| 1 | Construction of retaining wall |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 3 | OD390/2025-2026:Dry stone packing under foundation with good quality blasted rubble including conveyance ofmaterial and labour charges etc. complete as per direction of departmental officers at site |
| 4 | OD12594/2024-2025:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good quality blasted rubble and packing to compactness to lines and levels cost and conveyance ofall materials labour charges etc. complete as per direction of Departmental officers at site |
| 5 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 6 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size |
| 7 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 8 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) |
| 9 | Replacement of delivery pipe |
| 10 | OD35748/2024-2025:Dismantling old M.S pipes includingtaking out the pipes, breaking lead caulked joints, melting of lead and making into blocks, including stacking of pipes at site lead up to 50 metre:300 mm diameter M.Spipe |
| 11 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road |
| 12 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar |
| 13 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar |
| 14 | 2.10.1.2:Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil. and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within alead of 50 m:Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm dia |
| 15 | OD35696/2024-2025:Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals (KW 8.1) |
| 16 | 18.73.5:Providing and laying Double Flanged ( Screwed / Welded ) Centrifugally (Spun) Ductile Iron Pipes of Class K - 9 conforming to IS: 8329 :300 mm dia Ductile Iron Double Flanged |
| 17 | 18.68.1:Providing and laying D.I specials of class K - 12 suitable for push - on jointing as per IS : 9523 :Upt 600 mm dia |
| 18 | 18.30.7:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:300 mm diameter pipe |
| 19 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 20 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size |
| 21 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 22 | Restoration of road after laying of pipe |
| 23 | 4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method |
| 24 | 55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete. |
| 25 | 13.5.E.P.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - Using concrete Mixer - Height upto 5m |
| 26 | Restoration of compound wall after laying of pipe |
| 27 | OD38588/2024-2025:Dry rubble masonry (without concrete levelling course) with good quality blasted rubble(without bond stone), and packing to compactness to lines and levels cost and conveyance of allmaterials labour charges etc. complete as per direction of Departmental officers at site |
| 28 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 29 | OD38589/2024-2025:Common Approved OD-16.2: Solid masonry using pre cast solid blocks (factorymade) of size 30x15x20cm ornearest available size confirming to IS 2185 part I of 1979 for super structure up tofloor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etccomplete |
| 30 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 31 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) |
| 32 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 33 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing |
| 34 | 13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm |