Tender For Various work under deposit scheme and other related work against sanctioned packages under EDD-Atrauli (Aligarh). - Cartage of following poles Store centre or from any other place to the respective site of work through the Kachha Pacca roadincluding the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). 2 PCC poles 8.5 Mtr./ST poles 11 Mtr. 3 Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). 4 Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. 5 PCC poles 8.5 Mtr./ST poles 11 Mtr. 6 Erection of double/Try pole on PCC/ST pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. 7 PCC poles 8.5 Mtr./ST poles 11 Mtr. 8 Try Pole 9 Laying , sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. 10 ACSR Weasal Conductor. 11 ACSR Dog Conductor. 12 LT 3X50+1X35+1X16 bunch conductor. 13 Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel. as per specification of UPPCL construction manual including including loading and unloading at the both ends. 14 Grouting of PCC/ST poles 8.5/11 Mtr. Long as per RESPO norms. 15 Making the plinth of ST pole 11 Mtr. 16 Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work. 17 (a) Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work. 18 (b)Providing and fixing of stay insulator. 19 Carriage & Mounting from site to Store/store to site following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work. 20 25 KVA T/F 21 63 KVA T/F 22 100 KVA T/F 23 250 KAV T/F 24 Guarding of 11 KV Lineby laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work. 25 Chopping of tree branches which are touching to HT/LT lines. 26 Providing & Fixing ofClamps of LT,Cross Arm Holding, F-Clamp, Stay Clamp, Danger board clamp with Nut & Bolts. 27 Providing of Fixing of LT shackle insulator. 28 Providing/Fixing of missing Nut bolts and washer 29 Safe carriage of LT distribution box (three phase) from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms. 30 Safe carriageof 3x70/120 Sq.mm.33 KV/11 KVXLPE Cable from Store Center to respective site of work including loading & unloading at both ends for proper completion of work. 31 Laying of 3x70/120 Sq.mm.33 KV/11 KV under ground cable by straight through after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. 32 Laying of 3x70/120 sq.mm XLPE Cable overhead the existing new pole by of lifting spreading the cable conducting all labour T&P etc. 33 Filling of 3x70/3x120 Sq.mm. 11 KV XLPE heat shrinkable cable jointing kits indoor & outdoor type including the cost of labour T&P carrier etc for proper completion of work. 34 Carriage & Installation of 33KV/11 KV CT-PT Pole Mountedmetering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work. 35 Safe carriage & Installation of 33KV/11 KV pilfer proof metering cubicle from store centre, Sarsol to site of work. 36 Safe Cartage of 11 KV VCB from Store Center, Sarsol to 33/11 KV Sub Stations. 37 Errection and Instalation of 11 KV VCB including all labour out going incoming connection with bus bar 11 KV cable boxes tapping with empire tape & H.T. tape and connecting with earthing at 33/11 KV Sub-Station . 38 Earthing of 11 KV VCB providing & laying M.S. earth strip 50x6 mm including welding bending etc. at 33/11 KV Sub-Station. 39 Body and neutral earthing of 250 KVAL.T. distribution Transformers/VCB installed by digging of pit up to water level depth (approx. 100’) and then inserting1-1/4 dia G.I. pipe of B grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer including the cost of arrangement of all material, labourer, T&P, carrier etc. required for proper completion of work. 40 Construction of 250 KVA Transformer of Plinth of size 5’x5x4’ above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly after that a retaining wall of 9” width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. jall of 12 mm M.S. tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the Plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer. It including the cost of all material, labour T&P, carrier etc. required for proper completion of work. 41 FABRICATION & ERECTION OF FENCING AND CONSTRUCTION OF RETAINING WALL AROUND 250 KVAT/F.The complete 11/0.4 KV Substation shall be provided with two meter height fencing and retaining wall around the substation. One No. Gate with proper locking arrangement for entry of personnel shall also be provided. The fencing shall be made of 50x25 mm x10 SWG rectangular welded mesh of wire mesh in length. Wire mesh shall be fixed on panels made of 40x40x6 mm M.S. Angle. The wire mesh on panels will be supported by 25x3 mm M.S. flat on all the bracings diagonally and 50x6 M.S. Flat horizontally at the center of the panel. The panel will be joined by bolts & nuts of appropriate size with each other and on the main support on corners including supply of all material, labour, carrier and T & P etc. required for proper completion of work. The painting of complete fencing shall also be done with one coat of red oxide primer and two coat of synthetic green paint. For construction of retaining wall around the fencing, excavation of earth shall be done in foundation in ordinary soil including disposal of surplus earth at some suitable distance. The dimension of excavation shall be 1m wide, 0.45 m deep and suitable length as per wire mesh. After excavation of earth a cement concreted pad shall be laid in foundation. Concreting shall be done with Ist class brick ballast, coarse sand and cement in proportion of 8:4:1. First class brickwork shall also be done in foundation and super structure in 1:6 Cement and coarse sand including necessary cutting and moulding of bricks in foundation depth of wall 0.30 m, thickness of wall 0.35 m & superstructure brick work thickness of wall 0.23 m & depths 0.30 m including supply of all material, labour, carrier and T & P etc. required for proper completion of work. 42 Complete chemical earthing of 11/0.4 KV,Distribution Transformer by digging pits 6” dia upto 3 mtr. deep including chemical filled pipe in between (pipe-in-pipe) ISI mark B Grade & connecting with G.I strip of size 50mm X 6mm with neutral/body of 11/0.4 KV distribution transformer to above pipe-in-pipe (PIP) and filling of chemical crystalline conductive mixture containing highly conductive material around the (pipe-in-pipe) up to 3 Mtr. including making of chamber at the top of the earthing. Other details are as below:-1. Earth pipe material – mild steel, Galvanized.2-Main Electrode diameter – 42.4mm.3-Auxiliary Electrode pipe, Diameter – 76mm. 4-Wall Thickness of main Electrode: - 2.6mm.5-Wall thickness of auxiliary hole: - 3.2mm.6- Length of earthing electrode (PIP):- 3 Meter. 43 Dismantling and removal of existing following materials from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. 44 ACSR Dog Conductor. 45 Rail/Gatar Pole 46 Demounting & carriage of following capacity transformer due to damage of PCC/ST poles in storm including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work. 47 25 KVA T/F 48 63 KVA T/F