Public Administrative Department Local Bodies Closing in 0 days TDR #48994885

Triennial Maintenance Contract For Regular Maintenance Of Various Monuments And Statues In The Fort Heritage Precinct Mumbai

Issued by Local Bodies · Mumbai, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
08 May 2025
0 days left
EMD
2.08 Lakhs
Bank guarantee accepted
Document Fee
16500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Triennial Maintenance Contract For Regular Maintenance Of Various Monuments And Statues In The Fort Heritage Precinct Mumbai- 1 Premises – Sweeping by manual or mechanical means : Kothari Pyaav 2 Premises - scrubbing, washing with disinfectant including flooring, Kerbs, bund wall, gratings, chambers covers etc 3 The complete structure including drinking water trough and animal troughs to be cleaned with mist cleaning and Ph balanced surfactant as directed by Engineer-in-charge (Specification No. A-2) 4 Overhead Water tank and underground water tank including water faucet to be cleaned with disinfecting material as per the cleaning norms for water tanks (Appendix : I -A-1) 5 Cleaning of Cast Iron railing, Lamp Posts with light fittings,stone pedestal, Art Installation,Stainless steel plaques to remove dirt,dust,droppings with cleaning agent 6 Cleaning of Water pump, filter of all dirt & dust taking all due care 7 All chambers and drainage line to be cleaned of all accumulated silt, dirt & maintain in functioning state all time 8 Faucet - working and plumbing -replacement and repair works if required in like to like materials (3yrs DLP for work)in case of damage /vandalism 9 Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals (1yr DLP for work) 10 Regular servicing of the Water filter to maintain in functioning condition 11 Regular servicing of the Pump filter to maintain in functioning condition 12 Testing of water for drinking quality at the Municipal Lab 13 Rodent/Pest control of the premises to ensure that the premises is free from all Rodents/pests 14 Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge 15 Re-fixing the existing dislodged stone by chipping out the loose mortar and cleaning the Joints, re-fixing by mixing the cement mortar in the proportion of 1:6 (1 parts cement 6 parts Coarse Sand, filling the joint with preparation of cement Slurry and proper Compaction , leveling the mortar surface and match the top surface with existingstone flooring, curingminimum 7 days as per instructions given byEngineer-in-charge 16 Sweeping of premises by manual or mechanical means : Bandstand 17 Cleaning Stone flooring of the bandstand inside- washing and scrubbing 18 Cleaning stone plinth, stone steps, granite cladding on surrounding sitting, Cobbled stone paving - washing and scrubbing 19 Cleaning Wooden posts/beams/rafters/boarding - cleaning with moist cloth 20 Cleaning Lamp post with light fitting, Stainless steel plaque of all dirt,dust,dropping etc 21 Cleaning the Grating covering the gutter including gutter 22 Cleaning of Metal sheet roof & cast iron finial 23 Light fittings and electrification- replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories checked for proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals (1yr DLP for work) 24 repainting the monument with fire retarding paint with scrapping as directed as per item specification no. B-1, after DLP ends of the earlier painting work (3yrs DLP for work) 25 Repainting the C.I. Finial with Synthetic enamel paint as directed as per specifications after DLP ends of the earlier painting work (3yrs DLP for work) 26 Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge 27 Sweeping of premises i.e. Basalt paving, the green landscape, tramp tracks : Flora Fountain 28 Cleaning the grill, lamp posts, light fixtures, benches to remove the dust, dirt, droppings with moist cloth and cleaning agent 29 Draining the water from the trough, cleaning the monument with mist cleaning, Ph balanced surfactants and approved algaecide, clearing openings of all spouts, cleaning the trough and its walls and re-filling the trough etc be undertaken under strict guidance of the conservator (Refer: C-1 for guidance) 30 Operation of the fountain pump, lights as per the schedule provided by Engineer-in-charge 31 Maintenance of lawn,tree i.e. watering, trimming, replacing the damaged lawn etc 32 Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work) 33 Conservation measure for the monument, which would include steam cleaning the monument, re-pointing, lime grouting, crack filling(Dentistry repairs), arresting the leakages including application of epoxy primer and paint on the cast iron spouts etc, with application of anti-moss coating and consolidant at the end, including erection scaffolding cup-lock/double bamboo as feasible for cleaning, platforms, covering with hessian cloth with proper signages etc, to be execute under supervision of Conservator or by conservator himself as required - Specifications C-2, C-3 (1yr DLP for work) 34 Repainting the grill by scrapping the old paint,applying the epoxy primer and application of 2 coats epoxy paintdirected by Engineer-In-Charge (3yrs DLP for work) 35 Servicing of the Pump and electric panel 36 Cleaning the brass metal on the grill with brass cleaning agent and PU coating of Du pont or equivalent make (1yr DLP for work) 37 Re-fixing the existing dislodged stone by chipping out the loose mortar and cleaning the Joints, re-fixing in 50mm mortar by mixing the cement mortar in the proportion of 1:6 (1 parts cement 6 parts Coarse Sand, filling the joint with preparation of cement Slurry and proper Compaction , levelling the mortar surface and match the top surface with existingstone flooring, curingminimum 7 days as per instructions given byEngineer-in-charge 38 Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge 39 Polishing Italian Carra marble 40 security personnel from authorized security agency to manage security of the premises, raising alarm in case of breakdown of system/infrastructure 41 Light, Foldable, free standing sun shed for security personnel 42 Sweeping of premises : Fitzgerald 43 Cobble stone flooring, steps - washing and scrubbing 44 Cleaning the complete monument from top to bottom with air pressure jet pump , bird dropping and hard stains to be clean localized without wetting with water. Clean water basin, tazas, and nozzles with water and a wire brush, ensuring no chemicals are applied Remove water salts and residues to be execute under supervision of Conservator/sculptor artis 45 Operation of the fountain pump, lights, filling the UG tank as per the schedule provided by Engineer-in-charge 46 Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories to be checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work) 47 Scrape and clean the monument using appropriate abrasives, oxidize the surface, and highlight areas using wire cups or buffing wheels, apply PU (polyurethane) coat (Nippon or equivalent brand) using an air compressor and airbrushincluding checking the condition of all nut bolts and tightening them, erecting scaffolding, working platform,hessian cloth etc to be execute by Conservator/sculptor artist as directed Engineer-in-charge 48 Re-fixing the existing dislodged stone by chipping out the loose mortar and cleaning the Joints, re-fixing in 50mm mortar by mixing the cement mortar in the proportion of 1:6 (1 parts cement 6 parts Coarse Sand, filling the joint with preparation of cement Slurry and proper Compaction , levelling the mortar surface and match the top surface with existingstone flooring, curingminimum 7 days as per instructions given byEngineer-in-charge 49 Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge 50 Sweeping of premises i.e.paving, the green landscape : Muljee 51 Cleaning the grill, lamp posts, light fixtures, to remove the dust, dirt, droppings with moist cloth and cleaning agent 52 Draining the water from the trough, cleaning the monument with mist cleaning, Ph balanced surfactants and clearing all ficus growth with approved algaecide, clearing openings of all spouts, cleaning the trough and its walls and re-filling the trough etc be undertaken under strict guidance of the conservator 53 Operation of the fountain pump, lights as per the schedule provided by Engineer-in-charge 54 Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work) 55 Conservation measure for the monument, which would include steam cleaning the monument, re-pointing, lime grouting, crack filling(Dentistry repairs)where ever required including application of epoxy primer and paint on the cast iron spouts etc, with application of anti-moss coating and ethyl silicate based cosolidant at the end, including erection scaffolding cup-lock/double bamboo as feasible for conserving, platforms, covering with hessian cloth with proper signages etc, to be execute under supervision of Conservator or by conservator himself as required - Specifications C-5, C-6 (1yr DLP for work) 56 Repainting the grill by scrapping the old paint,applying the epoxy primer and application of 2 coats epoxy paintdirected by Engineer-In-Charge (3yrs DLP for work) 57 Servicing of the Pump and electric panel 58 security personnel from authorized security agency to manage security of the premises, raising alarm in case of breakdown of system/infrastructure 59 Light, Foldable, free standing sun shed for security personnel 60 Draining the water from the trough, cleaning the monument with mist cleaning, Ph balanced surfactants and approved algaecide, clearing openings of all spouts, cleaning the trough and its walls and re-filling the trough etc be undertaken under strict guidance of the conservator (Refer: C-1 for guidance) : Wellington 61 Operation of the fountain pump, managing the water for functioning, lights as per the schedule provided by Engineer-in-charge 62 Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work) 63 Conservation measure for the monument, which would include steam cleaning the monument, re-pointing the monument, fullers earth poulticing, cleaning the marble statuary etc, with application of anti-moss coating, including erection scaffolding cup-lock/double bamboo as feasible for cleaning, platforms, covering with hessian clothetc, to be execute under supervision of Conservator or by conservator himself as required - Specifications C-2, C-3 (1yr DLP for work) 64 Servicing of the Pump and electric panel, necessary service report to be submitted 65 Repainting the CI decorative elements by scrapping the old paint using a paint remover and wire cup wheels,applying the zinc chromate primer air compressor and gun ,apply PS grey to fill all minor voids followed by application black matt PU colour (Nippon or equivalent brand ) using an air compressor and airbrush, apply a final clear PU matt coat over the CImotifs for protectiondirected by Engineer-In-Charge (3yrs DLP for work) 66 Cleaning the complete monument from top to bottom with air pressure jet pump , bird dropping and hard stains to be clean localized without wetting the statue with water to be execute under supervision of Conservator/sculptor artist: Bronze 67 Cleaning of the pedestal of all dirt, dust, droppings, algae with low pressure jetfirst rinsing it, then application of mild Ph balanced surfactants and finally jet cleaning to be execute under supervision of Conservator/sculptor artist 68 Sweeping the statue enclosure surrounding the pedestal 69 Remove the existing oxidation layer using a wire brush or grinding wheel, heat the statue evenly with a gas heater torch, Oxidize the heated surface using appropriate salts or liquid solutions, leave for 24 hours to set, highlight areas using wire brushes, buffing wheels, or grinding wheels as required, apply PU coat (Nippon brand) using a compressor and airbrush. 70 Re-pointing the pedestal with lime surkhi mortar with natural stainer as directed as per specifications 71 Cleaning the statues of all dirt, dust, droppings with low pressure jetfirst reinsing it, then application of mild Ph balanced surfactantsand finally jet cleaning to be execute under supervision of Conservator/sculptor artist : Marble 72 Sweeping the statue enclosure surrounding the pedestal 73 Conserving the marble statue with help of Fullers earth poulticing,polishing buffing etc supervision of Conservator or by conservator/sculptor artist himself as required (1yr DLP for work) 74 Re-pointing the pedestal with lime surkhi mortar with natural stainer as directed

BOQ

Name of Work: Triennial maintenance contractor for regular maintenance of various monuments and statues in the Fort Heritage Precinct, Mumbai.
Sl. No. Item Description
1Premises – Sweeping by manual or mechanical means : Kothari Pyaav
2Premises - scrubbing, washing with disinfectant including flooring, Kerbs, bund wall, gratings, chambers covers etc
3The complete structure including drinking water trough and animal troughs to be cleaned with mist cleaning and Ph balanced surfactant as directed by Engineer-in-charge (Specification No. A-2)
4Overhead Water tank and underground water tank including water faucet to be cleaned with disinfecting material as per the cleaning norms for water tanks (Appendix : I -A-1)
5Cleaning of Cast Iron railing, Lamp Posts with light fittings,stone pedestal, Art Installation,Stainless steel plaques to remove dirt,dust,droppings with cleaning agent
6Cleaning of Water pump, filter of all dirt & dust taking all due care
7All chambers and drainage line to be cleaned of all accumulated silt, dirt & maintain in functioning state all time
8Faucet - working and plumbing -replacement and repair works if required in like to like materials (3yrs DLP for work)in case of damage /vandalism
9Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCB\"s for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals (1yr DLP for work)
10Regular servicing of the Water filter to maintain in functioning condition
11Regular servicing of the Pump filter to maintain in functioning condition
12Testing of water for drinking quality at the Municipal Lab
13Rodent/Pest control of the premises to ensure that the premises is free from all Rodents/pests
14Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge
15Re-fixing the existing dislodged stone by chipping out the loose mortar and cleaning the Joints, re-fixing by mixing the cement mortar in the proportion of 1:6 (1 parts cement 6 parts Coarse Sand, filling the joint with preparation of cement Slurry and proper Compaction , leveling the mortar surface and match the top surface with existingstone flooring, curingminimum 7 days as per instructions given byEngineer-in-charge
16Sweeping of premises by manual or mechanical means : Bandstand
17Cleaning Stone flooring of the bandstand inside- washing and scrubbing
18Cleaning stone plinth, stone steps, granite cladding on surrounding sitting, Cobbled stone paving - washing and scrubbing
19Cleaning Wooden posts/beams/rafters/boarding - cleaning with moist cloth
20Cleaning Lamp post with light fitting, Stainless steel plaque of all dirt,dust,dropping etc
21Cleaning the Grating covering the gutter including gutter
22Cleaning of Metal sheet roof & cast iron finial
23Light fittings and electrification- replacement and repair works if required. Checking of cables, wires and MCB\"s for overheating and loose connections including pumps and accessories checked for proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals (1yr DLP for work)
24repainting the monument with fire retarding paint with scrapping as directed as per item specification no. B-1, after DLP ends of the earlier painting work (3yrs DLP for work)
25Repainting the C.I. Finial with Synthetic enamel paint as directed as per specifications after DLP ends of the earlier painting work (3yrs DLP for work)
26Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge
27Sweeping of premises i.e. Basalt paving, the green landscape, tramp tracks : Flora Fountain
28Cleaning the grill, lamp posts, light fixtures, benches to remove the dust, dirt, droppings with moist cloth and cleaning agent
29Draining the water from the trough, cleaning the monument with mist cleaning, Ph balanced surfactants and approved algaecide, clearing openings of all spouts, cleaning the trough and its walls and re-filling the trough etc be undertaken under strict guidance of the conservator (Refer: C-1 for guidance)
30Operation of the fountain pump, lights as per the schedule provided by Engineer-in-charge
31Maintenance of lawn,tree i.e. watering, trimming, replacing the damaged lawn etc
32Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCB\"s for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work)
33Conservation measure for the monument, which would include steam cleaning the monument, re-pointing, lime grouting, crack filling(Dentistry repairs), arresting the leakages including application of epoxy primer and paint on the cast iron spouts etc, with application of anti-moss coating and consolidant at the end, including erection scaffolding cup-lock/double bamboo as feasible for cleaning, platforms, covering with hessian cloth with proper signages etc, to be execute under supervision of Conservator or by conservator himself as required - Specifications C-2, C-3 (1yr DLP for work)
34Repainting the grill by scrapping the old paint,applying the epoxy primer and application of 2 coats epoxy paintdirected by Engineer-In-Charge (3yrs DLP for work)
35Servicing of the Pump and electric panel
36Cleaning the brass metal on the grill with brass cleaning agent and PU coating of Du pont or equivalent make (1yr DLP for work)
37Re-fixing the existing dislodged stone by chipping out the loose mortar and cleaning the Joints, re-fixing in 50mm mortar by mixing the cement mortar in the proportion of 1:6 (1 parts cement 6 parts Coarse Sand, filling the joint with preparation of cement Slurry and proper Compaction , levelling the mortar surface and match the top surface with existingstone flooring, curingminimum 7 days as per instructions given byEngineer-in-charge
38Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge
39Polishing Italian Carra marble
40security personnel from authorized security agency to manage security of the premises, raising alarm in case of breakdown of system/infrastructure
41Light, Foldable, free standing sun shed for security personnel
42Sweeping of premises : Fitzgerald
43Cobble stone flooring, steps - washing and scrubbing
44Cleaning the complete monument from top to bottom with air pressure jet pump , bird dropping and hard stains to be clean localized without wetting with water. Clean water basin, tazas, and nozzles with water and a wire brush, ensuring no chemicals are applied Remove water salts and residues to be execute under supervision of Conservator/sculptor artis
45Operation of the fountain pump, lights, filling the UG tank as per the schedule provided by Engineer-in-charge
46Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCB\"s for overheating and loose connections including pumps and accessories to be checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work)
47Scrape and clean the monument using appropriate abrasives, oxidize the surface, and highlight areas using wire cups or buffing wheels, apply PU (polyurethane) coat (Nippon or equivalent brand) using an air compressor and airbrushincluding checking the condition of all nut bolts and tightening them, erecting scaffolding, working platform,hessian cloth etc to be execute by Conservator/sculptor artist as directed Engineer-in-charge
48Re-fixing the existing dislodged stone by chipping out the loose mortar and cleaning the Joints, re-fixing in 50mm mortar by mixing the cement mortar in the proportion of 1:6 (1 parts cement 6 parts Coarse Sand, filling the joint with preparation of cement Slurry and proper Compaction , levelling the mortar surface and match the top surface with existingstone flooring, curingminimum 7 days as per instructions given byEngineer-in-charge
49Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge
50Sweeping of premises i.e.paving, the green landscape : Muljee
51Cleaning the grill, lamp posts, light fixtures, to remove the dust, dirt, droppings with moist cloth and cleaning agent
52Draining the water from the trough, cleaning the monument with mist cleaning, Ph balanced surfactants and clearing all ficus growth with approved algaecide, clearing openings of all spouts, cleaning the trough and its walls and re-filling the trough etc be undertaken under strict guidance of the conservator
53Operation of the fountain pump, lights as per the schedule provided by Engineer-in-charge
54Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCB\"s for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work)
55Conservation measure for the monument, which would include steam cleaning the monument, re-pointing, lime grouting, crack filling(Dentistry repairs)where ever required including application of epoxy primer and paint on the cast iron spouts etc, with application of anti-moss coating and ethyl silicate based cosolidant at the end, including erection scaffolding cup-lock/double bamboo as feasible for conserving, platforms, covering with hessian cloth with proper signages etc, to be execute under supervision of Conservator or by conservator himself as required - Specifications C-5, C-6 (1yr DLP for work)
56Repainting the grill by scrapping the old paint,applying the epoxy primer and application of 2 coats epoxy paintdirected by Engineer-In-Charge (3yrs DLP for work)
57Servicing of the Pump and electric panel
58security personnel from authorized security agency to manage security of the premises, raising alarm in case of breakdown of system/infrastructure
59Light, Foldable, free standing sun shed for security personnel
60Draining the water from the trough, cleaning the monument with mist cleaning, Ph balanced surfactants and approved algaecide, clearing openings of all spouts, cleaning the trough and its walls and re-filling the trough etc be undertaken under strict guidance of the conservator (Refer: C-1 for guidance) : Wellington
61Operation of the fountain pump, managing the water for functioning, lights as per the schedule provided by Engineer-in-charge
62Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCB\"s for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work)
63Conservation measure for the monument, which would include steam cleaning the monument, re-pointing the monument, fullers earth poulticing, cleaning the marble statuary etc, with application of anti-moss coating, including erection scaffolding cup-lock/double bamboo as feasible for cleaning, platforms, covering with hessian clothetc, to be execute under supervision of Conservator or by conservator himself as required - Specifications C-2, C-3 (1yr DLP for work)
64Servicing of the Pump and electric panel, necessary service report to be submitted
65Repainting the CI decorative elements by scrapping the old paint using a paint remover and wire cup wheels,applying the zinc chromate primer air compressor and gun ,apply PS grey to fill all minor voids followed by application black matt PU colour (Nippon or equivalent brand ) using an air compressor and airbrush, apply a final clear PU matt coat over the CImotifs for protectiondirected by Engineer-In-Charge (3yrs DLP for work)
66Cleaning the complete monument from top to bottom with air pressure jet pump , bird dropping and hard stains to be clean localized without wetting the statue with water to be execute under supervision of Conservator/sculptor artist: Bronze
67Cleaning of the pedestal of all dirt, dust, droppings, algae with low pressure jetfirst rinsing it, then application of mild Ph balanced surfactants and finally jet cleaning to be execute under supervision of Conservator/sculptor artist
68Sweeping the statue enclosure surrounding the pedestal
69Remove the existing oxidation layer using a wire brush or grinding wheel, heat the statue evenly with a gas heater torch, Oxidize the heated surface using appropriate salts or liquid solutions, leave for 24 hours to set, highlight areas using wire brushes, buffing wheels, or grinding wheels as required, apply PU coat (Nippon brand) using a compressor and airbrush.
70Re-pointing the pedestal with lime surkhi mortar with natural stainer as directed as per specifications
71Cleaning the statues of all dirt, dust, droppings with low pressure jetfirst reinsing it, then application of mild Ph balanced surfactantsand finally jet cleaning to be execute under supervision of Conservator/sculptor artist : Marble
72Sweeping the statue enclosure surrounding the pedestal
73Conserving the marble statue with help of Fullers earth poulticing,polishing buffing etc supervision of Conservator or by conservator/sculptor artist himself as required (1yr DLP for work)
74Re-pointing the pedestal with lime surkhi mortar with natural stainer as directed

