| 1 | Construction ofDrama stage at Vishwareddipalayam in Madhurapakkam Panchayat |
| 2 | Earth work excavation for foundation in all classes of soils and sub soil to full depthexcept in hard rock requiring blasting but inclusive of shoring struttingif required forthe sides of foundation. |
| 3 | 0-0.30m |
| 4 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. |
| 5 | Supplying and Filling inBasement with Gravel in layers not more than 15 cm thick , well ramed and consolidated complying with standard specification |
| 6 | Supplying and filling in foundation and basement with good sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification |
| 7 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, |
| 8 | below |
| 9 | Supplying and Fabricating and placing in position MS Steel or ribbed tor steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. |
| 10 | Reinforced Cement concrete 1: 1.5 : 3 mix using20 mm ISS Hbg metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. |
| 11 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. |
| 12 | Finishing the Top of Roof with one course of Pressed Tiles of size 23 cm x 23 cm x 2 cm laid incement mortor 1 : 3 mix and Pointingwith the same mortor mixed with water proof compoundincluding cost conveyance of all materials and labour charges etc complete |
| 13 | Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 14 | Ceiling Plastering with cement mortar 1:3 mixto 10 mm thick for R.C.C. Items including cost and conveyance of all materials to site and all labour charges etc complete |
| 15 | Granolithic flooring using 10 - 12mm chips including cost and conveyance of all materials to site and all labour charges etc complete |
| 16 | White washing |
| 17 | Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete |
| 18 | Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete |
| 19 | Electrification |
| 20 | Provision for Citizen InformationBoard |
| 21 | Provision for Photo |
| 22 | ProvidingBore well and Motor Accessories an Pumping Main Line atNear Sudukattu padhai in V.PagandaiPanchayat |
| 23 | Bore well |
| 24 | Charges for Conducting Geo Physical Survey |
| 25 | Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles boulders etc. By first taking a pilot bore of 140 mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drilling at site ( Site will be shown by the TWAD Board Officers) including construction of mud pit.0m to 60m depth |
| 26 | Reaming of 150mm Dia Borewell to 300mm Dia Borewell as directed at site |
| 27 | Labour charges for inserting casing pipe supply& packing of pebbles |
| 28 | Supply & delivery of 150mm Dia PVC Plain Casing pipe as per IS 12818 / 2010 |
| 29 | Supply & delivery of 150mm Dia PVC Slotted Casing pipe as per IS 12818 / 2010 |
| 30 | Charges for developing the borewell using air compressor in hours |
| 31 | Supply, delivery and erection of Submersible Pumpset of50 LPMX 175 Head as per SOR TWAD - Page 88 |
| 32 | Supply and delivery of MS Kisok |
| 33 | Supply and delivery of 3 phase Panel Board D.O.L with two level guard and auto start confirming to IS specification for 5 HP pumpset.TWAD SOR Page 101 |
| 34 | Supply, delivery of 1.1 KV Grade,PVC insulated and sheathed3 core flat copper submersible cable with ISI marking conforming of IS 694/1990 of reputed make for submersible motor erected in borewell. |
| 35 | 50MM UPVC column pipe |
| 36 | 50mm GI Flangeset Heavy page 29 |
| 37 | 40mm MS Clampset Heavy page 29 |
| 38 | 50mm GM Non Return Valve page 30 |
| 39 | 50 x 40mm GI reducer heavy page 26 |
| 40 | 63mX50mmPVC T.Coupler page 10 |
| 41 | 40mm Ball Valve/ GM Gate Valve page 30 |
| 42 | (i) Aerial fuse board of size 15 x 10 x 6cmwith 32 A aerial fuse carrier(3 Nos.) |
| 43 | (iii)Wall mounting type MS cubical EB meter box with fuse carrier (3 Nos) of 32 A capacity at EB supply point.This box is also to accommodate TNEB energy meter with proper ventilation as approved by TNEB. |
| 44 | (ii) Supply and laying of 7/20 size PVC insulator copper conductor cable from Aerial fuse to EB supply point etc., complete as per I.E Rules. |
| 45 | 25mm dia GI pipe for service point |
| 46 | 25mm dia GI Elbow |
| 47 | No.8 GI wire for earth(Twin earthing) |
| 48 | Stay wire 7/20 |
| 49 | 20mm GI pipe for twin earthing and cable encasing |
| 50 | 4way nutral link |
| 51 | TW banel board (41 x 31 x 6cm) |
| 52 | Labour charges for erection of submersible pump set including fixing and jointing the submersible cable with clamps to the required depth, valves and errection panel board control room twin earthing as per I.E Rules including cost of civil works |
| 53 | Supply,delivery, laying and jointing of 90mm OD PVC 6Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer. |
| 54 | a.90mm PVC Bend |
| 55 | b 90mm PVC Threaded coupler |
| 56 | Name Boardand Photo charge |
| 57 | Construction ofDrama stagein KuthampoondiPanchayat |
| 58 | Earth work excavation for foundation in all classes of soils and sub soil to full depthexcept in hard rock requiring blasting but inclusive of shoring struttingif required forthe sides of foundation. |
| 59 | 0-0.30m |
| 60 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. |
| 61 | Supplying and Filling inBasement with Gravel in layers not more than 15 cm thick , well ramed and consolidated complying with standard specification |
| 62 | Supplying and filling in foundation and basement with good sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification |
| 63 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, |
| 64 | below |
| 65 | Supplying and Fabricating and placing in position MS Steel or ribbed tor steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. |
| 66 | Reinforced Cement concrete 1: 1.5 : 3 mix using20 mm ISS Hbg metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. |
| 67 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. |
| 68 | Finishing the Top of Roof with one course of Pressed Tiles of size 23 cm x 23 cm x 2 cm laid incement mortor 1 : 3 mix and Pointingwith the same mortor mixed with water proof compoundincluding cost conveyance of all materials and labour charges etc complete |
| 69 | Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 70 | Ceiling Plastering with cement mortar 1:3 mixto 10 mm thick for R.C.C. Items including cost and conveyance of all materials to site and all labour charges etc complete |
| 71 | Granolithic flooring using 10 - 12mm chips including cost and conveyance of all materials to site and all labour charges etc complete |
| 72 | White washing |
| 73 | Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete |
| 74 | Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete |
| 75 | Electrification |
| 76 | New door |
| 77 | Provision for Citizen InformationBoard |
| 78 | Provision for Photo |
| 79 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |