| 1 | Cost ofPCCpole 8.5 mtr long |
| 2 | Cost ofST pole 9.0 mtr long |
| 3 | ST POL-11 mt long |
| 4 | STP POL 13 Mte Long (33 kv) |
| 5 | 33 KV Disc insulator with fitting |
| 6 | 33 KV Pininsulator with nut |
| 7 | 33 KV Cross Arm V-type |
| 8 | 33 KV Jointing Kit (OUT DOOR 33 KV) |
| 9 | 11 kv Jointimg kit (3x 185 sq mm)(streight through) |
| 10 | 11 KV X armV-type 100x50x6 mm |
| 11 | 11 KV Pin insulator with pin as per Annexure 16 (s.no.15+16)) |
| 12 | 11KV Dishinsulator with fitting |
| 13 | Cost of Earthing complete . |
| 14 | 11 kv Stay Set(16x 1800) complete |
| 15 | Concrete of pole. |
| 16 | Cross Arm Holding Clamp . |
| 17 | Holding Clamp double pole |
| 18 | XLPE CABLE 3.5 x400 Sq mmfor LT LINE |
| 19 | 11 KV XLPE CABLE 3x 185Sq mm |
| 20 | ABC cable(3x50+1x35+1x16)sq.mm. |
| 21 | Dead end Clamp |
| 22 | Eye Hook with Clamp |
| 23 | Concreting of Stay |
| 24 | Cost of M.ST-offChannel |
| 25 | Top Channel |
| 26 | Dropper Channel |
| 27 | M.S Angle 75x75x6x2028 mm |
| 28 | F-Clamp |
| 29 | Stone Pad 300x300x75 mm |
| 30 | Cost of 11 KV Disc insulator with fitting for carring (s.no.7+8) |
| 31 | ACSR Rabbit conductors |
| 32 | ACSR Dogconductors |
| 33 | MS Angle cross bracing |
| 34 | 11 KV E-Bracket |
| 35 | 11 KV F-Bracket |
| 36 | Suspenstin clamp |
| 37 | DB Box 3 phase |
| 38 | GI PIPE DIA 6 inchdia |
| 39 | GI Wire 10SWG |
| 40 | M.S Angle 65x65x6 mm for gaurding cross arm |
| 41 | Eye bolt |
| 42 | Nut & bolt all size |
| 43 | Danger Board with Clamp |
| 44 | L.T Insulator |
| 45 | l.T clamp |
| 46 | Aluminium Paint |
| 47 | Red Oxide Paint |
| 48 | Labour Charge & errection charges @ 20% |
| 49 | Dismentling labour cost ofper spen line ABC Cable |
| 50 | Dismentling labour cost ofper spen line ACSR & GI Wire |
| 51 | Dismentling labour cost ofPcc pole |
| 52 | Cartage of ACSR Conductor from site to stor |
| 53 | Cartage of meltable iron & GI wire scrap from site to stor |
| 54 | Open of winding of conductor from insulator and making bundle of conductor. |
| 55 | Opening of AB Cable from Pole and making bundle single phase and three phase |