| 1 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by thedepartmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. |
| 2 | Cement concrete of mix in 1:4:8 (one cement – four sand – eight broken stone) using ISS Hard broken granite stone jelly of 40 mm gauge from approved quarry to working site including cost of conveyance of all materials to working site and all labour charge for mixing, placing, compaction, finishing and curing by the direction of departmental engineers instruction etc, complete and as per standard specification |
| 3 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour chargesetc., complete as per standard specification |
| 4 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 3 |
| 5 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. |
| 6 | Roofing with Aluminium Zink Coated Pre Painted Galvum Sheetincluding 15cm lapping 0.80mm thick 80 Nos of 20mm x 6mm GI bolts and nuts and limpet washers 20 Nos. of hook bolts and nuts of size required and washers or screws if wooden baterns including cost of all mterials and labour charges etc., complete with standard specification. |
| 7 | Brick Partition Walls using II class ground moulded chamber bricks of size 9\"X43/8\"X 23/4\"in C.M 1:3 (One part of Cement and Three part of Crushed Stone Sand (M- Sand))using hoop iron reinforcement,if found necessary standard specification including finishing, curing,etc., complete complying with standard specification - 10 sqm- Ground Floor |
| 8 | Plastering with cement mortar 1:5 (One cement and five sand) 12mm thick in all floors including cost and conveyance of all materials to site etc,complete as per standard specifications. |
| 9 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panellingwherever necessary and as directed by the departmental officers) |
| 10 | White washing two coats with freshly burnt shell lime white in colour in all floors including cost of lime and other materials brushes scaffolding charges etc.complete complying with standard specification and as directed. -100sq.m S.I.333 |
| 11 | Supplying and fixing in position Indian water closet of size 580 X 440mm, white glazed earthen ware of approved quality with \"P\" trap or \"S\" trap confirming to IS:2556 -Part XII with sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete1:2:5 ( one part of lime, two parts of sand and five parts of brick jelly) 100mm thick and finishing the top to required slope and including giving necessary connection to cast iron soil pipes/ PVC pipes by dismandling brick masonry, reinforced cement concrete roof/floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specifications and as directed by the departmental officers. |