncluding supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 2 | Providing and applying primer coat with bitumen emulsion SS-1 on prepared surface of granular Base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. Technical Specificaton Clasue (502-I).Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 3 | Providing and applying tack coat with bitumen VG-10 grade usingpressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes(But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. Technical Specificaton Clasue(SI.NO. 503).Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 4 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 Bitumen required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling witha three wheele80-100kn static roller capacity,finished to required level and gradesto be followed by Type-C seal coat. Including supply of all MaterialLabour, T&P etc also includinglabour cess, royalty and all other applicable Taxes(But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.as per Technical Specification Clause. 508.Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes(But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. Technical Specificaton Clasue(SI.NO. 503).Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 5 | Providing and laying Type-C seal coat with VG-10 bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge.as per technical specification clause 510.Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 6 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |
| 7 | Brick lining on both side of the road of M-150 bricks 7 cm. wide. 11 cm. deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-charge. SOR No. 765.Including supply of all Material, Labour, T&P etc labour cess, royalty and all other applicable Taxes required for proper completion of work as directed by Engineer in charge but excluding GST. |