}

Tender For Execution Of Contract Towards Extension Of Supply Works For Capital, Dcw And Improvement Works In Shenkottai Sub-Division In Tenkasi Division, tenkasi-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited has published Tender For Execution Of Contract Towards Extension Of Supply Works For Capital, Dcw And Improvement Works In Shenkottai Sub-Division In Tenkasi Division. Submission Date for this Tender is 24-05-2025. Electrification Work Tenders in tenkasi Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

49088805
Tender For Execution Of Contract Towards Extension Of Supply Works For Capital, Dcw And Improvement Works In Shenkottai Sub-Division In Tenkasi Division
Open Tender
Indian
Tamil Nadu
Tenkasi
24-05-2025

Tender Documents

Tender Details

Execution Of Contract Towards Extension Of Supply Works For Capital, Dcw And Improvement Works In Shenkottai Sub-Division In Tenkasi Division-- 1 Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles 2 Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles 3 Rocky ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles 4 Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles 5 Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles 6 Normal ground- Erection of 9M & 9.14M poles 7 Normal ground- Excavation of pole pit (1.25m * 0.6m*2.19m) for RSJ Pole 36 8 Normal ground- Erection of RSJ Pole 36 9 Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles 10 Rocky ground- Erection of 9M & 9.14M poles 11 Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for RSJ Pole 36 12 Rocky ground- Erection of RSJ Pole 36 13 Transporting of poles from road side to pole pit - 7.32m, 7.5m, 8m, 8.23m RCC pole 14 Transporting of poles from road side to pole pit - 9m, 9.14m RCC/PSC pole 15 Transporting of poles from road side to pole pit - RSJ Pole 36 16 Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole 17 Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole 18 Loading & unloading of RSJ pole 36 19 Loading and Unloading of Line Materials 20 Concreting of poles as per Board Standards (2*2*5). The materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.) 21 Coping of pole (0.6m*0.6m*0.35m) 22 Concreting of stay (o.3m * 0.3m * 1.5m) including materials except cement 23 Coil earthing per pole & pole earthing 24 Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) 25 Normal ground- Erection of stay set 26 Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) 27 Rocky ground- Erection of stay set 28 Fixing of V & Channel cross arm 3.5 including transporting of materials from road side to site 29 Fixing of V & Channel cross arm 4.5 including transporting of materials from road side to site 30 Fixing of LT 3Phase cross arm including transporting of materials from road side to site 31 Fixing of LT 1Phase cross arm including transporting of materials from road side to site 32 Fixing of HT LT TI fitting including transporting of materials from road side to site 33 Erection of HT Side arm with stud including transporting of materials from road side to site 34 Erection of LT Side arm with stud including transporting of materials from road side to site 35 Fixing of insulator HT/LT(per location) including transporting of materials from road side to site 36 Fixing of Tapping channel X arm 37 Fixing of 11 KVDisc 38 HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire) 39 HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire) 40 HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire) 41 For HT line clear works for For 7/2.59 ACSR (1Span/Wire) 42 For HT line clear works for For 7/3.35 ACSR (1Span/Wire) 43 For HT line clear works for For 7/3.35 ACSR (1Span/Wire) 44 LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR 45 LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR 46 For LT line clear works for For 7/2.59 ACSR (1Span/Wire) 47 For LT line clear works for For 7/3.35 ACSR (1Span/Wire) 48 For LT line clear works for For 7/4.09 ACSR (1Span/Wire) 49 Split Neutral gaurding 50 Flat guarding 51 Erection/Dismantling of transformer upto 200KVA 52 Erection/Dismantling of transformer upto 250KVA 53 Erection of feeder cable with open type fuse unit per feeder 54 Erection of feeder cable with open type fuse unit per feeder and for each addl feeder 55 Erection of feeder cable Bus bar arrangement with open type 56 Erection of DT meter 57 Loading of Distribution transformer below 200KVA 58 Unloading of Distribution transformer below 200KVA 59 Loading of Distribution transformer250KVA 60 Unloading of Distribution transformer 250KVA 61 Erection of center support (Incl. Concrete) 62 Dismantlingof center support 63 Alteration of clamps 64 Drilling less than 23mm holes per hole/slatted hole 65 Cutting of channel 66 Cutting of Flat 67 Cutting of Angle 68 RSJ pole cutting 69 LT-Changing of pin point to cut point 70 HT-Changing of pin point to cut point 71 Erection of Single Phase service connection 72 Erection of Three Phase service connection 73 Erection of CFL Lamp 74 Erection of Street light Switch box 75 Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc., 76 Dismantling of poles without concrete in damaged condition including grill separation etc., 77 Dismantling of RSJ pole 78 Providing jumpering at cut point 79 Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees 80 Tree clearence in HT or LT location- For coconut trees and Palmrah trees 81 Set right of leaning of HT pole or LT pole including X arms, TI fittings 82 Resagging of 7/2.59 ACSR conductor 83 Resagging of 7/3.15 ACSR conductor 84 Resagging of 7/4.09 ACSR conductor 85 Erection of tapping structure(Double Pole) complete as per board standard including painting 86 Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. 87 Erection of 11 KV single pole Structure including erection of DT complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. 88 Erection of Guarding X arm 89 Dismantling of stay set complete including stay rod 90 Dismantling of stay set complete Without stay rod 91 Dismantling of conductor of 7/2.59 including transporting the conductors to the nearest road side and stocking in coils 92 Dismantling of conductor 7/3.35 including transporting the conductors to the nearest road side and stocking in coils 93 Dismantling of conductor 7/4.09 including transporting the conductors to the nearest road side and stocking in coils 94 Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side 95 Dismantling of V Cross arm 96 Dismantling of 3 phase X Arm 97 Dismantling of Single phase X arm 98 Dismantling of HT/LT TI Fitting 99 Dismantling of HT/ LT pin Insulators 100 Dismantling of Strain Disc 101 Dismantling of Tapping channel X arm 102 Proving PA Jumpering 103 Hiring of JCB 104 Hiring of Crane 105 Exceeding 1 Hour for every hour 106 Transporting of Charges of DT / Line materials using private vehicle upto 20 KM( Up and Down) 107 Beyond 20 KM for every KM

Key Value

Document Fees
Refer document
EMD
INR 2500.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail