| 1 | Earth work excavation in hard gravelly soil,stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification. |
| 2 | Filling with m.sand for foundation including cost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete. |
| 3 | Supplying and erection of 11 nos. precast RCC rings (5\" dia, 1\" height) with cover for septic tank ring system inlcuding cost of all materials, labour, lead, lift, etc., complete. |
| 4 | Filling with gravel for the sides including cost of all materials, labour, all leads and lifts , watering, consolidation etc., complete as per standard specification and as per direction of the Engineer incharge. |
| 5 | Providing and fixing ventilating shaft of PVC pipe 100 mm dia of 6 kg /cm2 ISI make including cost of bend,Elbow and shoe,including cost of all materials, labour, lead, lift, as per standard specification etc., complete |
| 6 | Providing sewage line with 100mm dia PVC pipe 6kg/cm2of ISI certified including all specials and cost of all material, lead, lift, etc., complete as per standard specification. |
| 7 | Refillingwith excavated earth including cost oflabour, all leads and liftsetc., complete as per standard specification and as per direction of the Engineer incharge. |
| 8 | Disposal of excess of surplus earth away in low lying area with a head load lead 100m including spreading, levelling, labour, leads, lifts etc., complete. |
| 9 | SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only |
| 10 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only |
| 11 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as \"0\" only |