Dd - Dg - Tarapur Industrial Area...Tarapur Industrial Area. Maintenance And Repair To Udds Hazardous Wastes... Secured Engineered Land Fill - Annual Post Closure Maintenance & Environmental Monitoring Services. -- 3Rd Call
Tender Overview
Project Description
DD - DG - TARAPUR INDUSTRIAL AREA...Tarapur Industrial Area. Maintenance and repair to UDDS Hazardous wastes... Secured Engineered land fill - Annual Post closure maintenance & Environmental monitoring services. -- 3rd Call
BOQ
| Sl. No. | Item Description |
| 1 | Post Closures Maintenance Contract (Waste Management) Maintenance of Secured Engineered Landfill (Quarterly) |
| 2 | Analysis of Ground Water Sample (Six Sample Per Quarter) Colour, Odour, PH Taste, Turbidity, Total Dissolved Solids, residual free chorine, chlorides, Nitrate Sulphate fluoride, total Alkalinity, total Hardness, calcium, Magnesium, cyaride, phenolic compounds, Dil and Grease lead, cadmium, zinc, chromium, mercury, aluminium, iron, arsenic manganese, selemium, polychlrinated biphenyts organ chirinated pesticides, polyaromatic Aromatic, hydro carbon, total plast count 370°C, coli forms Ecoli (Six Location) |
| 3 | Analysis of Soil Sample.The Parameters PH, colour, electrical Conductivity (EC) total dissolved solids (TDS), Total organic Carbon (TDC) polyaromatic Hydrocarbon (PAH), total suspended soilds (TSS), cyanide, fluoride, Arsenic, Manganese, heavy metal Pb, Cd, Zn, Cr, Hg, Mn, Ni. |
| 4 | Ambient Air Quality Monitoring.The parametrs: SPM, Sulpur Dioxide, Nitrogen dioxide, (Three Location Twice a week) |
| 5 | Vent Gas Monitoring.Vent Gas Monitoring by using Multi Gas Detector system H25, VOC\"s |
| 6 | Submission of Form V.Submission of Environment monitoring report preparation of Annual Environment Statement as per Form-V Under Environment Protection Act and Submission to stationery Authorities. |
| 7 | Development of harali including excavating the original ground, removing weeds and spreading of red earth 100 mm thick mixing with cowdung manure in 4:10 proportion, planting of harali, watering, rolling and removing weeds, dressing and maintaining such developed harali for a period of three months or upto the time of satisfactory growth of harali including cost of harali etc. complete. (Rates excluding GST) |
| 8 | Maintenance of harali and water supply arrangements including labour charges & tools for the post monsoon period of 9 months and maintaining the harali including pruning, trimming, watch & ward etc. complete. (Rates excluding GST) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender