|
| 1 | VESSEL : INS JAMUNAWO.NO:22040DL NOS : 10201,32,30035,25,41,42,36,164,236,SUB:NAVIGATION LIGHTS & CONTROL PANEL ,SIREN AND AELs)DURATION :45 DAYS |
| 2 | ROLL PITCH INDICATER TO BE CALIBRATED AS INDICATED BY SHIP STAFF VIEW CALIBRATION DUE. |
| 3 | SINGLE ARM DAVIT/ GEMINI DAVIT (MT -14007) MAKE - BHAWANI ENGG WORKS MODEL - SLEWING DAVIT 6.5 M RIB:CALIBRATE THE OVER-LOAD MECHANISM OF STARTER |
| 4 | COMPILOT-20 STEERING SYS/M/s RAYTHEON ANSCHUTZ, GERMANY (SUPPORING OEM M/s ELCOME MARINE, KOCHI):CALIBRATION OF ANALOG AC AMMETER IS REQUIRED (QTY - 02 NOS. , PART NO. EO9I -I1121N1CAW000, RANGE: 0 -50A |
| 5 | NAVIGATIONAL LIGHT AND CONTROL PANEL (NLCP) M/s WAVES ELECTRONICS PVT LTD. KOCHI,(MAINTOP NO-55000):CARRY OUT OVERHAULING OF NAVIGATIONAL LIGHTS (QTY : 44 Nos) WITH ALL REQUIRED MATERIALS. CHECK BELL CIRCUITS AND CHECK ALL THE LIGHTS FOR CORRECT BRILLIANCY. RENEW THE DEFECTIVE LIGHTS. |
| 6 | NAVIGATIONAL LIGHT AND CONTROL PANEL (NLCP) M/s WAVES ELECTRONICS PVT LTD. KOCHI,(MAINTOP NO-55000):OVERHAULING OF NAVIGATIONAL LIGHTS CONTROL PANEL ANDSATISFACTORY TRIALS TO BE OFFERED TO SHIP STAFF / TRIALS TEAM. |
| 7 | NAVIGATIONAL LIGHT AND CONTROL PANEL (NLCP) M/s WAVES ELECTRONICS PVT LTD. KOCHI,(MAINTOP NO-55000):CHECK ALL THE SWITCHES AND REPLACE DEFECTIVE SWITCHES. - 50Nos. |
| 8 | NAVIGATIONAL LIGHT AND CONTROL PANEL (NLCP) M/s WAVES ELECTRONICS PVT LTD. KOCHI,(MAINTOP NO-55000):CHECK THE SUPPLY CABLES OF SIGNALING PROJECTORS, RENEW DEFECTIVE CABLES.(2 CORE 4SQMM CABLE) |
| 9 | NAVIGATIONAL LIGHT AND CONTROL PANEL (NLCP) M/s WAVES ELECTRONICS PVT LTD. KOCHI,(MAINTOP NO-55000):PLUGS AND SOCKET OF JUNCTION BOX PERISHED. REPLACEMENT OF PLUGS AND SOCKET REQUIRED AS PER SAMPLE. |
| 10 | NAVIGATIONAL LIGHT AND CONTROL PANEL (NLCP) M/s WAVES ELECTRONICS PVT LTD. KOCHI,(MAINTOP NO-55000):JUNCTION BOX OF NLCP PERISHED (BRIDGE TOP).REPLACEMENT OF NLCP JB (DIMENSIONS -1\"X1.5\"X0.5\" MAT SS) AND FABRICATION AND FITMENT OF TALLIES ON CABLES ENTERING AND LEAVING JB. NO. OF TALLIES - 20 nos. |
| 11 | SIREN M/S KRIST ENGINEERING PVT LTD:INTERMITENT SHIFTING IS OBSERVED TO AUTO MODE WHEN OPERATING IN MANUAL MODE. DEFECT SUSPECTEDIN CONTROL UNIT TIMER PCB (ELECTRONIC) CARD.REPLACEMENT AND INSTALLATION CHECKS OF THE CONTROL UNIT TIMER PCB (PART NO. 24 A 01) IS REQUIRED. SATISFACTORY TRIALS TO BE OFFERED TO SHIP STAFF / TRIALS TEAM |
| 12 | SIREN, M/S KRIST ENGINEERING PVT LTD :COMPLETE OVERHAULING OF THE CONTROL UNIT AND SOLENOID VALVE VIEW WEAR AND TEAR OF COMPONENTS. ALL REQUIRED MATERIALS ARE UNDER VENDOR SCOPE. |
| 13 | AUTOMATIC EMERGENCY LIGHT:THE TRICKLE CHARGING CIRCUIT MALFUNTIONING. REMOVE BATTERY AND MEASURE THE TRICKLE CHARGING CURRENT WITH MULTIMETER AS PER TECHNICAL MANUAL AND REPLACE ANY COMPONENT IF FOUND DEFECTIVE. SATISFACTORY TRIALS TO BE OFFERED. - 75Nos. |
| 14 | AUTOMATIC EMERGENCY LIGHTING:WIRING OF AELs IN VARIOUS PLACES PERISHED DUE TO FAIR WEAR AND TEAR.REWIRING OF AEL IS REQUIRED. (1.5 SQ MM, 3 CORE, LENGTH 300 MTRS). |