| 1 | MATERIAL |
| 2 | Supply of C.I.Mechenical compression collar coupling (popularly known as Jifty TM Collar Coupling ) Suitable for C.I. Sun Pipes (as per IS -1536 /2001) & D.I. Pipes (as per IS -8329 /2000), complete with sealing rubber gasket of S.B.R. C.I. follower glans and M.S. nut bolts. The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS-1538/1993 |
| 3 | 100mm |
| 4 | 150mm |
| 5 | 200mm |
| 6 | 250mm |
| 7 | 300mm |
| 8 | 350mm |
| 9 | 400mm |
| 10 | 450mm |
| 11 | MJP DSR 2018-19 P. No. 260, I. No. 2 |
| 12 | Supply of C.I.Mechenical compression flanged / Socket Tail Piece (Populalrly known as I™ Flanged / socket Tail Piece) Suitable for making flanged connecting with the plain barrel of C.I. spun pipes (as per IS - 1536 /2000), The tail Piece complete with sealingrubber gasket of S.B.R.,C.I. follower glands and M.S. nut bolts . |
| 13 | 80mm |
| 14 | 100mm |
| 15 | 150mm |
| 16 | 200mm |
| 17 | 300mm |
| 18 | 350mm |
| 19 | MJP DSR 2018-19 P. No. 260 I. No. 1 |
| 20 | Supply of C.I. Mechanical joint all socket, Tees as dimensionally describedin tube -18 of 13382/1992 complete with sealing rubber gasket,of SBR with cast iron follower gland & mild steel nut bolts coated or otherwise protected from &suitable for CI pipes |
| 21 | 100x100x100 |
| 22 | 200x100x200 |
| 23 | 150x100x150 |
| 24 | 200x150x200 |
| 25 | 150x150x150 |
| 26 | 250x100x250 |
| 27 | 300x150x300 |
| 28 | MJP DSR 2018-19 P. No. 264 ,I.No.7 |
| 29 | Supply of C.I. Mechanical joint double socket with flanged tee as dimensionally describedin tube -18 of 13382/1992 complete with sealing rubber gasket,of SBR with cast iron follower gland & mild steel nut bolts coated or otherwise protected from &suitable for CI pipes |
| 30 | 100x100x100 |
| 31 | 150x150x100 |
| 32 | 200x200x100 |
| 33 | MJP DSR 2018-19 P. No. 264 ,I.No.8 |
| 34 | Supply of C.I. Mechanical Joint Double socket 90 (1/4) Bends as dimensionaaly Described in Table -14 of IS -13382/1992 complete with sealing rubber gasket (dimensionally described in IS -12820/ 1989 ) with cast iron following gland & mild steel nut bolts coated or otherwise protected from rustin & suitable for CI pipes |
| 35 | 100mm |
| 36 | 150mm |
| 37 | 200mm |
| 38 | 250mm |
| 39 | 300mm |
| 40 | MJP DSR 2018-19 P. No. 261 ,I.No.3 |
| 41 | Supply of C.I. Mechanical Joint Double socket 90 (1/4) reducer asDescribed in Table -21 of IS -13382/1992 complete with sealing rubber gasket (dimensionally described in IS -12820/ 1989 ) with cast iron following gland & mild steel nut bolts coated or otherwise protected from rustin & suitable for CI pipes |
| 42 | 150x100mm dia |
| 43 | 200x100mm dia |
| 44 | 200x150mm dia |
| 45 | 300x150mm dia |
| 46 | MJP DSR 2018-19 P. No. 267 ,I.No.9 |
| 47 | Providing double flange sluice valve conforming to IS-2906/14846 including work gear arrengements as per test pressure, stainless steel, spindle , caps,excluding GST leived by GOI & GOM in all respect |
| 48 | c) sluice valve -PN-1.6(without by pass) |
| 49 | 65mm |
| 50 | 50mm |
| 51 | 80mm |
| 52 | 100mm |
| 53 | 150mm |
| 54 | 200mm |
| 55 | 250mm |
| 56 | 300mm |
| 57 | 350mm |
| 58 | MJP DSR 2018-19 P. No. 236 ,I.No.2 |
| 59 | Providing and supplying ISI marked D.I.S.& S pipes (push on joints pressures pipes of D.I. of following class and diameters conforming to the cost of jointing materials (rubber gasket of EPDM quality ) excluding all staturoty duties and taxes levied by Govt. of India and Govt. of Mahrashtra in all respect education cess, VAT third party inspection charges of TPI agency approved by MJP, including tranist insurance ,railway freight , unloading ,stacking , etc. complete , as directed by engineer -in -charge .(IS- 1536/2001 for pipes and IS 12820/1989 or latest edition revision with amendments for rubber gaskets)(IS 18329-2000 latest version ) |
| 60 | D.I.K-7 |
| 61 | 100mm |
| 62 | 150mm |
| 63 | 200mm |
| 64 | 250mm |
| 65 | 300mm |
| 66 | 350mm |
| 67 | 400mm |
| 68 | 450mm |
| 69 | MJP DSR 2018-19 P.No.86, I. No. 3 |
| 70 | Providing and supplying ISI Mark rubber gasket suitable for C.I.or D.I.Pipes of all class for tyton joints including ,inspection charges, transporation to departmantel stores /site etc.excluiding leived by GOI & GOM in all respect complete |
| 71 | 100mm |
| 72 | 150mm |
| 73 | 200mm |
| 74 | 250mm |
| 75 | 300mm |
| 76 | 350mm |
| 77 | 400mm |
| 78 | 450mm |
| 79 | MJP DSR 2018-19 P. No. 254 .I. No. 21 (A) |
| 80 | Welding in all position with required number of runs, for M.S. pipe internally and /or externally including gauging Wherever necessary fixing ,appurtenance & other accessories in connection with pipe laying work as per specification . |
| 81 | 6mm |
| 82 | 8mm |
| 83 | MJP DSR 2018-19 P, No. 211,I.No.7(A) add 10%for H.A. |
| 84 | Supplying Brass, gunmetal material for spindle & check |
| 85 | 80mm |
| 86 | Check Nut |
| 87 | 100mm |
| 88 | Check Nut |
| 89 | 150mm |
| 90 | Check Nut |
| 91 | 200mm |
| 92 | Check Nut |
| 93 | 250mm |
| 94 | Check Nut |
| 95 | 300mm |
| 96 | Check Nut |
| 97 | 350mm |
| 98 | Check Nut |
| 99 | 400mm |
| 100 | Check Nut |
| 101 | 450mm |
| 102 | Check Nut |
| 103 | Gland Russi for Sluice valve |
| 104 | 6mm to 20mm |
| 105 | MATERIAL |
| 106 | Providing of ISI Mark G.I. pipes of following class & dia, excluding all local & central taxes octrol inspectipon charges ,transportation to stores etc . Complete .(ISI 1239/ 2004) Note-one coupler should be prvidedwith each full length pipe,cost of which is included in rates below |
| 107 | 15mm (withoutE.D) |
| 108 | 20mm |
| 109 | 25mm |
| 110 | 40mm |
| 111 | 50mm |
| 112 | 65mm |
| 113 | 80mm |
| 114 | 100mm |
| 115 | MJP DSR 2018-19 P. No. 110, I. No. 1(B) |
| 116 | G.I. Bend \"B\" class |
| 117 | (MJP mechanical CSR -2018-19 P. No. -14 code No-PW 1) |
| 118 | 15mm |
| 119 | 25mm |
| 120 | 40mm |
| 121 | 50mm |
| 122 | 65mm |
| 123 | 75mm |
| 124 | 100mm |
| 125 | G. I. Tee \"B\" Class |
| 126 | (MJP mechanical CSR -2018-19 P. No. -14 code No-PW 2) |
| 127 | 15mm |
| 128 | 25mm |
| 129 | 40mm |
| 130 | 50mm |
| 131 | 65mm |
| 132 | 75mm |
| 133 | 100mm |
| 134 | 150mm |
| 135 | G.I. Coupling /Nipple \"B\" Class |
| 136 | (MJP mechanical CSR -2018-19 P. No.14 code No-PW3) |
| 137 | 15mm |
| 138 | 25mm |
| 139 | 40mm |
| 140 | 50mm |
| 141 | 65mm |
| 142 | 75mm |
| 143 | 100mm |
| 144 | 150mm |
| 145 | G.I. Union (Heavy Duty ) |
| 146 | (MJP mechanical CSR -2018-19 P. No-15 code No -PW 4) |
| 147 | 15mm |
| 148 | 25mm |
| 149 | 40mm |
| 150 | 50mm |
| 151 | M.S.Flanges |
| 152 | (MJP mechanical CSR -2018-19 P.No-16 code No -PW 10) |
| 153 | UP to 300 NB |
| 154 | Above 300 NB |
| 155 | NUT- BOLTS DSR pune PWD 16-17 |
| 156 | LABOUR |
| 157 | Excavation for foundation / pipe trenches in earth, soil of all types sand ,gravel & soft murrum including removing the execavated material upto a distance of 50 meters & lifts as below, stacking &spreading as directed , normal dewatering ,preparing the bed for foundation & excluding backfilling etc complete |
| 158 | MJP DSR 2018-19 P. No. 47, I. No. 1 add 10% for H.A |
| 159 | Excavationfor foundation / pipe trenches in Hard murum & boulders,WBM roadincluding t removing the execavated material upto a distance of 50 meters beyond the area & lifts as below , stacking & spreadingas directed , normal dewatering , prepairing the bed for foundation& excluding backfilling. |
| 160 | MJP DSR 2018-19 P. No. 47, I. No. 2 add 10% for H.A. & 2% for municipal area |
| 161 | Excavation for foundation /Pipe trenches in soft rock & old cement &lime masonary foundation asphalt road including remoing the excavated materials upto a distance of 50 meter & lifts as below , stacking &spreading as directed normal dewatering , prepairing the bed for foundation & excluding backfilling |
| 162 | MJP DSR 2018-19 P. No. 47 ,I.No. 5 add 10% for H.A. |
| 163 | Excavation for foundation / pipe trenches in Hard rock & concrete road by chiseling, welding, line drying by mechanical means or by all means other than blasting including & leveling the bed, removing the excavated materials upto a distance of 50 meter & lifts as below , stacking & spreading as directed , normal dewatering , preparing the bed for foundation && excluding backfilling |
| 164 | MJP DSR 2108-19 P. No. 48 ,I. No. 7 add 10% for H.A. |
| 165 | Refiling the trenches with available excavated stuff with soft material first over pipeline & then hard material in 15 cm layers with all leads & lifts including consolidation , surcharging complete |
| 166 | MJP DSR 2018-19 P. No. 50, I. No. 15 add 10%for H.A. |
| 167 | Making cross connection to exiting distribution main of any type including excavation breaking & removing existing pipes, lowering , laying , of specials &pipes in their position ,refiling , closing the water supply in that area, dewatering & restarting the water supply etc. complete as directed by Engineer In Charge for following diameter of existing pipeline, irrespective of diameter of branch line . (the number of joints involved will be paid seperately depending upon the nature of) |
| 168 | 80mm |
| 169 | 100mm |
| 170 | 150mm |
| 171 | 200mm |
| 172 | 250mm |
| 173 | 300mm |
| 174 | 350mm |
| 175 | 400mm |
| 176 | 450mm |
| 177 | MJP DSR 2018-19 P. No. 73 add 10% for H.A. |
| 178 | Dewatering the excavated trenches and pools of water in thebuilding trenches / Pipeline trenches well works by using pump and other device including disposing off water to safe distance as directed by engineer - In -charge(Including cost of |
| 179 | MJP DSR 2018-19 P. No. 52 ,I. No. 14 add 10% for H.A.& 2% for municipal area |
| 180 | Lowering laying and jointing with SBR rubber gasket C.I. / D. I. SS Pipes of various classes with C.I. /D.I. MS specials of following diameter in proper position , grade and aligments as directed by Engineer-In-charge including conveyance of material from store to site of work , including cost of jointing material and rubber rings labour etc complete |
| 181 | 80mm |
| 182 | 100mm |
| 183 | 150mm |
| 184 | 200mm |
| 185 | 250mm |
| 186 | 300mm |
| 187 | 350mm |
| 188 | 400mm |
| 189 | 450mm |
| 190 | MJP DSR 2018-19 P.No. 84, I . No. 2(A) add 10% for H.A. |
| 191 | Lowering laying and jointing In position following C.I. D /F Reflux valves, Buttrefly valves and sluice valves incluiding all labour jonting material,incluiding nut bolts and giving satisfactory hydraulic testing etc. complete (Rate for all class and valves) |
| 192 | 100mm |
| 193 | 150mm |
| 194 | 200mm |
| 195 | 250mm |
| 196 | 300mm |
| 197 | 350mm |
| 198 | MJP DSR 2018-19 P. No. 240 ,I. No. 4 add 10% |
| 199 | Providing and constructing B.B. masnory valve chamber with 15 cm thick 1:3:6 proportion PCC bedding excluding excavation , B.B. Masnory in CM 1:5 proportion precast RCC frame and cover etc. complete as directed by Engineer-In- charge .As above of 90 x 45 cm internal size depthupto 1.2 M with pre cast RCC slab cover |
| 200 | MJP DSR 2018-19 P.No. 385 ,I. No. 1(8) add 10% for H.A. |
| 201 | Providing and laying in situ cement concrete M -15 of trap/ granite /quartzite / gneiss metal for foundation and bedding including boiling out water , from work compaction, |
| 202 | MJP DSR 2016 -17 P. No.43 ,I. No. 1(b) add 10% for H.A. MJP DSR 2018-19 P.No. 385 ,I. No. 1(8) add 10% for H.A. |
| 203 | Dismantling dead pipeline G.I. /A. C. /P.V.C. /S. W./H. D. P. E. pipe including cost of necessary excavation and refiling of trenches, breaking the joints ,lifting the pipes and stacking to the place as directed by Engineer - In - charge with all leads and lifts incluiding ceaning thearea etc complete |
| 204 | For M.S. /R.C.C./C.I. /P.S.C. |
| 205 | 80mm |
| 206 | 100mm |
| 207 | 150mm |
| 208 | 200mm |
| 209 | 250mm |
| 210 | 300mm |
| 211 | 350mm |
| 212 | 400mm |
| 213 | MJP DSR 2018-19 P. No.74 ,I. No. 11(A) add 10% for H.A. |
| 214 | For G. I./A. C. /P.V.C. /S.W./H.D.P.E. |
| 215 | 80mm |
| 216 | 100mm |
| 217 | 150mm |
| 218 | 200mm |
| 219 | 250mm |
| 220 | 300mm |
| 221 | 350mm |
| 222 | MJP DSR 2018-19 P. No. 11 (B) add 10% for H.A. |
| 223 | Lowering laying and jointing G.I. pipes and specials of following class and diameter including conveyance from stores to site of works .All labour , giving satisfactory hydraulic test , etc. complete .Either underground or in vertical position as directed by engineer in-charge |
| 224 | 15mm |
| 225 | 20mm |
| 226 | 25mm |
| 227 | 40mm |
| 228 | 50mm |
| 229 | 65mm |
| 230 | 80mm |
| 231 | 100mm |
| 232 | MJP DSR 2018-19 P. No. 113 ,I. No. 2 (B) add 10% for H.A. |
| 233 | Providing& suppling ISI mark CI D/F reflux valve (non eturn valve)of following dia.incluiding railway freight inspection charges,unloading from railway wagon,loading into truck transportation charges upto departemental stores unloading stacking excluiding GST leived by GOI & GOM in all respect etc completeReflux valve as per I.S.5312 part I(1984) |
| 234 | c) sluice valve -PN-1.6(without by pass) |
| 235 | 100mm |
| 236 | 150mm |
| 237 | 200mm |
| 238 | 250mm |
| 239 | 300mm |
| 240 | 350mm |
| 241 | Providing& supplingAir Valves as per IS-14845 and MJP std specifications double orifice type combined withscrew down isolating valve,small orifice elastic ball resting on a gun metal orifice nipple,large orifice vulcanite ball seating on moulded seat ring,inlet face and drilled,incluiding insurance,loading,unloading,transportation upto departmental stores,excluiding GST leived by GOI& GOM in all respect etc complete |
| 242 | b) Air valve Double Ball flanged -PN-1.6 |
| 243 | 50mm |
| 244 | 65mm |
| 245 | 80mm |
| 246 | 100mm |
| 247 | MJP DSR 2018-19 P. No. 243 ,I. No. 6 (B) |
| 248 | Lowering,laying & fixing in proper alignment an position all typs of C.I.air valves as directed by Engineer-in-charge incluiding cost of conveyance from stores to site of work,cost of all material and giving satisfactory hydraulic testing etc complete (for all class of valves) |
| 249 | b) Air valve Double Ball(PN-1 & PN-1.6) |
| 250 | 50mm |
| 251 | 65mm |
| 252 | 80mm |
| 253 | 100mm |
| 254 | MJP DSR 2018-19 P. No. 247 ,I. No. 10 (B) |
| 255 | Fairwell 1/2\" |
| 256 | Fairwell 1\" |
| 257 | Solvent(greese) |
| 258 | 1\"UPVC Pipe |
| 259 | 0.5\"UPVC Pipe |
| 260 | 2\"UPVC Pipe |
| 261 | 1\"UPVC socket |
| 262 | 0.5\"UPVC socket |
| 263 | 2\"UPVC socket |
| 264 | 1\"UPVC Brass elbow |
| 265 | 0.5\"UPVC Brass Elbow |
| 266 | 1\"UPVC Brass F.T.A. |
| 267 | 0.5\"UPVC Brass F.T.A. |
| 268 | 1\"UPVC Brass M.T.A. |
| 269 | 0.5\"UPVC Brass M.T.A. |
| 270 | 1\"UPVCelbow |
| 271 | 0.5\"UPVCelbow |
| 272 | 2\"UPVCelbow |
| 273 | 1\"UPVCT |
| 274 | 0.5\"UPVCT |
| 275 | 2\"UPVCT |
| 276 | 1\"UPVCunion |
| 277 | 0.5\"UPVCunion |
| 278 | 2\"UPVCunion |
| 279 | end cap |
| 280 | a) 100mm |
| 281 | b) 200mm |
| 282 | c) 150mm |
| 283 | Asbestas sheet |
| 284 | (sr no. 35 to sr no. 59are as per market price) |
| 285 | Providing and supplying in std.length ISI marked rigid unplasticized PVCpipes suitable for portable water with solvent cement joints incluiding cost of couplers .excluding all staturoty duties and taxes levied by Govt. of India and Govt. of Mahrashtra in all respect education cess, VAT,chargesincluding tranist insurance ,railway freight , unloading ,stacking , etc. complete , as directed by engineer -in -charge . Note-one coupler & required cement solventshall be provided with each full length pipe cost of which is included in rates below |
| 286 | a) Working pressure 6 kg/sq.cm |
| 287 | 75mm |
| 288 | 90mm |
| 289 | 110mm |
| 290 | MJP DSR 2018-19 P. No. 97 ,I. No. 2(b) |
| 291 | Lowering laying and jointing with PVCpipes and specials of following class and diameter including conveyance from stores to site of works .All labour , giving satisfactory hydraulic test , etc. complete . as directed by engineer in-charge |
| 292 | 75mm |
| 293 | 90mm |
| 294 | 110mm |
| 295 | MJP DSR 2018-19 P. No. 97 ,I. No. 4 (b) |
| 296 | Fiarwel 1/2 |
| 297 | Fiarwel 1/2 |
| 298 | NRV Valves PN-10. 200 mm |
| 299 | NRV Valves PN-10. 350 mm |
| 300 | NRV Valves PN-10. 50 mm |
| 301 | NRV Valves PN-10. 40 mm |
| 302 | काँक्रीटी खिळे |
| 303 | 1/2\" U.P.V.C पाईप |
| 304 | 1/2\" U.P.V.C ब्रास F.T.A |
| 305 | 1/2\" U.P.V.C ब्रास M.T.A |
| 306 | 1/2\" U.P.V.C ब्रास एल्बो |
| 307 | 1/2\" U.P.V.C एल्बो |
| 308 | 1/2\" U.P.V.C टी |
| 309 | 1/2\" U.P.V.C टॅक नेपल |
| 310 | 1/2\" U.P.V.C सॉकेट |
| 311 | 1/2\" U.P.V.C युनेन |
| 312 | 1\" U.P.V.C पाईप |
| 313 | 1\" U.P.V.C ब्रास F.T.A |
| 314 | 1\" U.P.V.C ब्रास M.T.A |
| 315 | 1\" U.P.V.C ब्रास एल्बो |
| 316 | 1\" U.P.V.C टी |
| 317 | 1\" U.P.V.C सॉकेट |
| 318 | 1\" U.P.V.C टँक नेपर |
| 319 | 1\" U.P.V.C युनेन |
| 320 | 1\" U.P.V.C क्लिप |
| 321 | 1\" U.P.V.C वॉल्व |
| 322 | 1\" U.P.V.C एल्बो |
| 323 | 1\" G.I बेन्ड |
| 324 | 1\" G.I होज नेपल |
| 325 | 1\"क्लिप |
| 326 | 1\" एन्ड कॅप |
| 327 | सिमेंट |
| 328 | स्वॉलवट |
| 329 | 2\" U.P.V.C पाईप |
| 330 | 2\" U.P.V.C ब्रास F.T.A |
| 331 | 2\" U.P.V.C ब्रास M.T.A |
| 332 | 2\" U.P.V.C ब्रास एल्बो |
| 333 | 2\" U.P.V.C टी |
| 334 | 2\" U.P.V.C सॉकेट |
| 335 | 2\" U.P.V.C टँक नेपर |
| 336 | 2\" U.P.V.C युनेन |
| 337 | 2\" U.P.V.C क्लिप |
| 338 | 2\" U.P.V.C वॉल्व |
| 339 | 2\" U.P.V.C एल्बो |
| 340 | 2\" G.I बेन्ड |
| 341 | 2\" G.I होज नेपल |
| 342 | 2\"क्लिप |
| 343 | 2\" एन्ड कॅप |
| 344 | सी टँक पाण्याची टाकी |
| 345 | Providing and supplying in standard lengthsPolyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges,conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOMinallrespectetc.complete. |
| 346 | A.) PE-100,6Kg/Sq.cm: |
| 347 | i) 63mm Rmt 112 |
| 348 | ii) 75mm Rmt 155 |
| 349 | iii) 90mm Rmt 220 |
| 350 | iv) 110mm Rmt 319 |
| 351 | v) 125mm Rmt 437 |
| 352 | vi) 140mm Rmt 549 |
| 353 | vii) 160mm Rmt 711 |
| 354 | viii) 180mm Rmt 895 |
| 355 | ix) 200mm Rmt 1049 |
| 356 | PE-100,8Kg/Sq.cm: |
| 357 | i) 63mm Rmt 140 |
| 358 | ii) 75mm Rmt 187 |
| 359 | iii) 90mm Rmt 266 |
| 360 | iv) 110mm Rmt 391 |
| 361 | v) 125mm Rmt 507 |
| 362 | vi) 140mm Rmt 693 |
| 363 | vii) 160mm Rmt 897 |
| 364 | viii) 180mm Rmt 1133 |
| 365 | ix) 200mm Rmt 1333 |
| 366 | x) 225mm Rmt 1712 |
| 367 | xi) 250mm Rmt 2110 |
| 368 | xii) 280mm Rmt 2644 |
| 369 | Lowering,LayingandJointingH.D.P.E./M. D. P. E. pipes in proper position including allspecials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part |
| 370 | Forallclasses. |
| 371 | i) 20mm Rmt. 13 |
| 372 | ii) 25mm Rmt. 21 |
| 373 | iii) 32mm Rmt. 26 |
| 374 | iv) 40mm Rmt. 35 |
| 375 | v) 50mm Rmt. 41 |
| 376 | vi) 63mm Rmt. 50 |
| 377 | vii) 75mm Rmt. 54 |
| 378 | viii) 90mm Rmt. 75 |
| 379 | ix) 110mm Rmt. 78 |
| 380 | x) 125mm Rmt. 90 |
| 381 | xi) 140mm Rmt. 120 |
| 382 | xii) 160mm Rmt. 130 |
| 383 | xiii) 180mm Rmt. 130 |