}

Tender For Construction Work Of Children Park Mohalla Ansariyan - Dewatering Of Pond 2 Desilting Of Pond In Or Under Liquid Mud & Disposal Of Silt 1 Km From Site.S.I-252(A)(I)1+261(B)+231(A) 5 Km 3 Earth Work In Excavation In Foundation In Ordinary So, Shamli-Uttar Pradesh

Nagar Panchayat has published Tender For Construction Work Of Children Park Mohalla Ansariyan - Dewatering Of Pond 2 Desilting Of Pond In Or Under Liquid Mud & Disposal Of Silt 1 Km From Site.S.I-252(A)(I)1+261(B)+231(A) 5 Km 3 Earth Work In Excavation In Foundation In Ordinary So. Submission Date for this Tender is 24-05-2025. Gardening Tenders in Shamli Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

48990097
Tender For Construction Work Of Children Park Mohalla Ansariyan - Dewatering Of Pond 2 Desilting Of Pond In Or Under Liquid Mud & Disposal Of Silt 1 Km From Site.S.I-252(A)(I)1+261(B)+231(A) 5 Km 3 Earth Work In Excavation In Foundation In Ordinary So
Tender
Indian
Uttar Pradesh
Shamli
24-05-2025

Tender Documents

Tender Details

Tender For Construction Work Of Children Park Mohalla Ansariyan - Dewatering of pond 2 Desilting of pond in or under liquid mud & disposal of silt 1 km from site.S.I-252(a)(i)1+261(b)+231(a) 5 km 3 Earth work in excavation in foundation in ordinary soil. S.I. No. 251(a)(4x3) 4 E/W in filling in ordinary soil by carted earth beyond 8kms extra lead from site. 5 Concrete with 4c.m. gauge brick ballast, c. sand of 1:25 F.M. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials labour Tools & plants etc. required for proper completion of the work.(S.I - 273) 6 R.C.C. (1:1.5:3) excluding steel but for footing.S.I-287a 7 R.C.C. (1:1.5:3) in columns & beam excluding steel.S.I-289 8 M-150Brick work in 1:4 cement & c.sand mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. S.I-305 9 M-150Brick work in 1:4cement & f.sand mortar in super structure including supply of all materials labour, Tools & plants etc. required for proper completion of the work.S.I-305+309+310 10 12 mm thick plaster with cement and c. sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc.SI 584 11 R.C.C. (1:1.5:3) excluding steel but for slab.S.I-284a 12 Cement conc. 1:1.5:3 with cement,c.sand & stone grit .S.I-Ch. No.20 new item 9(1) 13 Mild steel iron work for Reinforcement in r.c.c work. S.I-504 14 Earth work in excavation in foundation in ordinary soil. S.I. No. 251(a) 15 Concrete with 4c.m. gauge brick ballast, c. sand of 1:25 F.M. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials labour Tools & plants etc. required for proper completion of the work.(S.I - 273) 16 R.C.C. (1:1.5:3) excluding steel but for footing.S.I-287a 17 R.C.C. (1:1.5:3) in columns & beam excluding steel.S.I-289 18 M-150Brick work in 1:4 cement & c.sand mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. S.I-305 19 M-150Brick work in 1:4cement &f.sand mortar in super structure including supply of all materials labour, Tools & plants etc. required for proper completion of the work.S.I-305+309+310 20 12 mm thick plaster with cement and c. sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc.SI 584 21 R.C.C. (1:1.5:3) excluding steel but for slab.S.I-284a 22 Cement conc. 1:1.5:3 with cement,c.sand & stone grit. S.I-Ch. No.20 new item 9(1) 23 Mild steel iron work for Reinforcement in r.c.c work. S.I-504 24 Earth work in excavation in foundation in ordinary soil. S.I. No. 251(a) 25 Concrete with 4c.m. gauge brick ballast, c. sand of 1:25 F.M. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials labour Tools & plants etc. required for proper completion of the work.(S.I - 273) 26 R.C.C. (1:1.5:3) excluding steel but for footing.S.I-287a 27 R.C.C. (1:1.5:3) in columns & beam excluding steel.S.I-289 28 M-150Brick work in 1:4 cement & c.sand mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. S.I-305 29 M-150Brick work in 1:4cement & f.sand mortar in super structure including supply of all materials labour, Tools & plants etc. required for proper completion of the work.S.I-305+309+310 30 12 mm thick plaster with cement and c. sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc.SI 584 31 R.C.C. (1:1.5:3) excluding steel but for slab.S.I-284a 32 Cement conc. 1:1.5:3 with cement,c.sand & stone grit .S.I-Ch. No.20 new item 9(1) 33 Mild steel iron work for Reinforcement in r.c.c work. S.I-504 34 Earth work in excavation in foundation in ordinary soil. S.I. No. 251(a)(4x3) 35 Concrete with 4c.m. gauge brick ballast, c. sand of 1:25 F.M. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials labour Tools & plants etc. required for proper completion of the work.(S.I - 273) 36 R.C.C. (1:1.5:3) excluding steel but for footing.S.I-287a 37 R.C.C. (1:1.5:3) in columns & beam excluding steel.S.I-289 38 M-150Brick work in 1:4 cement & c.sand mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. S.I-305 39 M-150Brick work in 1:4cement & f.sand mortar in super structure including supply of all materials labour, Tools & plants etc. required for proper completion of the work.S.I-305+309+310 40 12 mm thick plaster with cement and c. sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc.SI 584 41 R.C.C. (1:1.5:3) excluding steel but for slab.S.I-284a 42 Cement conc. 1:1.5:3 with cement,c.sand & stone grit .S.I-Ch. No.20 new item 9(1) 43 Mild steel iron work for Reinforcement in r.c.c work. S.I-504 44 Supply and fixing of Kota stone in floor ing 25 mm thick and joint filled with 1:2 cement and coarse sand with approved colouring materials to be given an even shade with 12 mm base coat (bedding) of 1:2 cement & coarse sand morter and polished by hand or machine and finally finished with french manson polish or other approved polishincluding supply of all materials, labour,Tools & plants etc. required for proper completion of the work. 45 Providing & Applying of wall putty with two coat app. Quality of paint including supply of all materals labour t&p etc. 46 Finishing wall weather coat paint with two coat app. Quality of paint including supply of all materals labour t&p etc 47 M.S iron work in heavy sizes such as built up gate railing ,doors frames including cutting welding and wastage including supply of all material,labour,t&petc. Required for proper completion of work.S.I-503 48 Providing laying spreading and compaction stone aggregates of 22.4-53mm size to water bond macadam specification including spreading in uniform thikness hand packing rooling with 3 wheeled 8-10 tonne roller in stages to proper grade and camber approved complete.(As per analysis) 49 Supply of 80mm thick Precast cement concerete I-Shape Interlocking paver blocks ISI markconfirming to IS: 15658-2006 with top layer of minimum 5 mm thicknesshaving plan dimension 200x(160+120mm) of O.P. Cement , smooth high gloss finish, skid resistant; manufactured from rubber moulds through vibro-compression mechanism. The compressive strength of concrete paver block shall not be less than 40Mpaand weigt 4.5kg perincluding cost of material, with a blanket layer of 4.00cm. thick fine sand. includinglabour, T & Petc required for proper completion of the work as directed by Engineer-in-charge.S.I-ch.20 new item 14 50 Extra charge for colour tiles difference.S.I-ch.20 new item 11=17.30-15.50=1.8x35=63 51 Electricity 52 Earth work in excavation in foundation in ordinary soil. S.I. No. 251(a)(4x3) 53 Concrete with 4c.m. gauge brick ballast, c. sand of 1:25 F.M. and cement, in proportion of 12:6:1 in foundation and under floors including supply of all materials labour Tools & plants etc. required for proper completion of the work.(S.I - 273) 54 R.C.C. (1:1.5:3) excluding steel but for footing.S.I-287a 55 R.C.C. (1:1.5:3) in columns & beam excluding steel.S.I-289 56 M-150Brick work in 1:4 cement & c.sand mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. S.I-305 57 M-150Brick work in 1:4cement & f.sand mortar in super structure including supply of all materials labour, Tools & plants etc. required for proper completion of the work.S.I-305+309+310 58 12 mm thick plaster with cement and c. sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour t&p etc.SI 584 59 R.C.C. (1:1.5:3) excluding steel but for slab.S.I-284a 60 Cement conc. 1:1.5:3 with cement,c.sand & stone grit .S.I-Ch. No.20 new item 9(1) 61 Mild steel iron work for Reinforcement in r.c.c work. S.I-504 62 Supply and fixing of Kota stone in floor ing 25 mm thick and joint filled with 1:2 cement and coarse sand with approved colouring materials to be given an even shade with 12 mm base coat (bedding) of 1:2 cement & coarse sand morter and polished by hand or machine and finally finished with french manson polish or other approved polishincluding supply of all materials, labour,Tools & plants etc. required for proper completion of the work. 63 Providing & Applying of wall putty with two coat app. Quality of paint including supply of all materals labour t&p etc. 64 Finishing wall weather coat paint with two coat app. Quality of paint including supply of all materals labour t&p etc. 65 M.S iron work in heavy sizes such as built up gate railing ,doors frames including cutting welding and wastage including supply of all material,labour,t&petc. Required for proper completion of work.S.I-503 66 Providing laying spreading and compaction stone aggregates of 22.4-53mm size to water bond macadam specification including spreading in uniform thikness hand packing rooling with 3 wheeled 8-10 tonne roller in stages to proper grade and camber approved complete.(As per analysis) 67 Supply of 80mm thick Precast cement concerete I-Shape Interlocking paver blocks ISI markconfirming to IS: 15658-2006 with top layer of minimum 5 mm thicknesshaving plan dimension 200x(160+120mm) of O.P. Cement , smooth high gloss finish, skid resistant; manufactured from rubber moulds through vibro-compression mechanism. The compressive strength of concrete paver block shall not be less than 40Mpaand weigt 4.5kg perincluding cost of material, with a blanket layer of 4.00cm. thick fine sand. includinglabour, T & Petc required for proper completion of the work as directed by Engineer-in-charge.S.I-ch.20 new item 14 68 Extra charge for colour tiles difference.S.I-ch.20 new item11=17.30-15.50=1.8x35=63 69 Rainwater Harvesting

Key Value

Document Fees
INR 20768 /-
EMD
INR 1080000.0 /-
Tender Value
INR 1.76 Crore /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail