|
| 1 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete work. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-2 as per Technical Specification Clause 405. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading- 3 as per Technical Specification Clause 405. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 4 | Brick edging on both sides of the road of first class bricks 8 cm (3\") wide and 12 cm. 4½\"deep laid with mud mortar including labour and supply of. bricks finished to required template and proper alignment and also including dressing and ramming the excavated earth as directed by Engineer-in-Charge. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 5 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70 Kg/Sqm using mechanical means as per Technical Specification Clause 5.1-502. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 6 | Providing and applying tack coat with Bitumen (VG-10) using emulsion distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 5.2-503(iii) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 7 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type as per Technical Specification Clause 5.9-508. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 8 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 5.12-510. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 9 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 10 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.as per Tech Specification. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 11 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause .PCCGradeM10 (1:3:6) Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 12 | Brick Masonry Work in Cement Mortar 1:3 in Foundation,substructure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 13 | Providing and Laying Reinforced Cement Concrete Pipe NP3 of 600 mm dia as per design in Single Row; Laying Reinforced cement concrete pipe NP3 pipe for culverts on first class bedding of granular material in single row masonry works in head walls and parapets...asTechnical Specifications . complete in all respects. Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 14 | Pointing with cement mortar (1:3)on brickworkas per drawing and technical specification Clauses 613.3 and 1204 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 15 | Plastering with cement mortar (1:4) 15mm thickin Sub structure as per drawing and technical specification Clauses 613.4 and 1204 Including all T&P, Labour, Material, Royalty Tax but excluding GST |
| 16 | First Year Maintainance (@0% of Total Work Amount of S.No. 1 to S.No.15) |
| 17 | Second Year Maintainance (@0.75% of Total Work Amount of S.No. 1 to S.No.15) |
| 18 | Third Year Maintainance (@1.5% of Total Work Amount of S.No. 1 to S.No.15) |
| 19 | Fourth Year Maintainance (@2.25% of Total Work Amount of S.No. 1 to S.No.15) |
| 20 | Fifth Year Maintainance(@3.0% of Total Work Amount of S.No. 1 to S.No.15) |