| 1 | fo|qr Hk.Mkj dsUnz egksck ls lkbV rd fo|qr lkexzh igqpkus dk dk;ZA |
| 2 | PCC Pole / STP Pole (8.5mtr/9mtr/11mtr/13mtr) |
| 3 | Cartage of line Material Viz. Weasl conductor, GI Wire Cross Arm, Earthing, ABC Cable, 11 KV XLPE Cable, Stay etc. |
| 4 | Erection of PCC Pole/ STP Pole |
| 5 | Erection of Double/Section Double on PCC Pole/STP Pole. |
| 6 | fitting & fixing ofPCC/STP Pole with line material. |
| 7 | Laying and sagging of ACSR of Weasl conductor as per site requirement. |
| 8 | Laying and sagging of ABC Cable. |
| 9 | Laying and sagging of XLPE Cable Size 70/120/185 including with all material. |
| 10 | Filling of jointing kit Indoor/Outdoor Type. |
| 11 | Cartage & Erection of 10/16 KVA single phase transformer in double pole with loading and unloading |
| 12 | Cartage & Erection of 25 KVA transformer in double pole with loading and unloading. |
| 13 | Cartage & Erection of 63 KVA transformer in double pole with loading and unloading. |
| 14 | Cartage & Erection of 100 KVA transformer in double pole with loading and unloading. |
| 15 | Cartage & Erection of 250 KVA transformer in double pole with loading and unloading. |
| 16 | Cartage & Erection of 400 KVA transformer in double pole with loading and unloading. |
| 17 | Contruction of Plinth Making as per respo nones 250/400 kva T/F |
| 18 | Installation of Fencing 250/400 kva T/F as per instruction site incharge |
| 19 | Loading and unloading with erection of CT/PT unit as per required. |
| 20 | Loading and unloading with erection of pillfer unit as per required. |
| 21 | Guarding of 11 KV line works as per respo norms. |
| 22 | Erection of stay at digging fo pit including the cost of grouting with cement, sand and brick ballast/stone in ratio 1:4:8 including the cost as per respo norms. Nozeling & bindeing stay set, stay |
| 23 | Earthig Complete |
| 24 | Fabrication of Hole Channel/Angle/Cross arm. |
| 25 | Supply and Erection Nut & Bolt. |
| 26 | Cutting of Tree Branching |
| 27 | Concreting of Pole |
| 28 | Used and Scrap Maiterial with Cartage with Loading and unloading site to JE Store/ESC Mahoba |
| 29 | Erection of distribution box on single pole including with ABC Cable. |