| 1 | Madurai-thondi road to karuthupatti via Kandanipatty road |
| 2 | Clearing and grubbing Scrub jungleroad land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. |
| 3 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2min hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A |
| 4 | Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete. |
| 5 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. |
| 6 | Km 0/0-1/0 |
| 7 | Km 1/0-1/6 |
| 8 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 |
| 9 | Km 0/0-1/0 |
| 10 | Km 1/0-1/6 |
| 11 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it. |
| 12 | Km 0/0-1/0 |
| 13 | Km 1/0-1/6 |
| 14 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., |
| 15 | Km 0/0-1/0 |
| 16 | Km 1/0-1/6 |
| 17 | Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 |
| 18 | Km 0/0-1/0 |
| 19 | Km 1/0-1/6 |
| 20 | Kilo metre stone |
| 21 | Provision for Mandatory Sign Boards |
| 22 | Provision for Cautionary Sign Boards |
| 23 | Hecta metre stone |
| 24 | Provision For 3m Span Culvert at |
| 25 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
| 26 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 27 | Cement concrete 1 : 3 :6 mix using 40mm HBG metal or foundation including watering, centering and shutteringwherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works |
| 28 | Supplying and erectingshuttering for CC Works including cost and conveyance of all materials to site etc., complete. |
| 29 | Centering shuttering for CC Works including cost and conveyance of all materials to site etc., complete. |
| 30 | Supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works |
| 31 | Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3 |
| 32 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3 |
| 33 | Provision for fixing Tar paper including all labour cost |
| 34 | Collection and supply of gritty Gravelfrom approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer |
| 35 | Provision for Weep Holes |
| 36 | Provision Expansion joint |
| 37 | Provision fo pipe Culvert |
| 38 | Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation. |
| 39 | Collection and filling ofsand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation. |
| 40 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation |
| 41 | Supplying and erecting centeringshuttering includingnecessary supportsforplane |
| 42 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost of conveyance all materials of all labour charges etc., complete. |
| 43 | Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete. |
| 44 | Collection and supply of gritty Gravelfrom approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer |
| 45 | Supplying and erecting centeringshuttering includingnecessary supportsforplane |
| 46 | Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3 |
| 47 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |