Restoration Of Exzamindary Embankment For A Length Of 257 M Of Left Bank Of River New Cossye At Mouza Jaganathpur In Block And Ps Debra District Paschim Medinipur, Debra-West Bengal
TDR : 48968818
Tender Notice
BOQ
Expired
Debra
West Bengal
Restoration Of Exzamindary Embankment For A Length Of 257 M Of Left Bank Of River New Cossye At Mouza Jaganathpur In Block And Ps Debra District Paschim Medinipur
Name of Work:“Restoration of Ex-Zamindary Embankment (for a length of 257.00 M) of Left Bank of River New Cossye at Mouza-Jaganathpur, in Block & P.S- Debra, District-Paschim Medinipur\"
Sl. No.
Item Description
1
Supplying,dressingandstackingatsitebamboopinsabove5cm. diameterandupto7.5 cm. diameter.(Dia. to bemeasuredatmid length).
2
Driving bamboo pins in standing or flowing waterincluding scaffoldingand driving appliances. (a)Where boats are not necessary.
3
Supplying,fittingandfixingwithironnailshalfsplit bamboo wailing pieces (av.dia.of bamboo not less than 5.0 cm.)
4
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
5
Labourchargesforfillingemptycementgunnybag/polythenebag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a leadof 30 metreas perdirectionofEngr-in-charge(costis excluding the cost of any types of filling materials).NB:-Volume of earth/ sand filledbagsshould notbe lessthan0.028 cum/ bag.
6
Dumping in position earth / sand filledgunny / poly bags(capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
7
Earthworkinexcavationinallkindsofsoilformakingembankments, repairs to the embankment, closing breaches etc. as per profile including supplyandtransportingtheearthbytruckortractororanyother mechanicalmeansonland,includingloading,transporting,unloading and stacking with all lifts bothways and head load where necessary and depositingthesameonembankments,clannels,fillingdepressionsin requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.(B) Beyond 1.00 km and upto 2.00 km
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.