| 1 | Shifting of H.T/ L.T. lines |
| 2 | Steel Tubular Poles (8 m, Working Load > 200 kgf/m²) (with Ruling Span 67 m) |
| 3 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (with Ruling Span 67 m) |
| 4 | Steel Tubular Poles (13 m, Working Load > 200 kgf/m²) (with Ruling Span 67 m) |
| 5 | Muffs with concerete fillingProvided by HPSEBL |
| 6 | Prov AAAC 7/3.15mm² Conductor (50mm²) {Includes Cutting and wastage} |
| 7 | LT AB cable (3x95+1x70sqmm) |
| 8 | LT AB cable (3x120+16+70sqmm) |
| 9 | LT PVC Cable 3.5C 35 sqmm |
| 10 | LT Distribution Boxes (3 Phase- 4 bays) with spring loaded connection with stainless steel strap roll 20mm X.7mmx5Mtr+ Stainless steel Buckles 1 nos for each box |
| 11 | Anchoring Assembly |
| 12 | Suspension Assembly |
| 13 | Facade Hooks |
| 14 | Shackle Insulator (16 kN) Provided by HPSEBL |
| 15 | D-Iron (U- Clamps) Provided by HPSEBL |
| 16 | Earth Knob |
| 17 | Prov HT Stay Set Provided by HPSEBL |
| 18 | Prov LT Stay Set Provided by HPSEBL |
| 19 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)Provided by HPSEBL |
| 20 | X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length [600 mm] |
| 21 | Knee Bracing Set Length 1100 mm (65X65x6) mm |
| 22 | Half Clamp for Cross Arm |
| 23 | LT Earthing Set complete Provided by HPSEBL |
| 24 | Lugs for the connection in the Distribution boxes |
| 25 | LT Distribution Boxes (3 Phase- 4 bays) with spring loaded connection with stainless steel strap roll 20mm X.7mmx5Mtr+ Stainless steel Buckles 1 nos for each box |
| 26 | LT Cable 3½ C 35 mm² for Connection to Dist Box(5 mtr L/S) |
| 27 | Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3%} for 3%Sag, Wastage & Cross Lacing @ 0.102 kg/m |
| 28 | Full ClampProvided by HPSEBL |
| 29 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 30 | Aluminium Paint |
| 31 | Erection charges of AAAC 7/3.15 mm sq cond. |
| 32 | Erection Charges of sagging L T lineAAAC 7/3.15mm2(50mm²) |
| 33 | Dismentalment ChargesofL.T lineAAAC 7/3.15mm2(50mm²) |
| 34 | Sagging charges of L.T AB Cable |
| 35 | Erection chargesof S.T Pole |
| 36 | Erection chargesof S.T Pole 13 Mtr Long (HT) |
| 37 | Erection chargesofLT Stay Set |
| 38 | Erection charges of HT Stay Set |
| 39 | Erection charges of Earthing Set |
| 40 | Erection Charges of LT AB Cable per Km |
| 41 | Transportation Charges of LT AB Cable per Km |
| 42 | Erection chargesof G.I wire |
| 43 | Transportation charges |
| 44 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |