| 2 | Scope of workThis specification covers:• Supply, installation, testing, and commissioning of 16 Nos. of 1.5 Ton, 5-Star Rated Split Air Conditioners (preferably inverter type) with individual voltage stabilizers.• Installation includes interconnecting piping, wiring, supports, and necessary civil work (minor ducting, hole sealing, brackets).• Proper drainage and cabling routing.• Complete end-to-end commissioning and demonstration.AC Unit Specifications:Parameter SpecificationType Split AC (Inverter type preferred for energy efficiency)Cooling Capacity 1.5 Ton (approx. 5.2 kW)Energy Rating Minimum 5-Star (BEE 2024 rating)Compressor Type Rotary / Inverter compressorPower Supply 230 V ±10%, 50 Hz, Single PhaseCooling Coverage Area Approx. 150-180 sq. ft. per unitRefrigerant Type R32 (Eco-friendly and efficient)Noise Level (Indoor) ≤ 40 dBDehumidifier Function YesAir Filters HD Filter/PM2.5 (preferable)Condenser Type 100% Copper with anti-corrosive coatingWarranty Minimum 1 year on product, 5 years on compressor (preferably 10 years)Stabilizer Specifications (One for Each AC)Parameter SpecificationType Digital Voltage Stabilizer (Wall-mounted)Capacity Suitable for 1.5 Ton AC (Minimum 4 kVA)Input Voltage Range 130V – 290VOutput Voltage 200V – 240V ± 5%Technology Microcontroller-basedProtection High/Low voltage cut-off, Overload, Spike protectionWarranty Minimum 2 YearsEligible Makes / Brands• Air Conditioner Brands: Voltas, Bluestar, Carrier, LG.• Stabilizer Brands: V-Guard, Everest.Installation Requirements• Mounting: Wall-mounted indoor unit with appropriate angle supports.• Outdoor Unit: Firm installation on wall brackets or ground-mounted stand as applicable.• Copper Piping: Minimum 3-meter length included; extra piping on actual measurement basis.• Drainage: Proper water outlet with leak-proof drainage line.• Electrical Work: Power cable (min. 3-core 2.5 sq.mm copper cable), plug top, MCB fitting if required.• Stabilizer Mounting: Proper installation on wall with all connections secured.• Consumables: Clamps, fasteners, sleeves, insulation, conduit, etc., included.• Commissioning: End-to-end testing and handover with user manual and remote.Additional Requirements• Vendor must visit site before installation to assess layout and wiring feasibility.• All installation should be completed within 10 days of delivery. • All civil work for hole cutting, wall sealing, and scaffolding (if needed) should be included.• The supplier must have an authorized service branch or service support centre located in Tamil Nadu to ensure timely after-sales support and maintenance. |