| 1 | Supply and fixing of 24W LED 4000K 2 x 2 Square Type Recessed Fitting with LED SOR 2024-25, Unicode :M-1284,Page 168, |
| 2 | Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall with 150mm x 100mm x 113mm TW switch box with 3mm thick hylem sheet cover for 5A 3 pin non inter locking wall socket with 5A flush type switch with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point-SD 38 |
| 3 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 4 | CREMATION CHAMBER MODIFICATION Repair and maintenance of refractory bed brick construction, Clearing the slags and Fat blocks, Reconditioning the Inner surface with refractory Conctrete work and reconstruction of Inner Bed Chamber with high alumina Refractory bricks, IS8 Grade High Quality Heat Resistant refractory slaps and Accoset 50 Fire cement A Grade, Fire clay Powder and Fire Create super Clay Materials, Removing back side for ash removal cut out and make ceramic fiber insulated door with lock system. |
| 5 | WET SCRUBBER MULTI STAGESupply and fixingofPollution control System with Two stage Wet Scrubber system with SS filter mesh and SS Balls as Filter Media, Front opening removable doors with heavy duty type,removable cyclone separator, with water inlet pipelines, forced water jet nozzle setup for primary and secondary wet chambers. Heavy duty interconnecting pipelines with standard ERW garde bends, flanges, Mounting and reinforcement structures in MS Channels and fasteners etc., |
| 6 | FRONT DOOR SYSTEM Repair and maintenance of Door operating system & Door Chamber structure with Sheets etc., Design, Manufacturing, supply of Self Locking Type Up and down movement Door operation system with counter weight mechanism, Ceramic fiber blanket insulation 96Kg/m3 Density, with rollers and chain pulley etc., (Side Chamber doors will be provided for periodical Inspection and services) |
| 7 | EXHAUST DUCT (BYPASS) Supply and fixing ofCarbon deposits, damaged refractory parts, Clearing the Fumes Pathway & Reconstruction of Exhaust chamber with Refractory Brick insulation with High quality Ceramic Fiber blanket & Insulated Exhaust duct by MS Fabricated Structure, Refractory Brick lining by IS8 Slap, Cold face insulation bricks, fire clay and fire create super clay etc., Dismantling, Cleaning, Patchup work and Reconstruction of Secondary chamber with Refractory re insulation by fire bricks, Slaps & fire clay, fire create super etc., |
| 8 | INTERCONNECTING PIPELINESupply and fixing of Inter connecting pipeline from furnace\"s secondary chamber to wet scrubber inlet port with standard bends, ERW grade pipeline, flanges, fasteners and supporting structure etc., |
| 9 | LPG BURNER SYSTEMSupply and fixing of Fully Atomized LPGMono-Block Burner Specially Designed for Cremation Furnace with Long Length of Blast TubewithFractional HP Blower andAir Adjustment Damper Control the Capacity ofup to 40,000 Kcal/hr with Imported LPG Solenoid Valve & 2nd Stage Pressure Regulator with LPG Flow Control Valve with All General Safety System & LPG Burner Control Panel with Digital Temperature Controller & All Safety System as MCB and Automation for Each Burners, with Notification Lamps & High Voltage Stabilizer + Motor Control Unit wiring etc |
| 10 | LPG CYLINDER BANK Supply and fixing of Design, Supply and Installation of LPG cylinder Bank (VOT) 15 + 15 Cylinder Manifold with All Accessories like Manifold, clamping, Adopter, 1st stage Pressure Regulators, Primary and secondary Pressure reducing regulators with bypass arrangement, Control Valves, Flexible Hoses, TATA C Class Pipe line 3/4” Size by all heavy duty socket weld fittings from Cylinder bank up to Furnace & Burners. All Structural Works includes.Replacement of Second Stage Pressure Regulator for LPG Burners with 300mbar Pressure range with Low Pressure Gauges along with needle valve set up. Other Modification of Gas pipeline, Accessories, Supporting structures and Mounting Clamps |
| 11 | POLLUTION CONTROL SYSTEMRepair and maintenance of Venturi Scrubber in SS304 with intlet and outlet port coupled with Double Chambered Wet Scrubbing System with cyclone separator, SS Mesh filter, Filter media, Forced water jet nozzle solid cone with water Pump and pipe line from water tank to venturi Scrubber and wet scrubber primary and secondary wet chamber, heavy duty type Inspection doors for both chambers. |
| 12 | FRONT ID SMOKE SUCTION SYSTEMRepair and maintenance of Design, Manufacturing and supply of Excess Smoke suction system from the furnace room by 3hp Capcity exhaust ID fan with hopper for front and back door, smoke travellingducts, flanges, supporting reinforced structures, Control Switches, wiring with materialsetc., |
| 13 | TRANSPORT & ERECTIONOver all Transportaion and erection, commissioinig charges for above mentioned item. |