| 1 | Cartage of the following material from center Stores, Mahoba or from any other place to dump site,including the work of its loading and unloading at the respective ends and also including the work of dragging etc and also including the cost of arrangement of laborer, T&P carrier etc required for proper completion of work. |
| 2 | 8.5/9 meter long PCC pole |
| 3 | 11/13 meter long ST pole |
| 4 | 10/16 KVA transformer |
| 5 | 25 KVA transformer |
| 6 | 63 KVA transformer |
| 7 | Weasal conductor, and other line material |
| 8 | Drilling of hole in M. S. channel andangle for Double pole, guarding, Extra “T” |
| 9 | Opening of HT/LT fittings from the damaged single support of 8.5/9meter long PCC pole at various places, including the cost of arrangement of labourer, T&P etc required for proper completion of work |
| 10 | Making coils of spread and dismentalled conductor with utmost care for its maximum possible laying on the support or to placed in store. |
| 11 | Erection and grouting of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4. |
| 12 | Erection of 8.5/9 meter long PCC pole including compete HT/LT fittings as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P, carrier etc required for proper completion of work. |
| 13 | Erection of 11/13 meter long ST pole including compete HT/LT fittings as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P, carrier etc required for proper completion of work. |
| 14 | Installation and grouting of following as RESPO manual in ratio 1:4:8 in cement, sand and brick ballast. |
| 15 | 11 KV Stay set |
| 16 | Straightening of tilted / bended 8.5/9 meter long PCC pole / 11/13 meter long ST pole, as per RESPO norms. |
| 17 | Installation of Extra “T” as per RESPO manual |
| 18 | Re nozalling and tightening of stay, as per RESPO norms |
| 19 | Chopping of trees |
| 20 | Replacement of following damaged fittings. |
| 21 | 11 KV pin insulator |
| 22 | 11 KV disk insulator |
| 23 | Replacement matereal Contrector arrangeby own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer. |
| 24 | 11 KV cross arm holding clamp with nut & bolt |
| 25 | 11 KV U clamp with nut & bolt |
| 26 | 11 KV F clamp with nut & bolt |
| 27 | Installation of following capacity transformer in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work. |
| 28 | 10/16 KVA transformer |
| 29 | 25 KVA transformer |
| 30 | 63 KVA transformer |
| 31 | Laying, sagging and stringing and jumpering/ binding etc of the following conductor on the aforesaid newly erected Poles as pre RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc required for proper completion of work. |
| 32 | ACSR weasel conductor |
| 33 | Dog Conductor |
| 34 | AB Cable |
| 35 | Re-sagging, binding and jumpering of loose following conductor as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labourer, T&P carrier etc required for proper completion of work. |
| 36 | ACSR weasel conductor |
| 37 | Dog Conductor |
| 38 | AB Cable |
| 39 | Tightening of loose guarding |