| 1 | Dismantling of flexible pavements and disposal of dismantled Materials upto a lead of 1000 mtrs. Stacking serviceable and unserviceable Materials separately. (MoRTH specification : Clause 202) BY MECHANICAL MEANS Bituminous Courses |
| 2 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock pilling at designated locations and disposal of dismantled Materials upto a lead of 1000 mtrs. stacking serviceable and unserviceable Materials separately.(MoRTH specification : Clause 202) |
| 3 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS:8887 & manufacturer’s specifications @6 kg/10 sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the Material uniformly at specifiedrates and temperatures (including cleaning of road surface) as per MoRTH specification : Cl. 502, 112 |
| 4 | Providing and applying tack coat on the prepared surface, with bitumen emulsion as per IS:8887 & manufacturer’s specifications @0.2 kg/sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the Material uniformly at specified rates and temperatures (including cleaning of road surface) as per MoRTH specification Cl. 502, 112. |
| 5 | Providing and laying Dense Bituminous Macadam on prepared surface with specified graded crushed aggregates (as per table 500-9, 500-10 and design mix) for base/binder course including loading of Material with F.E. loader, heating of binder (including cost of anti stripping compound, wherever required) aggregates and filler in hot mix plant (40-60 TPH), transporting the mixed Material by tippers and laying with sensor paver finisher as per clause 504.3.5 to the required level and grade, rolling by self propelled power rollers and vibratory rollers or pneumatic tyred roller, 150-250 KN. TP=0.7 Mpa, to achieve the desired density (approved by the department) but excluding primer/tack coat. (MoRTH specification : clause 505, 112). with all lead & lift(c) 50-75mm compacted thickness with 4.25% bitumen content VG30 grade |
| 6 | Providing and laying Bituminous Concrete as per Design Mix on prepared surface with specified graded stone aggregates as per Table 500-17, for wearing course including loading of aggregates with F.E. loader and hot mixing of binder (including cost of anti-stripping compound, wherever required) and 3% cement filler with aggregates in Hot Mix Plant 40-60 TPH, transporting the mixed Material with tipper to paver and laying with sensor paver finisher (as per clause 504-3.5) to the required level, grades and rolling with vibratory compactor and pneumatic tyred roller 150-250 kN, TP = 0.7 Mpa, to achieve the desired density (approved by the department as per job mix) excluding cost of primer/tack coat. (MoRTH specification : clause 507). with all lead & lift50-65mm compacted with 5.5% binder (a) With straight run bitumen grade VG30 |
| 7 | Dry lean cement concrete sub - base.Construction of dry lean cement concrete 1:3:6 sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size ofcoarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blening to be as per Table 600-1, cement content not to be less than 200 Kg/Cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonne vibratory roller, finishing and curing. |
| 8 | Providing and Laying un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub-base with 43 grade cement, coarse and fine aggregate conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or Fix form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures and vacuum processing pump as approved, curing compound, finishing to lines and grades as per drawing as per MoRTH Specification : Clause No. 602, 112. Using Cement concrete M-25 pavement Grade |
| 9 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface : Providing and laing of hot applied thermoplastic compound 2.5 mm thick including reflectoriesing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC : 35. The finished surface to be level, uniform and free from streaks and holes |
| 10 | Providing and laying in position specified grade ofcement concrete forall RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix |
| 11 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings,strap beam, raft , bases of columns etc. |
| 12 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. (\"Original producers\" who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) |
| 13 | Painting with synthetic enamel paint of approved brand and manufacture togive an even shade : Two or more coats on new work |