Tender For Construction Of V.R.B At Km 23.630 Of Kamalpur Dy - Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complet. 2 Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P,all lifts and leads etc. complete. 3 Providing and Laying C.C. M-15(1:2.4)cement concrete including cost of all materials, labour T & P,all lifts and leads etc. complete. 4 Providing and Laying first class M-150 brick work in (1:4 ) cement mortar including cost of all materials, labour T & P,all lifts and leads etc. complete. 5 Providing and Laying R.C.C. M-20(1:1.5:3)cement concrete including cost of all materials, labour T & P,all lifts and leads etc. complete. 6 Providing and Laying C.C. M-25(1:1:2)cement concrete including cost of all materials, labour T & P,all lifts and leads etc. complete. 7 Providing and fixing Cantering & shutteringincluding cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . FOR CC WORK 8 Providing and fixing Cantering & shutteringincluding cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . FOR RCC WORK 9 Supply and fixing of 20mmexpansion joint in slab between dirt wall and slab including cost all labour, T&P material etc complete as per direction of Engineer - in charge. 10 Providing and fixing steel reinforcement including cost of steel,binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads ,all labour and T&P etc 11 12 mm Thick Plaster in 1:4 Cement mortorincluding cost of all material, labour, T&P, Curing etc complete for proper completion of work 12 Providing and Laying local sand below floor including cost of all materials, labour T & P,all lifts and leads etc. complete. 13 Providing andpainting Bitumen (85/40 grade )in two coats including cost of all material, T&P, heating, labour all lifts and leads etc compete as per direction of Engineer-in-Charge 14 S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work 15 P/F 150mm Dia PVC Pipe in proper position for drainage spout i/c all material, labour and T&P etc required for proper completion of work. 16 Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also includingall lift and Lead upto 1 km distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge.