Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-07-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 29-07-2025 |
| 2 | 07-07-2025 | Corrigendum5 | Date | 22-07-2025 |
| 3 | 26-06-2025 | Corrigendum4 | Date | 15-07-2025 |
| 4 | 19-06-2025 | Corrigendum3 | Date | 04-07-2025 |
| 5 | 12-06-2025 | Corrigendum2 | Date | 27-06-2025 |
| 6 | 05-06-2025 | Corrigendum1 | Date | 20-06-2025 |
| Sl. No. | Item Description |
| 1 | SEWAGE TREATMENT PLANT(75 KLD CAPACITY) Design, supplying, fabrication, installing, testing & commissioning of Pre fabricated package type Sewage Treatment Plantof capacity 75 KLD. The sewage treatement shall be based on MBR technology. The nature of effluent from domestic sewage from toilets and kitchen shall be discharge seperately into the STP. The cost will also include MS puddle flange, Inlet, Outlet, overflow, test line, drain line, by-pass line, vent, foot rest, inspection platform with railing, moving ladder and making support for pipes. Complete Sewage Treatment Plant of capacity 75 KLD to be provided as per the details given in Schedule \"A\" Part-I from page No 38 to 42 of CA. |
| 2 | Designing, Supplying, Developing, Installing and CommissionSCADA System for 75KLD Sewage Treatment Plant along with various Automation equipment for STP as indicated and as per details attached. The STP SCADA system shall comprise Complete Sewage Treatment Plant of capacity 75 KLD to be provided as per the details given in Schedule \"A\" Part-I from page No 43 of CA. |
| 3 | Supplying installation testing and commissioning of extendable, compartmentalised, front operated , back openable, LT cubicle STP panel having ingress protection of IP 54, suitable for operation on 415 Volt 3 phase 50 c/s power supply fabricated out of 2 mm thick CRCA sheet steel and base channel of MS section not less than 100mmX50mmX5mm, gland plate of 3 mm thick cleanedand treated in 7 tank process and powder coated with approved shade with TPN Electrolytic Aluminiumbusbar of 100A duly insulated in colour coding & suitable to withstand 25 MVA fault lavel complete with supplying & installationof following equipment including interconnection, control wiringetc as required. All MCCBs shall have microprocessor based release & shall have manually operated handle.It includes all wiring , cabling of required sizes from STP panel board to each electrical parts with on site control panel for individual motors . The panel will consists of following Items as per drawings attached.(Panel shall be of outdoor type installation with suitable IP Protection) (a) Incomming :-(i)100Amp,4Pole,MCCB (25KA) with Microprocessor =01 No (ii) R.Y.B Phase indication lamp with fuse =1 set.(iii) 0-100 A Digital Ammeter 150/5A Class 10 , 1 set(iv) 0-500V Digital Voltometer with Control MCB 1 set (b) Out Going :- (i) 40 Amp, TP MCCB 15KA ICSwith automatic star deltaStarter as per type -2 cordination with single phase preventer under/ overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 sets(For Two Numbers Air blowers , 110m3/hr. (0.50 wc) 5.0HP motor each).Blower Model Number :AB 4130 (ii)10A TP MCCB 10KA ICSwith automatic DOL Starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set of 2 numbers(One Working +One standby) (For Wet Well Submercible sewer pumps ,Qty : Two Numbers ,2.0 H.P each pump(1 working + one standby) Discharge 3.6 m3/hr.10m head. (iii) 6A TP MCCB 10KAICS with automatic DOLStarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -1 nos: (For One number anoxic tank submerged mixer ,1.0 HP each) Model SUZ/RW3033 |
| 4 | Item no. 3 (contd...)(iv) 10A TP MCCB 10KAICSwith automatic star deltaStarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos(One working+one standby) (For Two Numbers RAS pumps ,2 H.P each) 150LPM. (v) 6A TP MCCB 10KAICSwith automatic star deltaStarter as per type -2 cordination with single pahse preventer under/overvoltage protection, overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. - Two numbers(One Working+One Standby) Filter press feed pumps , 0.5 H.P each). (vi) 6A TP MCCB 10KAICSwith automatic star deltaStarter as per type -2 cordination with single pahse preventer under/overvoltage protection, overload and short circuit protection,R.Y.B Phase indication lamp with fuse . -2 nos: (For One number Filter PressHydraulic press machine motor , 0.5 H.P. (vii) 10A TP MCCB 10KA ICS with DOLstarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers(One working +one standby)PERMEATE PUMPS 1.5 HP each pump) 4.0 m3/hr. Head : 20mWC (Two numbers ) VFD operated. (viii) 10A TP MCCB 10KA ICS with DOLstarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection, R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For One numbers Air compressormotor 2.0 HP each pump) 200 LPM , 125 psi pressure.(ix) 6A TP MCCB 10KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers (1 Working +One standby) MBR C.I.P Pumps and other fitting parts , 1.0 HP each) (x) 6A DP MCB 10KAICSwithunder/overvoltage protection,overload and short circuit protection, indication lamp with fuse 1 set. -2 nos: (For SIX numbers Pneumatic Valves with flange fitting parts each) (xi) 6A DP MCBunder/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers Citric AcidDosing Pumps ) |
| 5 | Item no. 3 (contd...)(xii) 6A TP MCCB 15KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbersCITRIC ACID MIXER ,0.5 HP each) (xiii) 6A DP MCBunder/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers HypoDosing Pumps ) (xiv) 6A TP MCCB 10KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers Hypo Mixer ,0.5 HP each) (xv) 6A TP MCCB 10KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers Treated water Distribution Pumps, 4 HP each). (xvi)6A DP 10 KA for ON line Monitoring System and two number flow meters (xvii) 16A DP 10 KA for Spare -03 No for PLC board. (xviii) 32A DP 10 KA for Spare -03 No for STP Plant building & Street light.The above panel includes all kind of MCB , MCCB, MPCB, ENERGY METER , Indication Lights , Selector Switches ,Push Button. |
| 6 | SEWAGE TREATMENT PLANT(50 KLD CAPACITY) Design, supplying, fabrication, installing, testing & commissioning of Pre fabricated package type Sewage Treatment Plantof capacity 50 KLD. The sewage treatement shall be based on MBR technology. The nature of effluent from domestic sewage from toilets and kitchen shall be discharge seperately into the STP. The cost will also include MS puddle flange, Inlet, Outlet, overflow, test line, drain line, by-pass line, vent, foot rest, inspection platform with railing, moving ladder and making support for pipes. Complete Sewage Treatment Plant of capacity 50 KLD to be provided as per the details given in Schedule \"A\" Part-I from page No 44 to 48 of CA. |
| 7 | Designing, Supplying, Developing, Installing and Commission STP SCADA System for 50 KLD Sewage Treatment Plant along with various Automation equipment for STP as indicated and as per details attached. The STP SCADA system shall comprise Complete Sewage Treatment Plant of capacity 50 KLD to be provided as per the details given in Schedule \"A\" Part-I from page No 49 of CA. |
| 8 | Supplying installation testing and commissioning of extendable, compartmentalised, front operated , back openable, LT cubicle STP panel having ingress protection of IP 54, suitable for operation on 415 Volt 3 phase 50 c/s power supply fabricated out of 2 mm thick CRCA sheet steel and base channel of MS section not less than 100mmX50mmX5mm, gland plate of 3 mm thick cleanedand treated in 7 tank process and powder coated with approved shade with TPN Electrolytic Aluminiumbusbar of 100A duly insulated in colour coding & suitable to withstand 25 MVA fault lavel complete with supplying & installationof following equipment including interconnection, control wiringetc as required. All MCCBs shall have microprocessor based release & shall have manually operated handle.It includes all wiring , cabling of required sizes from STP panel board to each electrical parts with on site control panel for individual motors . The panel will consists of following Items as per drawings attached.(Panel shall be of outdoor type installation with suitable IP Protection) (a) Incomming :-(i)63Amp,4Pole,MCCB (25KA) with Microprocessor =01 No (ii) R.Y.B Phase indication lamp with fuse =1 set. (iii) 0-100 A Digital Ammeter 150/5A Class 10 , 1 set (iv) 0-500V Digital Voltometer with Control MCB 1 set (b) Out Going :- (i) 40 Amp, TP MCCB 15KA ICSwith automatic star deltaStarter as per type -2 cordination with single phase preventer under/ overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 sets(For Two Numbers Air blowers , m3/hr. ( 0.50 wc) 5.0HP motor each).Blower Model Number :AB 4130 (ii)10A TP MCCB 10KA ICSwith automatic DOL Starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set of 2 numbers(One Working +One standby) (For Wet Well Submercible sewer pumps ,Qty : Two Numbers ,2.0 H.P each pump(1 working + one standby) Discharge 2.4 m3/hr.10m head. (iii)10A TP MCCB 10KA ICSwith automatic DOL Starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set of 2 numbers pumps (One working+one standby) (For Wet Well cutter Submercible sewer pumps ,Qty : two Numbers ,2.0 H.P each pump) Discharge 4m3/hr.10m head. |
| 9 | Item no. 6(contd...)(iv) 6A TP MCCB 10KAICS with automatic DOLStarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -1 nos: (For One number anoxic tank submerged mixer ,1.0 HP each) Model SUZ/RW3033 (v) 10A TP MCCB 10KAICSwith automatic star deltaStarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos(One working+one standby) (For Two Numbers RAS pumps ,2 H.P each) 150LPM.(vi) 6A TP MCCB 10KAICSwith automatic star deltaStarter as per type -2 cordination with single pahse preventer under/overvoltage protection, overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. - Two numbers(One Working+One Standby) Filter press feed pumps , 0.5 H.P each) (vii) 6A TP MCCB 10KAICSwith automatic star deltaStarter as per type -2 cordination with single pahse preventer under/overvoltage protection, overload and short circuit protection,R.Y.B Phase indication lamp with fuse . -2 nos: (For One number Filter PressHydraulic press machine motor , 0.5 H.P.(viii) 10A TP MCCB 10KA ICS with DOLstarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers(One working +one standby)PERMEATE PUMPS1.5 HP each pump) 3.0 m3/hr. Head : 20mWC (Two numbers ) VFD operated. (ix) 10A TP MCCB 10KA ICS with DOLstarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For One numbers Air compressormotor 2.0 HP each pump) 150 LPM , 125 psi pressure.(x) 6A TP MCCB 10KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers (1 Working +One standby) MBR C.I.P Pumps and other fitting parts , 1.0 HP each) |
| 10 | Item no. 6(contd...)(xi) 6A DP MCB 10KAICSwithunder/overvoltage protection,overload and short circuit protection, indication lamp with fuse 1 set. -2 nos: (For SIX numbers Pneumatic Valves with flange fitting parts each) (xii) 6A TP MCCB 15KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbersCITRIC ACID MIXER ,0.5 HP each) (xiii) 6A DP MCBunder/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers Hypo Dosing Pumps ) (xiv) 6A TP MCCB 15KAICSwith DOL starter as per type -2 cordination with single pahse preventer uner/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbersCITRIC ACID MIXER ,0.5 HP each) (xv) 6A DP MCBunder/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers Hypo Dosing Pumps ) (xvi) 6A TP MCCB 10KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers Hypo Mixer ,0.5 HP each)(xvii) 6A TP MCCB 10KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers Treated water Distribution Pumps, 3 HP each).(xviii)6A DP 10 KA for ON line Monitoring System and two number flow meters (xix) 16A DP 10 KA for Spare -03 No for PLC board. (xx) 32A DP 10 KA for Spare -03 No for STP Plant building & Street light. The above panel includes all kind of MCB , MCCB, MPCB, ENERGY METER , Indication Lights , Selector Switches , Push Button. |
| 11 | SEWAGE TREATMENT PLANT(25 KLD CAPACITY) Design, supplying, fabrication, installing, testing & commissioning of Pre fabricated package type Sewage Treatment Plantof capacity 25 KLD. The sewage treatement shall be based on MBR technology. The nature of effluent from domestic sewage from toilets and kitchen shall be discharge seperately into the STP. The cost will also include MS puddle flange, Inlet, Outlet, overflow, test line, drain line, by-pass line, vent, foot rest, inspection platform with railing, moving ladder and making support for pipes. Complete Sewage Treatment Plant of capacity 25 KLD to be provided as per the details given in Schedule \"A\" Part-I from page No 50 to 54 of CA. |
| 12 | Designing, Supplying, Developing, Installing and Commission STP SCADA System for 25 KLD Sewage Treatment Plant along with various Automation equipment for STP as indicated and as per details attached. The STP SCADA system shall comprise Complete Sewage Treatment Plant of capacity 25 KLD to be provided as per the details given in Schedule \"A\" Part-I from page No 55 of CA. |
| 13 | Supplying installation testing and commissioning of extendable, compartmentalised, front operated , back openable, LT cubicle STP panel having ingress protection of IP 54, suitable for operation on 415 Volt 3 phase 50 c/s power supply fabricated out of 2 mm thick CRCA sheet steel and base channel of MS section not less than 100mmX50mmX5mm, gland plate of 3 mm thick cleanedand treated in 7 tank process and powder coated with approved shade with TPN Electrolytic Aluminiumbusbar of 100A duly insulated in colour coding & suitable to withstand 25 MVA fault lavel complete with supplying & installationof following equipment including interconnection, control wiringetc as required. All MCCBs shall have microprocessor based release & shall have manually operated handle.It includes all wiring , cabling of required sizes from STP panel board to each electrical parts with on site control panel for individual motors . The panel will consists of following Items as per drawings attached.(Panel shall be of outdoor type installation with suitable IP Protection). (a) Incomming :-(i)63 Amp,4Pole,MCCB (25KA) with Microprocessor =01 No(ii) R.Y.B Phase indication lamp with fuse =1 set.(iii) 0-100 A Digital Ammeter 150/5A Class 10 , 1 set(iv) 0-500V Digital Voltometer with Control MCB 1 set(b) Out Going :- (i) 32 Amp, TP MCCB 15KA ICSwith automatic star deltaStarter as per type -2 cordination with single phase preventer under/ overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 sets(For Two Numbers Air blowers , m3/hr. ( 0.50 wc) 3.0HP motor each).Blower Model Number :AB 4130(ii)10A TP MCCB 10KA ICSwith automatic DOL Starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set of 2 numbers pumps (One working+one standby) (For Wet Well cutter Submercible sewer pumps ,Qty : two Numbers ,1.5 H.P each pump) Discharge 4m3/hr.10m head. |
| 14 | (ii)10A TP MCCB 10KA ICSwith automatic DOL Starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set of 2 numbers(One Working +One standby) (For Wet Well Submercible sewer pumps ,Qty : Two Numbers ,2.0 H.P each pump(1 working + one standby) Discharge 1.2 m3/hr.10m head.(ii)10A TP MCCB 10KA ICSwith automatic DOL Starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set of 2 numbers pumps (One working+one standby) (For Wet Well cutter Submercible sewer pumps ,Qty : two Numbers ,1.5 H.P each pump) Discharge 4m3/hr.10m head.iii) 6A TP MCCB 10KAICS with automatic DOLStarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -1 nos: (For One number anoxic tank submerged mixer ,1.0 HP each)Model SUZ/RW3033(iv) 10A TP MCCB 10KAICSwith automatic star deltaStarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos(One working+one standby) (For Two Numbers RAS pumps ,2 H.P each) 75LPM.(v) 6A TP MCCB 10KAICSwith automatic star deltaStarter as per type -2 cordination with single pahse preventer under/overvoltage protection, overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. - Two numbers(One Working+One Standby) Filter press feed pumps , 0.5 H.P each) vi) 6A TP MCCB 10KAICSwith automatic star deltaStarter as per type -2 cordination with single pahse preventer under/overvoltage protection, overload and short circuit protection,R.Y.B Phase indication lamp with fuse . -2 nos: (For One number Filter PressHydraulic press machine motor , 0.5 H.P.vii) 10A TP MCCB 10KA ICS with DOLstarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers(One working +one standby)PERMEATE PUMPS1.0 HP each pump) 2.0 m3/hr. Head : 20mWC (Two numbers ) VFD operated. |
| 15 | Item no. 9 (contd...)(viii) 10A TP MCCB 10KA ICS with DOLstarter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For One numbers Air compressormotor 1.0 HP each pump) 100 LPM , 125 psi pressure.(ix) 6A TP MCCB 10KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers (1 Working +One standby) MBR C.I.P Pumps and other fitting parts , 1.0 HP each)(x) 6A DP MCB 10KAICSwithunder/overvoltage protection,overload and short circuit protection, indication lamp with fuse 1 set. -2 nos: (For SIX numbers Pneumatic Valves with flange fitting parts each)(xi) 6A DP MCBunder/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers Citric AcidDosing Pumps )(xii) 6A TP MCCB 15KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbersCITRIC ACID MIXER, 0.5 HP each)(xiii) 6A DP MCBunder/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers Hypo Dosing Pumps )(xiv) 6A TP MCCB 10KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers Hypo Mixer ,0.5 HP each)(xv) 6A TP MCCB 10KAICSwith DOL starter as per type -2 cordination with single pahse preventer under/overvoltage protection,overload and short circuit protection,R.Y.B Phase indication lamp with fuse 1 set. -2 nos: (For Two numbers Treated water Distribution Pumps, 1.5 HP each).(xvi)6A DP 10 KA for ON line Monitoring System and two number flow meters(xvii) 16A DP 10 KA for Spare -03 No for PLC board.(xviii) 32A DP 10 KA for Spare -03 No for STP Plant building & Street light.The above panel includes all kind of MCB , MCCB, MPCB, ENERGY METER , Indication Lights, Selector Switches,Push Button. |
| 16 | Lumpsum price worked out by the contractor for construction of building as listed in Schedule \"A\" Part-II. |
| 17 | Lumpsum price worked out by the contractor forInternal Water Supply as listed in Schedule \"A\" Part-III. |
| 18 | Lumpsum price worked out by the contractor forInternal Electric Supply as listed in Schedule \"A\" Part-IV. |
| 19 | Lumpsum price worked out by the contractor forEarth work as listed in Schedule \"A\" Part-V. |
| 20 | Lumpsum price worked out by the contractor forPathway as listed in Schedule \"A\" Part-VI. |
| 21 | Lumpsum price worked out by the contractor forFencing & Gate as listed in Schedule \"A\" Part-VII. |
| 22 | Lumpsum price worked out by the contractor forArea Drainage as listed in Schedule \"A\" Part-VIII. |
| 23 | Lumpsum price worked out by the contractor forExternal Electric Supply as listed in Schedule \"A\" Part-IX. |
| 24 | Lumpsum price worked out by the contractor forExternal Water Supply as listed in Schedule \"A\" Part-X. |
| 25 | Lumpsum price worked out by the contractor forSTP Disposal Lines as listed in Schedule \"A\" Part-XI. |
| 26 | Material and Labour for disconnecting electric connections, excavation in hard / dense soil by using mechanical earth excavater & mannuallabour , taking out old dameged Cable with & includingrepair to damaged cable by inserting new straight through joint cold shrink type complete with jointing material and accessories to jointing kit for 1100 Volts(Earthed)grade suitable for 3.5 core XLPE armoured aluminium conductor cable of size 25sqmm to 95 sqmm, & including necessary returning filling&removal of surplus spoil a to distance as directed, and make the electric cable line functional to the entire satisfaction of JE & AGE ; complete all as specified and directed by the Engineer-in-Charge. |
| 27 | Material and Labour for disconnecting electric connections, excavation in hard / dense soil by using mechanical earth excavater & mannuallabour , taking out old dameged Cable with & includingrepair to damaged cable by inserting new straight through joint cold shrink type complete with jointing material and accessories to jointing kit for 1100 Volts(Earthed)grade suitable for 3.5 core XLPE armoured aluminium conductor cable of size 120 sqmm to 185 sqmm, & including necessary returning filling&removal of surplus spoil a to distance as directed, and make the electric cable line functional to the entire satisfaction of JE & AGE ; complete all as specified and directed by the Engineer-in-Charge. |
| 28 | Material and Labour for Disconnecting , dismantling &cutting the existing damaged water supply pipe line bursting/cracks ,including excavation in hard / dense soil by using mechanical earth excavater & manuallabour , taking out old dameged CI /GI/MS defective or misaligned water supply pipe line of any size carefully after disconnection of joints to a length up to 8 metres and create bund with excavated earth and dewatering / bailing out water from the trenches complete with pumping set and including repair the water supply pipe line by replacing the pipe line up to8metres of length & inserting necessary CI / GI/MS specials , spares and jointing the pipe line with necessary lead joints and positioning the pipe line after repairs complete t& including necessary returning filling&removal of surplus spoil a to distance as directed, and make the water supplyline functional to the entire satisfaction of JE & AGE ; complete all as specified and directed by the Engineer-in-Charge. Note :- (a) The rates quoted for this deemed to included for tool and plant and transportation required for attending the repair work.(b) The breakdown shall be attended within 4 Hrs of intimation round the clock and time of restoration shall be maximum of 8 Hours. The additional manpower required to complete the job in quoted rate is deemed to be included in the quoted. |
| 29 | Material and Labour for disconnecting electric connections, excavation in hard / dense soil by using mechanical earth excavater & mannuallabour , taking out old dameged Cable with & includingrepair to damaged cable by inserting new straight through joint cold shrink type complete with jointing material and accessories to jointing kit for 11000 Volts(Earthed)grade suitable for 3 core XLPE armoured aluminium conductor cable of size 50 sqmm to 95 sqmm, & including necessary returning filling&removal of surplus spoil a to distance as directed, and make the electric cable line functional to the entire satisfaction of JE & AGE ; complete all as specified and directed by the Engineer-in-Charge. |
| 30 | Material and Labour for disconnecting electric connections, excavation in hard / dense soil by using mechanical earth excavater & mannuallabour , taking out old dameged Cable with & includingrepair to damaged cable by inserting new straight through joint cold shrink type complete with jointing material and accessories to jointing kit for 11000 Volts(Earthed)grade suitable for 3 core XLPE armoured aluminium conductor cable of size 120 sqmm to 185 sqmm, & including necessary returning filling&removal of surplus spoil a to distance as directed, and make the electric cable line functional to the entire satisfaction of JE & AGE ; complete all as specified and directed by the Engineer-in-Charge. |
| 31 | Supply and fixing of DBOXx MCB Protected socketWith 25 A MCB DBOXX COMBO with sheet steel Enclosure single pole 25 Amp, with 3 pin plug topfor AC connection from Socket point to stabilizer ; complete all as specified and directed by the Engineer-in-Charge. |
| 32 | Supply and fixing of LED Lamp 9/10 watt Holder Type B22 Base with polycarbonate body and aluminium heat sink warm white complete all as specified and directed by Engineer - in - Charge. |
| 33 | Material and Labour for disconnecting water supply lines, excavation in hard / dense soil by using mechanical earth excavater & mannuallabour , taking out old dameged by cutting existing GI/CI of any size/typeof water supply pipe line &including making new connection for PPR pipe including short pieces , inserting tees, bends, sockets, unionetc with existing water line & including necessary returning filling&removal of surplus spoil a to distance as directed, and make the water supply line functional to the entire satisfaction of JE & AGE ; complete all as specified and directed by the Engineer-in-Charge. |
| 34 | Material and Labourfor Construction of valve chambers of internal size not less than 1000mm X 1000mm X 1050mm with 15cm thick solid concrete block masonary, block casted using PCC 1:3:6 type C-1 mix built in cement and sand mortar (1:4), 10mm thick plaster to thick internal surface and external surface up to 15 cm below ground level and top of floor in cement mortar (1:4) finished surfaces even and smooth without using extra cement,15mm thick MS sheet cover including 40mm x 40mm x 6mm MS angle frame embedded in 150mm thick PCC 1:2:4 type B-1, with 25mm x 6mm flat iron hold fast, handles, hinges with locking arrangements, & including applying one coat of red oxide primer and two coats of synthetic enamel paintto all steel surface , complete including necessary excavation earth work in type of soil , returning filling&removal of surplus spoil a to distance as directed .; complete all as specifiedand directed by the Engineer-in-Charge. |
| 35 | Material and Labourfor Construction of valve chambers of internal size not less than 600mm X 600mm X 600mm with 15cm thick solid concrete block masonary, block casted using PCC 1:3:6 type C-1 mix built in cement and sand mortar (1:4), 10mm thick plaster to thick internal surface and external surface up to 15 cm below ground level and top of floor in cement mortar (1:4) finished surfaces even and smooth without using extra cement,15mm thick MS sheet cover including 40mm x 40mm x 6mm MS angle frame embedded in 150mm thick PCC 1:2:4 type B-1, with 25mm x 6mm flat iron hold fast, handles, hinges with locking arrangements, & including applying one coat of red oxide primer and two coats of synthetic enamel paintto all steel surface , complete including necessary excavation earth work in type of soil , returning filling&removal of surplus spoil a to distance as directed .; complete all as specifiedand directed by the Engineer-in-Charge. |
| 36 | Supply , Install , Testing & Commissioning of Centrifugal Pumpset of capacity 1.5HP/1KW,3 phase, 415 Volts, 50 Hz, 2900 RPM, min Head range - 25 metres at 312.50 L.P.M flow rate, horizontal type , inlet & outlet size -50mm can withstand wide voltage fluctuation from 200-440 Volts, designed to prevent overloading and motor burntout, dynamically balanced rotating parts to ensure minimum vibratios during running, CED coated cast iron components for rust free & longer life. and motor body & delivery casing made of material- cast iron , shaft- stainless steel including, NRV of suitable size,cable complete all as specified. (01 set including 02 Nos of pumps one working & one standby); complete all as specifiedand directed by the Engineer-in-Charge. |
| 37 | Supply , Install , Testing & Commissioning of Centrifugal Pumpset of capacity 3HP/2.24 KW, 3 phase, 415 Volts, 50 Hz, 2900 RPM, min Head range- 64 metres at 104.17 L.P.M flow rate, horizontal type , inlet & outlet size -50 mm can withstand wide voltage fluctuation from 200-440 Volts, designed to prevent overloading and motor burntout, dynamically balanced rotating parts to ensure minimum vibratios during running, CED coated cast iron components for rust free & longer life. and motor body & delivery casing made of material- cast iron , shaft- stainless steel including, NRV of suitable size, cable complete all as specified. (01 set including 02 Nos of pumps one working & one standby) ; complete all as specifiedand directed by the Engineer-in-Charge. |
| 38 | Supply , Install , Testing & Commissioning of Centrifugal Pumpset of capacity 4HP/3KW , 3 phase, 415 Volts, 50 Hz, 2900 RPM, min Head range- 25 metres at 350 L.P.M flow rate, horizontal type , inlet & outlet size -50 mm can withstand wide voltage fluctuation from 200-440 Volts, designed to prevent overloading and motor burntout, dynamically balanced rotating parts to ensure minimum vibratios during running, CED coated cast iron components for rust free & longer life. and motor body & delivery casing made of material- cast iron , shaft- stainless steel including,NRV of suitable size,cable complete all as specified. (01 set including 02 Nos of pumps one working & one standby) ; completeall as specified and directed by the Engineer in Charge. |
| 39 | Supply , fixing , Testing & Commissioning of straight through jointing kit, heat shrinkabletype suitable for XLPE/ PVC cables of size 10 to 70 Sqmm 3.5/4 core with working voltage 1100 volts ; complete all as specifiedand directed by the Engineer-in-Charge. |
| 40 | Supply , fixing , Testing & Commissioning of Indoor Endjointing kit, heat shrinkabletype suitable for XLPE/ PVC cables of size 10 to 70 Sqmm 3.5/4 core with working voltage 1100 volts ; completeall as specified and directed by the Engineer in Charge. |
| 41 | Supply and fixingstreet light bracket fabricated & made out of GI Tubing light grade 40mm bore Bend to the shape as directed and of length not less than1.5metres complete fixing on street light poles with & including mounting MS clamps of flat iron of suitable size 02 Nos with necessary nut bolts etc of suitable size; completeall as specified and directed by the Engineer in Charge. |
| 42 | Supply and fixing weather Proof PVC Junction Box made out of not less than 2 mm thick of size 250mm X 200mm X100mm (approx) complete with hinged door locking arrangement and consisting of 01 No panel mounted connector 4 pole 32 A - 01 NoMCB SP 06 Amps 10 KA - 01 No, confirming to IP 65 complete including fixing on street light pole with MS Clamps, bolts, nuts and washers; completeall as specified and directed by the Engineer in Charge. |
| 43 | Supply and fixing PVC insulated 3 core 2.5 Sqmm stranded Copper conductor cable for connecting junction box to street light fittingtesting and commissioning all as directed ; completeall as specified and directed by the Engineer in Charge. |
| 44 | Material & Labour for Constructing brick masonry circular manhole of size 0.91metre internal dia at bottom and 0.60 metre dia at top exceeding0.90 metredeep and not exceeding 2.00 metres deepwith 600mm internal diameter conforming to I.S. 12592 with FPS class designation 75 & brick masonry in cement mortar (1:4) (1 cement :4 coarse sand) using sub class \"B\" bricks , finished internal surfaces of manhole with cement plaster 12mm thick in cement mortar (1:3) (1 cement : 3 coarse sand) &finished with a floating coat of cement , cover will be fixed in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded crushed stone aggregate 20 mm nominal size) with & including necessary excavation earth work in type of soil , centering, shuttering, CI foot rest, Curved on plan exc 6m mean radius complete including, returning filling&removal of surplus spoil a to distance as directed .; complete all as specifiedand directed by the Engineer-in-Charge. |
| 45 | Material & Labour for Constructing brick masonry circular manhole of size 1.22metre internal dia at bottom and 0.60 metre dia at top exceeding1.50 metredeep and not exceeding 2.50 metres deepwith 600mm internal diameter conforming to I.S. 12592 with FPS class designation 75 & brick masonry in cement mortar (1:4) (1 cement :4 coarse sand) using sub class \"B\" bricks , finished internal surfaces of manhole with cement plaster 12mm thick in cement mortar (1:3) (1 cement : 3 coarse sand) &finished with a floating coat of cement , cover will be fixed in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded crushed stone aggregate 20 mm nominal size) with & including necessary excavation earth work in type of soil , centering, shuttering, CI foot rest, Curved on plan exc 6m mean radius complete including, returning filling&removal of surplus spoil a to distance as directed .; complete all as specifiedand directed by the Engineer-in-Charge. |
| 46 | Supply and laying Rodent Repelent SN-8 DWC ID (HDPE BLACK) Pipe of size 150mm dia with full coupler and rubber ring conforming to IS:16098-2 including testing of joints, comissioning etc ; completeall as specified and directed by the Engineer in Charg. Make: Tirupati/Bestech/ Astral/Ashirwad |
| 47 | Supply and laying Rodent Repelent SN-8 DWC ID (HDPE BLACK) Pipe of size 200mm dia with full coupler and rubber ring conforming to IS:16098-2 including testing of joints, comissioning etc ; completeall as specified and directed by the Engineer in Charg. Make: Tirupati/Bestech/ Astral/Ashirwad |
| 48 | Providing and laying Rodent Repelent SN-8 DWC ID (HDPE BLACK) Pipe with full coupler and rubber ring conforming to IS:16098-2 including testing of joints, comissioning etc. complete of size 300mm diameter : Make: Tirupati/Bestech/ Astral/Ashirwad; completeall as specified and directed by the Engineer in Charge. |
| 49 | Material & Labour for providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS : 10910 on 12mm dia steel bar conforming to IS : 1786 having minimum cross section as 23 mmx25mm and over all minimum length 263 mm and width as 165mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufacture\"s permanent identification mark to be visible even after fixing, including fixing in manholes with 300mm x 200mm x 150mm cement concrete block 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) complete as per design ; completeall as specified and directed by the Engineer in Charge. |
| 50 | Supply & Fixing for FRP/GRP Manhole cover of size 600mm dia light duty of 2.5 Ton load with Frame of specified sizes & colour , manhole cover with frame load test shall be confirming toIS-1726 & BS EN 124 standards, Colour shall be as approved byEngineer in charge , & including manhole cover shall be engraved with Clients name as confirmed by theEngineer in charge complete with accessories in all respects andnothing shallbe paid separately ; complete all as specifiedand directed by the Engineer-in-Charge. Make: JSN / Dudhi / HP/ Pillon |
| 51 | Supply & Fixing for FRP/GRP Manhole cover of size 900mm dia medium duty of 10Ton load with Frame of specified sizes & colour , manhole cover with frame load test shall be confirming toIS-1726 & BS EN 124 standards, Colour shall be as approved byEngineer in charge , & including manhole cover shall be engraved with Clients name as confirmed by theEngineer in charge complete with accessories in all respects andnothing shallbe paid separately ; complete all as specifiedand directed by the Engineer-in-Charge. Make: JSN / Dudhi / HP/ Pillon |
| 52 | Material & Labour for 50 mm magnetic catches with brass body and striking plate including letting in as fixed ; complete all as specifiedand directed by the Engineer-in-Charge. |
| 53 | Supply, Install, testing and commissioning of Diesel Engine Driven Generating Setof 30KVA/24KW capacitywith alternator out put Voltage 415 Volts +/- 1% at set value of 415Volts at a frequency 50HZ +/- 0.5% with suitable standard control panel, allmounted in acoustic enclosure andControl panel including AMF Panel as per manufacturers design and specification as per approved CPCB-IV Plus norms confirming to thedetailed specifications appended below :- (i)ENGINE(a) General: Suitable four stroke compressed ignition, radiator water cooled,Turbocharged aspiration, continuous duty with 10% overload capacity for any one hour in 12 hours running, 50°C intake air temperature, CPCB-IV Plus Euro emission engine developing 268 BHP at 1500 RPM coupled to alternator mounted on Channel Iron base frame with in built fuel tank of minimum capacitysuitable for 12 Hrs continous running. The prime mover provided should be as per IS specifications.(b) Air intake system :Should comprise of dry type intake air filter mounted on engine, one in number vacuum indicator mounted on intake piping. (c) Exhaust System: Should comprise of one exhaust manifold, dry type, mounted on engine, one exhaust residential type silencer which should be positioned in such a way that the exhaust gas is not sucked by the fan on the radiator, thereby affecting the cooling system. The silencer should cater to the noise level tolerance prescribed in the relevant IS/BS. The silencer should be provided with flaps with a provision so that it will open only when the generator is running. The complete exhaust system shall be properly supported so that entire lot of the exhaust system shall not fall on the DG Set.(d) Fuel System: Should comprise of disposal type element fuel filter, pressure type fuel pump mounted on engine, non return check valve in fuel supply and drain lines, wire braided hose between filter and pump, fuel system with suitable capacity electronic governor and engine mounted actuator. The fuel tank must have proper locking arrangement with level indicator and to be integrated with base frame. |
| 54 | Item no. 47(contd...)(e) Cooling System: Should comprise of radiator designed and tested for 50oC ambient temperature with 7 PSI pressure cap mounted on base rail. The thermostat installed in the engine coolant outlet, fresh water pump mounted on engine, fan and fan hub mounted on engine. A reservoir of 50% of radiator capacity to replenish coolant by gravity (as and when required) is also to be provided.(f) Lubricating System: Should comprise of lubricating oil sump mounted on engine, gear driven lub oil pump mounted on engine, lubricating oil cooler-fresh water cooled integral with engine cool out circuit mounted on engine, oil filter lubricating with cap and lubricating oil dip stick for oil level check mounted on engine. The system should be capable of feeding lube oil to the main end& large end bearings, cam shaft, valve rocker gear and all moving parts.(g) Starting System: Should comprise of suitable voltage DC electrical starter mounted on engine, with suitablemaintenance free batteries of capacity 12/24 V DC with suitable AH to be mounted in trays (having rubber insulation) on the main frame. It should have the provision to charge the battery from external sources during static condition and while running of the generator.(h)AC Generator :The generator shall be horizontal and foot mounted, 30 KVA, 415 Volts, 3 phase, 4 wire, 0.8 PF, 50 HZ, self excited, self regulated, brushless AC generator, suitable for an ambient temperature of 50° C with IP-23 enclosure class H insulation and temperature rise limited to class H as per following technical details(i) Type, Brush less AC Generators(ii) Output rating 30 KVA(iii) Output Voltage: 415 ± 1% under all loading conditions.(iv) Output frequency 50Hz ±0.5% up to 0.8 lagging.(v) No of Phases: 3 phase with 01 Neutral (4 wire)(vi) Mounting : Horizontal foot mounted.(vii) Enclosure :Minimum IP-23 / Drip proof and screen protected.(viii) Automatic voltage regulator.(ix) Class of insulation-\"H\" |
| 55 | Item no. 47(contd...)NOTE : Following shall be deemed to be included in cost quoted :-(i) Suitable size RCC cement concrete foundation platform of canopy base with height as required at site to mount the generator as per manufacturer\"s instructions/ recommendations. The cost of foundation bed incl earth work etc is deemed to be included in the quoted rate.(ii) Connecting existing cables, from existing panels and connecting cables , cables glands, cable lugs to new panel complete with all necessary accessories.(iii) Install on the foundation, connecting fuel lines, cable etc.(iv) Test and commissioning complete(v) The cost of control cables from engine Control panel to AMF panel shall be deemed to be included in the cost quoted.(j) BASE FRAME: Shall be stand by and fabricated with CRCA sheet metal which shall be suitable to mount the engine, alternator and radiator, channel width of base frame shall be adequate to accommodate anti-vibration pads. (k) CONTROL PANEL: Shall be indoor type manufactured with 14/16 guage CRCA sheet and is powder coated for weather-proff and long lasting finish consisting of microprocessor power command controller, Aluminium busbars with suitable capacity with incoming/outgoing terminals, indicating lamps for \"Load ON\" and \"Set Running\", instrument fuses duly wired and ferruled, MCCB of suitable rating with overload and short circuit protections , Volt meter, ammeter with selector switches, Frequency meter, energy meter,CTs and 3 Phase indicating lamps, timers etc all as per latest engineering practices.etc. complete all as specified and directed.(m) Accessories :-(i)01 No standard mechanical and electrical tool box.(ii) Internal covered tube lights. |
| 56 | Item no. 47(contd...)(n) Acoustic enclosure: Specially designed to meet CPCB norms 75dBA @ 1 mtr at 75% load under free field conditions. The Acoustic enclosure is made of CRCA sheets and a structural/sheet metal base with high quality noise absorbent and fire-retardant grade acoustic insulation material (P.U.Foam) complying to IS 8183 with two point lifting handles(o)Internal Lighting: Tube lights with protective mesh around it to be fitted inside the container for proper illumination(p) Doors :The enclosure will be provided with suitable doors on the side and rear to enter the enclosure during operation and maintenance.All doors will be provided with lock and handles for opening/ closing the doors, retainers for holding the panel door(q) Painting SchemeISS shade 220 olive green 1994 or all as per manufacturers specifications(r) Lifting/ Transportation arrangements :-Container with suitable corners will be provided to lift the DG set along with container.This is suitable for road/ rail/ sea transportation.(s) Trials:-Trials on site should be given as per load tests prescribed and all functional trials should be shown.Note : (i) The Engine, alternator, Control Panel, Acoustic enclosure shall be integrated unitsourced fromOEM only as per Make.(i) Necessary foundation for installing the DG Set shall be as per manufacturers\" recommendation and cost of the same deemed to be included in the quoted rate(ii) Accessories included in manufacturers standard modules are deemed to be included in the quoted rate. Note : This DG Set taken for STP-2 (for Md Accn) and nearest DG Set supply for STP-1 (for single living accn) taken from PH No 11 where the supply of 75 KVA DG from PH No 8 is available. |
| 57 | Supply & fixing of GI strip 32 mm x 6 mm burried in ground; complete all as specifiedand directed by the Engineer-in-Charge. |
| 58 | Supply, Install, testing and commissioning of Diesel Engine Driven Generating Setof 20KVA/16KW capacity with alternator out put Voltage 415 Volts +/- 1% at set value of 415 V at a frequency 50HZ +/- 0.5% with suitable standard control panel, allmounted in acoustic enclosure andControl panel including AMF Panel as per manufacturers design and specification as per approved CPCB-IV Plus norms confirming to thedetailed specifications appended below :-(I)ENGINE(a) General: Suitable four stroke compressed ignition, radiator water cooled,Turbocharged aspiration, continuous duty with 10% overload capacity for any one hour in 12 hours running, 50°C intake air temperature, CPCB-IV Plus Euro emission engine developing 268 BHP at 1500 RPM coupled to alternator mounted on Channel Iron base frame with in built fuel tank of minimum capacitysuitable for 12 Hrs continous running. The prime mover provided should be as per IS specifications.(b) Air intake system :Should comprise of dry type intake air filter mounted on engine, one in number vacuum indicator mounted on intake piping. (c ) Exhaust System: Should comprise of one exhaust manifold, dry type, mounted on engine, one exhaust residential type silencer which should be positioned in such a way that the exhaust gas is not sucked by the fan on the radiator, thereby affecting the cooling system. The silencer should cater to the noise level tolerance prescribed in the relevant IS/BS. The silencer should be provided with flaps with a provision so that it will open only when the generator is running. The complete exhaust system shall be properly supported so that entire lot of the exhaust system shall not fall on the DG Set.(d) Fuel System: Should comprise of disposal type element fuel filter, pressure type fuel pump mounted on engine, non return check valve in fuel supply and drain lines, wire braided hose between filter and pump, fuel system with suitable capacity electronic governor and engine mounted actuator. The fuel tank must have proper locking arrangement with level indicator and to be integrated with base frame. |