AI Tender Summary

OUR REF NO 48994885
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 08-05-2025
Authority
Authority Name Municipal Corporation Of Greater Mumbai
Work Description Triennial Maintenance Contract For Regular Maintenance Of Various Monuments And Statues In The Fort Heritage Precinct Mumbai- 1 Premises – Sweeping by manual or mechanical means : Kothari Pyaav 2 Premises - scrubbing, washing with disinfectant including flooring, Kerbs, bund wall, gratings, chambers covers etc 3 The complete structure including drinking water trough and animal troughs to be cleaned with mist cleaning and Ph balanced surfactant as directed by Engineer-in-charge (Specification No. A-2) 4 Overhead Water tank and underground water tank including water faucet to be cleaned with disinfecting material as per the cleaning norms for water tanks (Appendix : I -A-1) 5 Cleaning of Cast Iron railing, Lamp Posts with light fittings,stone pedestal, Art Installation,Stainless steel plaques to remove dirt,dust,droppings with cleaning agent 6 Cleaning of Water pump, filter of all dirt & dust taking all due care 7 All chambers and drainage line to be cleaned of all accumulated silt, dirt & maintain in functioning state all time 8 Faucet - working and plumbing -replacement and repair works if required in like to like materials (3yrs DLP for work)in case of damage /vandalism 9 Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals (1yr DLP for work) 10 Regular servicing of the Water filter to maintain in functioning condition 11 Regular servicing of the Pump filter to maintain in functioning condition 12 Testing of water for drinking quality at the Municipal Lab 13 Rodent/Pest control of the premises to ensure that the premises is free from all Rodents/pests 14 Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge 15 Re-fixing the existing dislodged stone by chipping out the loose mortar and cleaning the Joints, re-fixing by mixing the cement mortar in the proportion of 1:6 (1 parts cement 6 parts Coarse Sand, filling the joint with preparation of cement Slurry and proper Compaction , leveling the mortar surface and match the top surface with existingstone flooring, curingminimum 7 days as per instructions given byEngineer-in-charge 16 Sweeping of premises by manual or mechanical means : Bandstand 17 Cleaning Stone flooring of the bandstand inside- washing and scrubbing 18 Cleaning stone plinth, stone steps, granite cladding on surrounding sitting, Cobbled stone paving - washing and scrubbing 19 Cleaning Wooden posts/beams/rafters/boarding - cleaning with moist cloth 20 Cleaning Lamp post with light fitting, Stainless steel plaque of all dirt,dust,dropping etc 21 Cleaning the Grating covering the gutter including gutter 22 Cleaning of Metal sheet roof & cast iron finial 23 Light fittings and electrification- replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories checked for proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals (1yr DLP for work) 24 repainting the monument with fire retarding paint with scrapping as directed as per item specification no. B-1, after DLP ends of the earlier painting work (3yrs DLP for work) 25 Repainting the C.I. Finial with Synthetic enamel paint as directed as per specifications after DLP ends of the earlier painting work (3yrs DLP for work) 26 Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge 27 Sweeping of premises i.e. Basalt paving, the green landscape, tramp tracks : Flora Fountain 28 Cleaning the grill, lamp posts, light fixtures, benches to remove the dust, dirt, droppings with moist cloth and cleaning agent 29 Draining the water from the trough, cleaning the monument with mist cleaning, Ph balanced surfactants and approved algaecide, clearing openings of all spouts, cleaning the trough and its walls and re-filling the trough etc be undertaken under strict guidance of the conservator (Refer: C-1 for guidance) 30 Operation of the fountain pump, lights as per the schedule provided by Engineer-in-charge 31 Maintenance of lawn,tree i.e. watering, trimming, replacing the damaged lawn etc 32 Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work) 33 Conservation measure for the monument, which would include steam cleaning the monument, re-pointing, lime grouting, crack filling(Dentistry repairs), arresting the leakages including application of epoxy primer and paint on the cast iron spouts etc, with application of anti-moss coating and consolidant at the end, including erection scaffolding cup-lock/double bamboo as feasible for cleaning, platforms, covering with hessian cloth with proper signages etc, to be execute under supervision of Conservator or by conservator himself as required - Specifications C-2, C-3 (1yr DLP for work) 34 Repainting the grill by scrapping the old paint,applying the epoxy primer and application of 2 coats epoxy paintdirected by Engineer-In-Charge (3yrs DLP for work) 35 Servicing of the Pump and electric panel 36 Cleaning the brass metal on the grill with brass cleaning agent and PU coating of Du pont or equivalent make (1yr DLP for work) 37 Re-fixing the existing dislodged stone by chipping out the loose mortar and cleaning the Joints, re-fixing in 50mm mortar by mixing the cement mortar in the proportion of 1:6 (1 parts cement 6 parts Coarse Sand, filling the joint with preparation of cement Slurry and proper Compaction , levelling the mortar surface and match the top surface with existingstone flooring, curingminimum 7 days as per instructions given byEngineer-in-charge 38 Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge 39 Polishing Italian Carra marble 40 security personnel from authorized security agency to manage security of the premises, raising alarm in case of breakdown of system/infrastructure 41 Light, Foldable, free standing sun shed for security personnel 42 Sweeping of premises : Fitzgerald 43 Cobble stone flooring, steps - washing and scrubbing 44 Cleaning the complete monument from top to bottom with air pressure jet pump , bird dropping and hard stains to be clean localized without wetting with water. Clean water basin, tazas, and nozzles with water and a wire brush, ensuring no chemicals are applied Remove water salts and residues to be execute under supervision of Conservator/sculptor artis 45 Operation of the fountain pump, lights, filling the UG tank as per the schedule provided by Engineer-in-charge 46 Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories to be checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work) 47 Scrape and clean the monument using appropriate abrasives, oxidize the surface, and highlight areas using wire cups or buffing wheels, apply PU (polyurethane) coat (Nippon or equivalent brand) using an air compressor and airbrushincluding checking the condition of all nut bolts and tightening them, erecting scaffolding, working platform,hessian cloth etc to be execute by Conservator/sculptor artist as directed Engineer-in-charge 48 Re-fixing the existing dislodged stone by chipping out the loose mortar and cleaning the Joints, re-fixing in 50mm mortar by mixing the cement mortar in the proportion of 1:6 (1 parts cement 6 parts Coarse Sand, filling the joint with preparation of cement Slurry and proper Compaction , levelling the mortar surface and match the top surface with existingstone flooring, curingminimum 7 days as per instructions given byEngineer-in-charge 49 Scrapping the corrosion area, Cleaning the surface, removing the dirt,grime and existing coating using appropriate cleaning agent and techniques,restoring an existing Stainless steel (SS-306 grade) information plaque signage rewrite missing lettering words with high quality durable lettering material that match the original Font and style and applying a Protective polyurethane (PU) coat with complete work as per instructions of Engineer-in-charge 50 Sweeping of premises i.e.paving, the green landscape : Muljee 51 Cleaning the grill, lamp posts, light fixtures, to remove the dust, dirt, droppings with moist cloth and cleaning agent 52 Draining the water from the trough, cleaning the monument with mist cleaning, Ph balanced surfactants and clearing all ficus growth with approved algaecide, clearing openings of all spouts, cleaning the trough and its walls and re-filling the trough etc be undertaken under strict guidance of the conservator 53 Operation of the fountain pump, lights as per the schedule provided by Engineer-in-charge 54 Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work) 55 Conservation measure for the monument, which would include steam cleaning the monument, re-pointing, lime grouting, crack filling(Dentistry repairs)where ever required including application of epoxy primer and paint on the cast iron spouts etc, with application of anti-moss coating and ethyl silicate based cosolidant at the end, including erection scaffolding cup-lock/double bamboo as feasible for conserving, platforms, covering with hessian cloth with proper signages etc, to be execute under supervision of Conservator or by conservator himself as required - Specifications C-5, C-6 (1yr DLP for work) 56 Repainting the grill by scrapping the old paint,applying the epoxy primer and application of 2 coats epoxy paintdirected by Engineer-In-Charge (3yrs DLP for work) 57 Servicing of the Pump and electric panel 58 security personnel from authorized security agency to manage security of the premises, raising alarm in case of breakdown of system/infrastructure 59 Light, Foldable, free standing sun shed for security personnel 60 Draining the water from the trough, cleaning the monument with mist cleaning, Ph balanced surfactants and approved algaecide, clearing openings of all spouts, cleaning the trough and its walls and re-filling the trough etc be undertaken under strict guidance of the conservator (Refer: C-1 for guidance) : Wellington 61 Operation of the fountain pump, managing the water for functioning, lights as per the schedule provided by Engineer-in-charge 62 Light fittings and electrification-replacement and repair works if required. Checking of cables, wires and MCBs for overheating and loose connections including pumps and accessories checked or proper functioning and rectification to be undertaken. Damaged light fixtures to be replaced. Test such as earth resistance, over load shall be carried out at regular intervals(1yr DLP for work) 63 Conservation measure for the monument, which would include steam cleaning the monument, re-pointing the monument, fullers earth poulticing, cleaning the marble statuary etc, with application of anti-moss coating, including erection scaffolding cup-lock/double bamboo as feasible for cleaning, platforms, covering with hessian clothetc, to be execute under supervision of Conservator or by conservator himself as required - Specifications C-2, C-3 (1yr DLP for work) 64 Servicing of the Pump and electric panel, necessary service report to be submitted 65 Repainting the CI decorative elements by scrapping the old paint using a paint remover and wire cup wheels,applying the zinc chromate primer air compressor and gun ,apply PS grey to fill all minor voids followed by application black matt PU colour (Nippon or equivalent brand ) using an air compressor and airbrush, apply a final clear PU matt coat over the CImotifs for protectiondirected by Engineer-In-Charge (3yrs DLP for work) 66 Cleaning the complete monument from top to bottom with air pressure jet pump , bird dropping and hard stains to be clean localized without wetting the statue with water to be execute under supervision of Conservator/sculptor artist: Bronze 67 Cleaning of the pedestal of all dirt, dust, droppings, algae with low pressure jetfirst rinsing it, then application of mild Ph balanced surfactants and finally jet cleaning to be execute under supervision of Conservator/sculptor artist 68 Sweeping the statue enclosure surrounding the pedestal 69 Remove the existing oxidation layer using a wire brush or grinding wheel, heat the statue evenly with a gas heater torch, Oxidize the heated surface using appropriate salts or liquid solutions, leave for 24 hours to set, highlight areas using wire brushes, buffing wheels, or grinding wheels as required, apply PU coat (Nippon brand) using a compressor and airbrush. 70 Re-pointing the pedestal with lime surkhi mortar with natural stainer as directed as per specifications 71 Cleaning the statues of all dirt, dust, droppings with low pressure jetfirst reinsing it, then application of mild Ph balanced surfactantsand finally jet cleaning to be execute under supervision of Conservator/sculptor artist : Marble 72 Sweeping the statue enclosure surrounding the pedestal 73 Conserving the marble statue with help of Fullers earth poulticing,polishing buffing etc supervision of Conservator or by conservator/sculptor artist himself as required (1yr DLP for work) 74 Re-pointing the pedestal with lime surkhi mortar with natural stainer as directed
Basic Detail
Tender No Ch.E./B.M./1162/29.04.2025
Bidding Type Tender
Location
City Mumbai
State Maharashtra
Key Dates
Publish Date 03 May 2025
Submission Date 08 May 2025
Open Date 09 May 2025
Finance
Tender Value Ref. Documents
Tender Fee 16500
EMD 2.08 Lakhs
Exemption Not Available
Document List
48860fd7-6590-44aa-b614-1cec6d373df9.html
BOQ_2043473.xls
Tendernotice_1.pdf
VOLI.pdf
VOLIII.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 03, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
May 08, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
May 09, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

48860fd7-6590-44aa-b614-1cec6d373df9.html

xls

BOQ_2043473.xls

pdf

Tendernotice_1.pdf

pdf

VOLI.pdf

pdf

VOLIII.pdf