| 1 | Construction of C.Croad & drain |
| 2 | Dismantling of old and damage cement concrete/Interlocking Tiles including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-17/new-697) |
| 3 | Disposal of dismantling material up to 3km lead inc loading/unloading including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-3/231a) |
| 4 | Dismantling of old and damage drain brick work including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-17/692) |
| 5 | Deduction of old and workable brick 40% of above items including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-1/1a) |
| 6 | Deduction of brick bats in 5.00cm gauge 60% of item no-3 including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-1/2a) |
| 7 | Earth work in filling upto distance 5.00 km lead with cartage/royalty for levelling dressing including supply of all material,labour and T&P etc.required for proper completion of work, |
| 8 | Concrete in 1:6:12 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work(Chpt-5/273) |
| 9 | M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-6/307) |
| 10 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-13/582a) |
| 11 | Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labourand T&P etc required for proper completion of work (Chpt-5/279a) |
| 12 | Providing,laying,spreading 45.5-63mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work |
| 13 | Providing,laying,spreading 22.4-53mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work |
| 14 | Construction of un-reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement,thickness as per design over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 ( 1:1.5:3) M30 coarse and fine aggragate confirming to IS 383 maximun size of coarse aggragate not exceeding 25mm,mix in a concrete mixer not less then 0.2 cum capacity and appropriate weight batcher using approved m,ix design,laid in approved fixed side form work(steel channel laying an fixing of 125 micron thick polytheen film & dowel bars ,wedges ,steel plates including supply of all material,labourand T&P etc required for proper completion of work (Chpt-20,New9 |
| 15 | Supply and fixing of Iron work such as heavy size Iron for channel including supply of all material,labour and T&P etc.required for proper completion of work,(asper Analysis) |
| 16 | Add sign board of granite stone |
| 17 | Add CGST + SGST @ 18% |