| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] |
| 2 | [10.30.2]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 2. Medium shade pigment using 50% white cement 50% Grey cement [Through Rate] |
| 3 | [11.68.3]Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works [Through Rate] |
| 4 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] |
| 5 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] |
| 6 | [17.8.1]Compaction 1. Extra for laying earth/fly ash as per specifications in 20 cm layers and dressing but excluding the cost of rolling [Through Rate] |
| 7 | [2.RM079] RM079.Earth Costorcompensation for earth taken from private land [Rate] |
| 8 | [26.4.3]SITE CLEARANCE 3. clearing jungle manually including uprooting rank vegetation , grass, woody vegetation up to 30cm girth measured at height 1 m above ground level and removal of rubbish up to a distance of 50 m out side the periphery of the area cleared [Through Rate] |
| 9 | [3.1.2]By Mechanical Transport including loading, unloading and stacking2. Earth [Beyond 5km up to 10km per KM] |
| 10 | [30.37.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. Old work (Two or more coat applied @ 1.67 litre/ 10 sqm) on existing cement paint surface [Through Rate] |
| 11 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] |
| 12 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 13 | [6.14.2]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 14 | [6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts [Through Rate] |
| 15 | [6.39.1]Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] |
| 16 | [7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] |
| 17 | Providing and fixing of Children playing Equipments i.e Double Slide dimension Length 16`-6` Width 6` height 8` made of UV stablized virgin LLDP plastic is used, plastic closed panel used, Laser punched staircase and platform, Galvanized poles used in main structure including loading unloading, carriage, fixing charge etc complete in all respect and to the entire satisfaction of engineer-in-charge (M.R) (Rates are inclusive of GST) |
| 18 | Providing and fixing of Children playing Equipment`s i.e Four Seater See Saw dimension 9`- 1O` (length) 1 `-7` (Width) 1 `-8` height made of LLD PE sheets 04 nos. pastis ball 04 Nos., GI poles, J 14 mm with 3.2 mm thickness, 25mm bearings used galvanized pipe and further pipe and further powder coated and make a structure and LLDPE plastic granules, which area further rotomolded to form plastic seats. These high grade plastic components arc not toxic, antistatic, fire retardant and the colors are UV stabilized, no sharp corner and rough surface in metal parts •which are used as per Indian Standard to make this SEE Saw including loading unloading, carriage, fixing charges etc. complete in all respect and to the entire satisfaction of Engineer-in charge |
| 19 | Providing and fixing of Children playing Equipment`s i.e Merry Go Round New dimension 4`-0` (dia) x 3`-9` height made of non MS sheet. to make the base in round shape to get no sharp corners and rough surface in metal parts. This product in ideal for 3-4 Children which goes round and round for kids fun including loading, unloading, carriage, fixing charges etc. complete in all respect and to the entire satisfaction of Engineer-in-charge (including GST) |
| 20 | Providing and fixing of Children playing Equipment i.e. FUNSTATION dimension 10`-0` x 4`-07` made of non toxic durable LLDPE and plastic material. It is weather resistant and waterproof. Sturdy and durable including loading unloading, carriage, fixing charges etc complete in all respect and to the entire satisfaction of Engineer-in-charge (Rates are included GST) |
| 21 | Providing and fixing of various types of GYM Equipments i.e. AIR WALKER, KNEE CHAIR, ARM SHOULDER WHEEL, TWISTER, CYCLING, HYPER EXTENSION, CHEST SHAPER/SEATED CHEST PRESS as per complete specification already/allotted by the chief Engineer HSVP Panchkula vide his letter no. 63689 dated 13.05.2020 |