| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by EngineerCement Concrete Grade M-15 and above and PCC blocks |
| 2 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. |
| 3 | Carriage of Materials by mechanical transport includingloading, unloading and stacking :: Sand, bazri,ballast, kankar |
| 4 | 100 mm dia C.I. transition coupling joint |
| 5 | 125 mm dia C.I. transition coupling joint |
| 6 | 150 mm dia C.I. transition coupling joint |
| 7 | 200 mm dia C.I. transition coupling joint |
| 8 | 250 mm dia C.I. transition coupling joint |
| 9 | 25 mm dia C.I. Air Valve |
| 10 | 50 mm dia C.I. Air Valve |
| 11 | 100 mm dia CI Duckfoot Bend |
| 12 | 125 mm dia CI Duckfoot Bend |
| 13 | 150 mm dia CI Duckfoot Bend |
| 14 | 200 mm dia CI Duckfoot Bend |
| 15 | 250 mm dia CI Duckfoot Bend |
| 16 | 100 mm dia C.I. puddle collar |
| 17 | 125 mm dia C.I. puddle collar |
| 18 | 150 mm dia C.I. puddle collar |
| 19 | 200 mm dia C.I. puddle collar |
| 20 | 250 mm dia C.I. puddle collar |
| 21 | 110 mm ID/ND PVC-U pipes (stiffness class SN 8) as per IS 15328 |
| 22 | 160 mm ID/ND PVC-U pipes (stiffness class SN 8) as per IS 15328 |
| 23 | 200 mm ID/ND PVC-U pipes (stiffness class SN 8) as per IS 15328 |
| 24 | 250 mm ID/ND PVC-U pipes (stiffness class SN 8) as per IS 15328 |
| 25 | Labour Charges for leakage repair in existing pipe line of PVC/HDPE/ GRP including dewatering etc. complete but excluding thecost of pipes, specials, joints etc as directed by site engineer forfollowing dia. (Earthwork to be measured and paid separately)75-200 mm dia |
| 26 | Labour Charges for leakage repair in existing pipe line of PVC/HDPE/ GRP including dewatering etc. complete but excluding thecost of pipes, specials, joints etc as directed by site engineer forfollowing dia. (Earthwork to be measured and paid separately)250-500 mm dia |
| 27 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). |
| 28 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 29 | Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 30 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : 1:4 (1 cement : 4 fine/ coarse sand) |