|
| 1 | Labour only for removing of old unserviceable sand: Labour only for removing of old unserviceable sand mixed with lead shots foreign materials etc. from (a) 03 nos butts of 35 yards new range in three turns, (b) 04 nos butts of pistol section in four turns,(c) 02 nos. butts of0.315 range in three turns, (d) 01 no. butt of550m Sniper Tunnel in three turns and segregating lead shots or similar by seiving etc. and collecting sieved lead shots in empty gunny bags to be handed over to the factory authority and to be kept in position as ordered by EIC/SIC. 1A) Labour only for depositing/topping-up and spreading existing sand with fresh sand: Labour only for depositing / topping-up spreading and levelling fresh sand with existing sand (existingsand to be collected from the side)in above stated buttsand respective turns as ordered by EIC/SIC. 1B) Labour only for removal of spoils: Labour only for removal of spoils such as sieved unserviceable sand, rubbishes mixed with dressed earth, debris etc. after segregating of steel foreign materialsfrom the above stated butts and in there respective turns within the inside factory premises and spreading and levelling the same as ordered by EIC/SIC. 1C) Supplying and depositing medium coarse sand: Supplying of medium coarse sandof total 109 cumfor respective turnsfor use in above stated butts and supplying 250 nos. of empty gunny bags and subsequent filling of sand and laying ofthese bags on butt walls as directed by EIC/SIC. |
| 2 | P.C.C. (1:2:4) : M & L for providing plain cement concrete type-B1, 1:2:4 mix ( using 12.5 mm graded stone aggregate ) as in sub-base, filling and mass concrete, topping of floor as ordered by EIC/SIC. |
| 3 | R.C.C. (1:2:4) : M & L for providing reinforced cement concrete type m-20, 1:2:4 mix (using 20 mm graded stone aggregate) as in slabs supported on walls,beams and columns in floors,roofs, landings, balconies,canopies, deck slabs and in shelves and the likeexcluding use and waste of necessary formworkas ordered by EIC/SIC. |
| 4 | Brick work(1:6): M & L for brick work with old size subclass\"b\" bricks, straight or curved on plan exc 6m mean radius with (1: 6) cement morter as ordered by EIC/SIC. |
| 5 | Form work :M & L for use of wooden form work to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; not exceeding 200mm thick (Horizontal or sloping)and similar work,as ordered by EIC/SIC. |
| 6 | Boarding : S & F25mm thick hardwood 2nd class boarding both side planed fixed with nails in any situation as ordered by EIC/SIC. |
| 7 | Wood work : M & L for providing wood work Plain, solid, straight , wrought, framed rebated on the solid, rounded or chamfered, put together with glue pinned at joints,of any size any description with 2nd class hardwood all as complete and all as ordered by EIC/SIC. |
| 8 | Reinforcement : M & L for providing reinforcementwork with TMTmild steel bars 08 mm and over, cut to length, bent to shape required, including cranking, bending, hooking ends & binding with mild steel wire (annealed) not less than 0.9 mm dia. etc.complete as ordered by EIC/SIC. |
| 9 | Neat cement finish : M & L for applying cement slurry on plastered or concrete surface to have the surfaces even & smooth as ordered by EIC/SIC. |
| 10 | Ceiling plastering (1:4) : M & L for rendering 15 mm thick cement plaster 1:4 mix in ceiling or concrete surfaces of any description as ordered by EIC/SIC |
| 11 | Plastering(1:6): M & L for providing 12 mm thick cement plater 1:6 mixon fair faces of brick work or concrete surfaces at any height as ordered by EIC/SIC. |
| 12 | Taking down plastering : Labour only for taking down cement or cement lime plaster of any description, flush pointing, any painting etc. from brick wall, Ceilling & chajjas etc. including raking out joints, hacking for key, scrubbing down with water etc. complete as ordered by EIC/SIC. |
| 13 | Washable distempering :M & L for applying two coats of washable distemper of 1st quality make- Asian / Berger / ICIor substantially equivalent make after necessary preparatory work withprimer to distempering on wall as ordered by EIC/SIC. |
| 14 | Demolition of PCC: Labour only for demolition of cement concrete of any description and in any position and removing the same out off the work site as orderd. |
| 15 | Demolition of RCC : Labour only for demolition of reinforcedcement concrete of any description and in any position and removing the same out off the work site as orderd. |