| 59 | Item no. 49(contd...)(c ) Exhaust System: Should comprise of one exhaust manifold, dry type, mounted on engine, one exhaust residential type silencer which should be positioned in such a way that the exhaust gas is not sucked by the fan on the radiator, thereby affecting the cooling system. The silencer should cater to the noise level tolerance prescribed in the relevant IS/BS. The silencer should be provided with flaps with a provision so that it will open only when the generator is running. The complete exhaust system shall be properly supported so that entire lot of the exhaust system shall not fall on the DG Set.(d) Fuel System: Should comprise of disposal type element fuel filter, pressure type fuel pump mounted on engine, non return check valve in fuel supply and drain lines, wire braided hose between filter and pump, fuel system with suitable capacity electronic governor and engine mounted actuator. The fuel tank must have proper locking arrangement with level indicator and to be integrated with base frame.(e) Cooling System: Should comprise of radiator designed and tested for 50oC ambient temperature with 7 PSI pressure cap mounted on base rail. The thermostat installed in the engine coolant outlet, fresh water pump mounted on engine, fan and fan hub mounted on engine. A reservoir of 50% of radiator capacity to replenish coolant by gravity (as and when required) is also to be provided.(f) Lubricating System: Should comprise of lubricating oil sump mounted on engine, gear driven lub oil pump mounted on engine, lubricating oil cooler-fresh water cooled integral with engine cool out circuit mounted on engine, oil filter lubricating with cap and lubricating oil dip stick for oil level check mounted on engine. The system should be capable of feeding lube oil to the main end& large end bearings, cam shaft, valve rocker gear and all moving parts.(g) Starting System: Should comprise of suitable voltage DC electrical starter mounted on engine, with suitablemaintenance free batteries of capacity 12/24 V DC with suitable AH to be mounted in trays (having rubber insulation) on the main frame. It should have the provision to charge the battery from external sources during static condition and while running of the generator. |
| 60 | Item no. 48(contd...)(h)AC Generator :The generator shall be horizontal and foot mounted, 20 KVA, 415 Volts, 3 phase, 4 wire, 0.8 PF, 50 HZ, self excited, self regulated, brushless AC generator, suitable for an ambient temperature of 50° C with IP-23 enclosure class H insulation and temperature rise limited to class H as per following technical details(i) Type, Brush less AC Generators(ii) Output rating 20 KVA(iii) Output Voltage: 415 ± 1% under all loading conditions.(iv) Output frequency 50Hz ±0.5% up to 0.8 lagging.(v) No of Phases: 3 phase with 01 Neutral (4 wire)(vi) Mounting : Horizontal foot mounted.(vii) Enclosure :Minimum IP-23 / Drip proof and screen protected.(viii) Automatic voltage regulator.(ix) Class of insulation-\"H\"NOTE : Following shall be deemed to be included in cost quoted :-(i) Suitable size RCC cement concrete foundation platform of canopy base with height as required at site to mount the generator as per manufacturer\"s instructions/ recommendations. The cost of foundation bed incl earth work etc is deemed to be included in the quoted rate.(ii) Connecting existing cables, from existing panels and connecting cables , cables glands, cable lugs to new panel complete with all necessary accessories.(iii) Install on the foundation, connecting fuel lines, cable etc.(iv) Test and commissioning complete(v) The cost of control cables from engine Control panel to AMF panel shall be deemed to be included in the cost quoted.(j) BASE FRAME: Shall be stand by and fabricated with CRCA sheet metal which shall be suitable to mount the engine, alternator and radiator, channel width of base frame shall be adequate to accommodate anti-vibration pads. |
| 61 | Item no. 49(contd...)(k) CONTROL PANEL: Shall be indoor type manufactured with 14/16 guage CRCA sheet and is powder coated for weather-proff and long lasting finish consisting of microprocessor power command controller, Aluminium busbars with suitable capacity with incoming/outgoing terminals, indicating lamps for \"Load ON\" and \"Set Running\", instrument fuses duly wired and ferruled, MCCB of suitable rating with overload and short circuit protections , Volt meter, ammeter with selector switches, Frequency meter, energy meter,CTs and 3 Phase indicating lamps, timers etc all as per latest engineering practices.etc. complete all as specified and directed.(m) Accessories :-(i)01 No standard mechanical and electrical tool box.(ii) Internal covered tube lights.(n) Acoustic enclosure: Specially designed to meet CPCB norms 75dBA @ 1 mtr at 75% load under free field conditions. The Acoustic enclosure is made of CRCA sheets and a structural/sheet metal base with high quality noise absorbent and fire-retardant grade acoustic insulation material (P.U.Foam) complying to IS 8183 with two point lifting handles(o)Internal Lighting: Tube lights with protective mesh around it to be fitted inside the container for proper illumination(p) Doors :The enclosure will be provided with suitable doors on the side and rear to enter the enclosure during operation and maintenance.All doors will be provided with lock and handles for opening/ closing the doors, retainers for holding the panel door(q) Painting SchemeISS shade 220 olive green 1994 or all as per manufacturers specifications(r) Lifting/ Transportation arrangements :-Container with suitable corners will be provided to lift the DG set along with container.This is suitable for road/ rail/ sea transportation. (s) Trials:-Trials on site should be given as per load tests prescribed and all functional trials should be shown.Note : (i) The Engine, alternator, Control Panel, Acoustic enclosure shall be integrated unitsourced fromOEM only as per Make.(i) Necessary foundation for installing the DG Set shall be as per manufacturers\" recommendation and cost of the same deemed to be included in the quoted rate . (ii) Accessories included in manufacturers standard modules are deemed to be included in the quoted rate. |
| 62 | Manning & Operation of theSTP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ)for 11 months { PHASE - IIrefer Sch \"A\" note no.2.1(b) } ,after completion of STP & SCADA :- Operating and keeping thecapacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays aand holidays including all connected electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 10 years on yearwise basis including all holidays all as specified and directed by Engr-in-Charge. Note:- (i) Contractor shall deploy are skilled operatoe (FGM) one helper per shift in three shift/ day for operation of each STP for period of 10 (Ten) years after completion of Phase-I.(ii) The comtractor shall employ FGMs having minimumqualification of ITI from recognised institute having sufficient knowledge and experience of minimum 02 years in maintenance / operation of similar work. The operators must be competent to carry out the repairs / maintenance of plant as required and warmed by OEM. (iii) The operators shall maintain the desired quality treated water including tracing out and rectification of minor leakages in pipe line / valves during the period. (iv)The operators shall operate elctrical equipement , pumps and maintain the STP in workable condition by checking daily leakages noise, cleaning the plant and its surrounding areas of plant as directed.(v) The contractor shall maintain all registers under various rules, and shall be produced to the Engineer-in-Charge as well as officers detailed by central labour department.(vi) The unit rate quoted shall be deemed to be included for cost of labour for daily for daily routine maintenance for trouble free functioning of installation. (vii) The quoted rate shall be deemed to be inclusive all consumables required for operation of STP.(viii) The payment to the staff employed shall be made within first week of every month through online mode in employees respective Bank Account. No payment to contractors / firms will be made unless proof of payment of wages / EPF / ESI etc through bank account is submitted by the contractor to all employees. Contractor shall produce details of payment made to the employees along with supporting documents for the verification of Engineer-in-Charge for processing the monthly / finall bills. In case of revision in pay slab by Government during the currency of contract, same shall be paid to the employee by the contractor and accordingly rates shall be quoted. ix) (Item no 1.00 to 30.00 & 31.00 of BOQ of the work) for amount of STP (04 Nos - 02 Nos at Kandrori & 02 Nos at Mirthal) and SCADA system (04 Nos - 02 Nos at Kandrori & 02 Nos at Mirthal) not exceed the 9% of item No 1.00 & 31.00). Note:- (i) The contracor should follow the terms & conditions of E-in-C\"s br policy no 10/2023 issued vide letter No A/95533/SCADA Sewage/Pol/E2W (PPC) dt 21 Jul 2023 . (ii) At Kandrori distance between STP-1 & STP-2 approx 2 KM & Mirthal distance between STP-1 & STP-2 approx 0.7 KM.(iii) Approx distance between Mithal and Kandrori Army station is 13 KM.(iv) Necessary spare & manpower will be provides by Contractor.(v) Desired water quality as per standard norms comply with E-in-C\"s branch direction to be achieved. |
| 63 | All as per srl item No 50 above but Manning & Operation of theSTP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ)for 11 months after completion of Phase-II { Phase-III refer Sch \"A\" note no.2.1(c) } complete. |
| 64 | All as per srl item No 50 above but Manning & Operation of theSTP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ)for 11 months after completion of Phase-III { Phase-V refer Sch \"A\" note no.2.1(e) } complete. |
| 65 | All as per srl item No 50 above but Manning & Operation of theSTP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ)for 11 months after completion of Phase-V { Phase-VII refer Sch \"A\" note no.2.1(g) } complete. |
| 66 | All as per srl item No 50 above but Manning & Operation of theSTP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ)for 11 months after completion of Phase-VII { Phase-IX refer Sch \"A\" note no.2.1(j) } complete. |
| 67 | All as per srl item No 50 above but Manning & Operation of theSTP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ)for 11 months after completion of Phase-IX { Phase-XI refer Sch \"A\" note no.2.1(l) } complete. |
| 68 | All as per srl item No 50 above but Manning & Operation of theSTP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ)for 11 months after completion of Phase-XI { Phase-XIII refer Sch \"A\" note no.2.1(n) } complete. |
| 69 | All as per srl item No 50 above but Manning & Operation of theSTP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ)for 11 months after completion of Phase-XIII { Phase-XV refer Sch \"A\" note no.2.1(p) } complete. |
| 70 | All as per srl item No 50 above but Manning & Operation of theSTP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ)for 11 months after completion of Phase-XV { Phase-XVII refer Sch \"A\" note no.2.1(r) } complete. |
| 71 | All as per srl item No 50 above but Manning & Operation of theSTP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ)for 11 months after completion of Phase-XVII { Phase-XIX refer Sch \"A\" note no.2.1(t) } complete. |
| 72 | All as per srl item No 50 above but Manning & Operation of theSTP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ)for 11 months after completion of Phase-XIX { Phase-XX refer Sch \"A\" note no.2.1(u) } complete. |
| 73 | Comprehensive maintenance of the above STP & SCADA (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ){ Phase - IV refer Sch \"A\" note no.2.1(d) } ,for the period of 1styears after expiry of Defect Liability Period. The scope of comprehensive maintenance includes maintenance of complete infrastructure under this work and replacing all defective components and restoring any defect / deformity / wear and tear and comprehensive maintenance of all STP components under this job, (Sl item No. 1.00 to 3.00) including all pumps and DG Sets in the scope of entire tender for further period of eight years after completion defect liability period. The scope shall also include comprehensive maintenance of all electrical & Sewage Pumps items such as main switch, starter, change over switch, MCCB, voltmeter, anmeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc, as per manufacturers instructions and as specified and directede by Engr-in-Charge.Note:- (a) Comprehensive maintenance includes replacement of all defective/ worn out / damaged parts including MBR membrane with new parts and nothing extra shall be paid on this account except the payment specified in this item. (b) The contractor shall be responsible for periodic maintenance as per maintenance schedule and specified including renewal/ replacement of parts, lubricants, fittings / fixtures filling of bacteria etc required for smooth functioning of the plant as per manufacturers instructions.(c) The rate quoted shall be deemed to be inclusive of safety gear & required tools for maintenance.(d) The quoted rate is deemedto be inclusive of tool & testing instruments required for operation & maintenance of STP plant. (e) The sludge cakes procured after treatment shall become contractors property and shall be removed from premises of STP as early as possible. The rate shall be quoted accordingly. |
| 74 | All as srl item no.61 above but Comprehensive Maintenance (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ) for 2ndyear after expiry of DLP { Phase - VIrefer Sch \"A\" note no.2.1(f) }complete. |
| 75 | All as srl item no.61 above but Comprehensive Maintenance (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ) for 3rd year after expiry of DLP { Phase - VIIIrefer Sch \"A\" note no.2.1(h) }complete. |
| 76 | All as srl item no.61 above but Comprehensive Maintenance (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ) for 4th year after expiry of DLP { Phase - Xrefer Sch \"A\" note no.2.1(k) }complete. |
| 77 | All as srl item no.61 above but Comprehensive Maintenance (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ) for 5th year after expiry of DLP { Phase - XIIrefer Sch \"A\" note no.2.1(m) }complete. |
| 78 | All as srl item no.61 above but Comprehensive Maintenance (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ) for 6th year after expiry of DLP { Phase - XIVrefer Sch \"A\" note no.2.1(o) }complete. |
| 79 | All as srl item no.61 above but Comprehensive Maintenance (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ) for 7th year after expiry of DLP { Phase - XVIrefer Sch \"A\" note no.2.1(p) }complete. |
| 80 | All as srl item no.61 above but Comprehensive Maintenance (of capacity 75 KLD, 50KLD & 25 KLD as per srl item No 1 to 6 of this BOQ) for 8th year after expiry of DLP { Phase - XVIIIrefer Sch \"A\" note no.2.1(s) }complete. |
| 81 | Note: The schedule of credit has been attached in tender in Pdf format and amount of credit schedule i.e. Rs 16,44,623.00 shall be deducted from the total amount of BOQ to arrive at the contract sum. |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail