Providing New Lift In Tambaram Main Office Building At Tambaram City Municipal Corporation , Earthwork Excavation In All Stiff Clay, Stiff Back Cotton, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth And Earth Mixed With Small Size Boulders And To The Required Depth As May Be Directed Except In Hard Rock Requiring Blasting Inclusive Of Shoring Strutting And Baling Out Water Wherever Necessary, Depositing The Surplus Earth In Places Shown Clearing And Leveling The Site With An Initial Lead Of 10 Metre And Lifts As Specified Hereunder Etc., All Complete In All Respects Complying With Relevant Standard Specification (Excluding Refilling) 0 To 2 M Depth , Refilling In Foundation And Basement And Other Similar Works With Excavated Earth In Layers Of 150Mm Thickness Well Watered Rammed And Consolidated Etc All Complete Complying With Relevant Standard Specifications And As Directed By The Departmental Officers. , Supplying And Filling In Foundation And Basement With Stone Dust Of 100Mm Thickness Well Watered Rammed And Consolidated Complying With Relevant Standard Specifications Including Cost Offilling Stone Dust As Directed By The Departmental Officers. , Cement Concrete 1:5:10( One Of Cement,Five Of M Sand And Ten Of Hard Broken Stone Jelly) For Foundation Using 40 Mm Size Broken Stone Jellyinclusive Of Shoring, Strutting, Baling Out Water Wherever Necessary Ramming, Curing Etc., Complete In All Respect Complying With Relevant Standard Specifications And As Directed By The Departmental Officers.And As Directed By The Departmental Officers. , Cement Concretem 30 Design Mix Using Ordinary Portland Cement With Water Cement Ratio Not Exceeding 0.45 Including The Use Of Plasticizer Of Required Grade And Hard Granite Stone Jelly Of 20 Mm Size Down Graded As Per Requirment ,For All R C C Works Namely Tee,Ell,Or Rectangular Beams,Lintel ,Parapet Cum Drops,Waist And Landing Slabs,Canopy,Pin Projects,Sunshades,Windowboxing Slab,Fotting,Pedastal And Other Similar Works Excluding The Cost Of Reinforcement And Fabrication Charges,Centering And Shutteringbut Including Laying ,Vibrating, Finishing, Curing Etc All Complete Complying With Relevant Standard Specifications And As Directed By The Departmental Officers In The Following Floors.Mix Design Data Has To Be Got Approved Comencement Of Work. Directed By The Departmental Officers In The Following Floors.Mix Design Data Has To Be Got Approved Comencement Of Work Foundation And Basement , Cement Concretem 30 Design Mix Using Ordinary Portland Cement With Water Cement Ratio Not Exceeding 0.45 Including The Use Of Plasticizer Of Required Grade And Hard Granite Stone Jelly Of 20 Mm Size Down Graded As Per Requirment ,For All R C C Works Namely Tee,Ell,Or Rectangular Beams,Lintel ,Parapet Cum Drops,Waist And Landing Slabs,Canopy,Pin Projects,Sunshades,Windowboxing Slab,Fotting,Pedastal And Other Similar Works Excluding The Cost Of Reinforcement And Fabrication Charges,Centering And Shutteringbut Including Laying ,Vibrating, Finishing, Curing Etc All Complete Complying With Relevant Standard Specifications And As Directed By The Departmental Officers In The Following Floors.Mix Design Data Has To Be Got Approved Comencement Of Work. Directed By The Departmental Officers In The Following Floors.Mix Design Data Has To Be Got Approved Comencement Of Work Ground Floor , Cement Concretem 30 Design Mix Using Ordinary Portland Cement With Water Cement Ratio Not Exceeding 0.45 Including The Use Of Plasticizer Of Required Grade And Hard Granite Stone Jelly Of 20 Mm Size Down Graded As Per Requirment ,For All R C C Works Namely Tee,Ell,Or Rectangular Beams,Lintel ,Parapet Cum Drops,Waist And Landing Slabs,Canopy,Pin Projects,Sunshades,Windowboxing Slab,Fotting,Pedastal And Other Similar Works Excluding The Cost Of Reinforcement And Fabrication Charges,Centering And Shutteringbut Including Laying ,Vibrating, Finishing, Curing Etc All Complete Complying With Relevant Standard Specifications And As Directed By The Departmental Officers In The Following Floors.Mix Design Data Has To Be Got Approved Comencement Of Work. Directed By The Departmental Officers In The Following Floors.Mix Design Data Has To Be Got Approved Comencement Of Work First Floor , Cement Concretem 30 Design Mix Using Ordinary Portland Cement With Water Cement Ratio Not Exceeding 0.45 Including The Use Of Plasticizer Of Required Grade And Hard Granite Stone Jelly Of 20 Mm Size Down Graded As Per Requirment ,For All R C C Works Namely Tee,Ell,Or Rectangular Beams,Lintel ,Parapet Cum Drops,Waist And Landing Slabs,Canopy,Pin Projects,Sunshades,Windowboxing Slab,Fotting,Pedastal And Other Similar Works Excluding The Cost Of Reinforcement And Fabrication Charges,Centering And Shutteringbut Including Laying ,Vibrating, Finishing, Curing Etc All Complete Complying With Relevant Standard Specifications And As Directed By The Departmental Officers In The Following Floors.Mix Design Data Has To Be Got Approved Comencement Of Work. Directed By The Departmental Officers In The Following Floors.Mix Design Data Has To Be Got Approved Comencement Of Work Second Floor , Cement Concretem 30 Design Mix Using Ordinary Portland Cement With Water Cement Ratio Not Exceeding 0.45 Including The Use Of Plasticizer Of Required Grade And Hard Granite Stone Jelly Of 20 Mm Size Down Graded As Per Requirment ,For All R C C Works Namely Tee,Ell,Or Rectangular Beams,Lintel ,Parapet Cum Drops,Waist And Landing Slabs,Canopy,Pin Projects,Sunshades,Windowboxing Slab,Fotting,Pedastal And Other Similar Works Excluding The Cost Of Reinforcement And Fabrication Charges,Centering And Shutteringbut Including Laying ,Vibrating, Finishing, Curing Etc All Complete Complying With Relevant Standard Specifications And As Directed By The Departmental Officers In The Following Floors.Mix Design Data Has To Be Got Approved Comencement Of Work. Directed By The Departmental Officers In The Following Floors.Mix Design Data Has To Be Got Approved Comencement Of Work Third Floor , Supplying And Erecting Centering For Sides And Soffits Including Necessary Supports And Strutting Up To 3.29 M Height For Plane Surfaces As Detailed Below In All Floors With All Cross Bracings Using Mild Steel Sheets Of Size 90 X 60 Cm And 10 Bg Stiffened With Welded Mild Steel Angle Of Size 25Mm X 25Mm X 3 Mm For Boarding Laid Over Silver Oak Joists Of Size 10Cm X 6.50 Cm Spaced At About 90 Cm Centre To Centre And Supported By Casurina Props Of 10Cm To 13 Cm Dia Spaced At Not More Than 75 Cm Centre To Centre Etc. Complete Complying With The Standard Specification. (Payment For Centering Shall Be Given After The Concrete Is Laid) Providing Form Work For Foundationetc., Complete In All Respect Complying With Relevant Standard Specifications And As Directed By The Departmental Officers. , Supplying And Erecting Centering For Sides And Soffits Including Necessary Supports And Strutting Up To 3.29 M Height For Plane Surfaces As Detailed Below In All Floors With All Cross Bracings Using Mild Steel Sheets Of Size 90 X 60 Cm And 10 Bg Stiffened With Welded Mild Steel Angle Of Size 25Mm X 25Mm X 3 Mm For Boarding Laid Over Silver Oak Joists Of Size 10Cm X 6.50 Cm Spaced At About 90 Cm Centre To Centre And Supported By Casurina Props Of 10Cm To 13 Cm Dia Spaced At Not More Than 75 Cm Centre To Centre Etc. Complete Complying With The Standard Specification. (Payment For Centering Shall Be Given After The Concrete Is Laid) Providing Form Work For Vertical Wall Etc., Complete In All Respect Complying With Relevant Standard Specifications And As Directed By The Departmental Officers. , Supplying And Erecting Centering For Sides And Soffits Including Necessary Supports And Strutting Up To 3.29 M Height For Plane Surfaces As Detailed Below In All Floors With All Cross Bracings Using Mild Steel Sheets Of Size 90 X 60 Cm And 10 Bg Stiffened With Welded Mild Steel Angle Of Size 25Mm X 25Mm X 3 Mm For Boarding Laid Over Silver Oak Joists Of Size 10Cm X 6.50 Cm Spaced At About 90 Cm Centre To Centre And Supported By Casurina Props Of 10Cm To 13 Cm Dia Spaced At Not More Than 75 Cm Centre To Centre Etc. Complete Complying With The Standard Specification. (Payment For Centering Shall Be Given After The Concrete Is Laid) Providing Form Work For Plain Surfacessuch As Floor Slabs, Roof Slabs, , Aac Block Work Using Self Curing Aac Mortar Joint 2-3Mm Thick Inbetween The Blocks With A Spread Of 170Sqft/40 Kg ,Cement Mortor 1:6 ( One Of Cement And Six Ofm Sand)Along The Boundaries Using Bricks Of Size 600X200x225mm Having Minimum Average Crushing Strength Of 50Kg/Sqcm In Foundation & Basementincluding Dewatering Wherever Necessary Proper Setting Curing Etc., Complete In All Respects Complying With Relevant Standard Specifications And As Directed By The Departmental Officers , Supplying, Fabricating And Placing In Position Of Mild Steel Grills/Ribbed Tor Steels For Reinforcement Fe500 Hysd For All Floors Including Cost Of Steel,Binding Wire, Bending, Tying Etc, All Complete Complying With Relevant Standard Specification And As Directed By The Departmental Officers. , Supplying And Fixing Ofsuper Fine Polished Jet Black Granite Slab Of18 Mm To 20 Mm Thick Of Approved Quality Laid In Cm 1;3 (One Of Cement And Three Of M Sand) 12 Mm Thick Over Kitchen Hearth Slab Including Cutting The Granite Slab To The Required Size Where Ever Necessary , Nosing The Edges To The Required Shape Including Cost Of Granite Slab, Polishing Laying Finishing Etc All Completein All Respects And As Directed By The Departmental Offficers. (Measurement Will Be Taken Including Bearing Also The Quality And Color Of Granite Slabshall Be Got Approved By The Executive Engineer Before Fixing.) , Supplying And Fixing Ofsuper Fine Polished Jet Black Granite Slab Of10 Mm Thick Of Approved Quality Laid In Cm 1;3 (One Of Cement And Three Of M Sand) 12 Mm Thick Over Kitchen Hearth Slab Including Cutting The Granite Slab To The Required Size Where Ever Necessary , Nosing The Edges To The Required Shape Including Cost Of Granite Slab, Polishing Laying Finishing Etc All Completein All Respects And As Directed By The Departmental Offficers. (Measurement Will Be Taken Including Bearing Also The Quality And Color Of Granite Slabshall Be Got Approved By The Executive Engineer Before Fixing.) , Finishing The Top Of Flooring With Cement Concrete 1:3 Ellis Pattern Flooring 20Mm Thick In Cement Concrete 1:3(One Of Cement And Threeof Stone Jelly ) Using 10Mm And Less Hard Broken Stone Chips (No M Sand To Be Used) Including Laying ,Curing, Finishing..Etc Complete Complying With Relevant Standard Specifications And As Directed By Departmental Officers. , Filling The Top Of Terrace Floor With One Course Of Solar Reflective Water Proof, Heat Proof Tiles Of Size 1X1x1 Thick Of Approved Quality Laid In Cm 1:3 Mixed With Calcium Based Mineral Powder (60 Kg For 1000 Sqft) Before Laying Tiles, The Tiles Should Be Dipped With Salin Based Nano Liquid And Top Grouting With Cm 1:3 Mixed With White Cement, Silicon Powder And Polymer Additives (20 Kg For 1000 Sqft) And Joint Pointed With Zycosil Oil (200 Gm For 1000 Sqft) After Grouting Acrylic Salin Based Liquid With A Base Concrete Of Pcc 1:2:4 Using 6 To 10Mm Metal For Providing Necessary Gradient Etc. Complete Complying With Standard Specifications Including Cost Of All Materials, Labour Charges For Lifting To Open Terrace, Laying And Finishing And Other Incidental Charges Etc. Complete And As Directed By The Departmental Officers. (The Brand And Quality Of Tiles Should Be Got Approved From The Ee Before Using). , Plastering In C.M 1:3 (One Of Cement And Three Of P Sand)10Mm Thick For Bottom Of Sunshade, Ceilingin All Floors, Including Scaffolding, Curing ,Finishing Etc Completecomplying With Relevant Standard Specification And As Directed By The Departmental Officer , Plastering With Cement Mortar 1:5 ( One Of Cement And Five Of P Sand) 12Mm Thickfinished With Neat Cement Including, Providing Band Cornice Scaffolding Curing Etc.,Completecomplying With Relevant Standard Specification And As Directed By The Departmental Officer , Stucco Plastering 12Mm Thick Using The10mm Metal Chips Andthe River Sand Including Curing And Finishing Neatly Complying With Standard Specification And As Directed By The Departmental Officers Etc. Complete. , Distempering The Ceiling Two Coat With Best Oil Bound Distemper Of Approved Quality Including Preparation Of Surfaces (The Colour And Quality Should Be Got Approved By The Executive Engineer Before Use) The Rate Includes Cost Of Brushes, High Scaffolding Charges, Neat Finishing, Cost Of Brushes Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officer , Painting The New Walls (Inner) With Two Coats Of Plastic Emulsion Paint Over One Coat Of Primer Paint Work Including Cost Of Brushes, Cement Paints Scaffolding Curing Etc., Complete In All Respects Complying With Relevant Standard Specification And As Directed By The Departmental Officers. All The Material Used In The Construction Are Approved Brand /Reputed Brand As Per Agreement Condition. , Painting The New Wallstwo Coatswithbestapproved Quality Weather Shieldexterior Emulsion Paint Over One Coat Of Primer Including Cost Of Brushes, Emulsion Paints Scaffolding Curing Etc., Complete In All Respects Complying With Relevant Standard Specification And As Directed By The Departmental Officers. ( The Quality And Shade Of Paint Should Be Got Approved By The Executive Engineer Before Use). , Supplying And Fixing Of 110Mm Dia Pvc Swr Pipe A Type For Rain Water Down Fall Pipe Conforming To Is13592 With Isi Mark And Fittings Conforming To Is 14735 ,With Necessary C Igratings, Shoes, Bends,Offset ,Clamp, Teak Wood Plug, Gi Bolts And Nuts, Etc., Of Approved Quality And Including Fixing C.I. Gratings At The Junction Of Parapet And Floor Or Roof Slab , Including Finishing Etc., Complete Complying With Relevant Standard Specifications. And As Directed By The Departmental Officers. , Wiring With2 Wire 1.5 Sqmm Copper Pvc Insulated Unsheathed Single Core Multi Strand Fire Retardant 1.1 Kv Grade Copper Cable With Isi Mark Conforming To Is:694/1990Andwith Continuous Earth By Means Of 1.5 Sqmm Copper Insulated Unsheathed Single Core Multi Strand Fire Retardant 1.1 Kv Grade Copper Cable With Isi Mark Conforming To Is:694/1990 Infully Concealed Pvc Rigid Conduit Pipe Heavy Duty With Isi With Suitable Size Ms Box Of 16 Gauge Thick Concealed And Covered With 3Mm Thick Laminated Hylem Sheet For Light Pointwith Bakelite Battern Holder Controlled By 5 Amps Flush Type Switch Including Circuit Mains Cost Of All Materials, Specials Etc., All Complete Complying With Relevant Standard Specifications And As Directed By The Departmental Officers... , Wiring With 2 Wire 1.5 Sqmm Copper P.V.C. Insulated Unsheathed Single Core Multi Strand Fire Retardant 1.1 Kv Grade Copper Cable With Isi Mark Conforming To Is:694/1990And1.1.K.V. Grade Cable With Continuous Earth By Means Of 1.5 Sq.Mm Copper Pvc Insulated Unsheathed Single Core Multi Strand Fire Retardant 1.1 Kv Grade Copper Cable With Isi Mark Conforming To Is:694/1990And Grade Cable In Fully Concealed Pvc Rigid Conduit Pipe Heavy Duty With Isi Mark With Suitable Size Ms Box Of1 No (Each) 16G Thick Concealed And Covered With 3Mmthick Laminated Hylem Sheet For 5 Amps. 5 Pin Plug Socket Point At Convenient Places Including Circuit Mains, Cost Of All Materials, Specials, Etc., All Complete Complying With Relevant Standard Specifications & As Directed By The Departmental Officers.. , Supplying And Fixing Of Water Tight Bulk Head Fittings With One Number Of 11 Wattscfl Bulb Including Necessary Connections, Cost Of Materials Etc., All Complete Complying With Relevant Standard Specifications & As Directed By The Departmental Officers.( The Brand/Quality Of Fittings And Cfl Lamphas To Be Got Approved By The Ee Before Fixing) . , Supplying And Fixing 7 Segements (3 Tier) 3 Phase Distribution Board With Mcb6 Way Tpmcb Sheet Steel Distribution Board Flush/Surface Typefitted With Bus Bar And Netural Link With Three Phase Mcb Outgoings And Sepeate 4 Way Provision For Accomadiating One No Of 4 Pile Incoming Mcb And Another Sepearate 4 Way Provision For Accommadating One No Of Four Pole Elcb /Rcd (Totally 8 Ways In One Segment) (3 X 4 Ways Ineach Segment)And Seperate Provision For Mcb 12 Nos O For Sub Incomer In 3 Segements With Label Holder And Provision For Taking Up Cable For Size Not Less Than 25 Sqmmincluding63 Amps 4 Pole Mcb - 1No.,20Amps Sp 10 Ka Mcb- 18 Noand Fixing The Labour Charges At Required Places Etc., Complete Complying With Standard Dpecification And As Directed By The Departmental Officer , Supplying And Fixing Offour Pole 40Amps Rating Three Phase Earth Leakage Circuit Breaker/Residual Current Circuit Breaker (Elcb/Rccb) 30 Masensitive With Isi Mark On Fully Concealed Suitable Ms Box With Necessary Interconnection And Earth Connection Using Copper Cableincluding The Cost Of Materials, Conveyance And Redoing The Disturbed Portion Etc All Complete.,All The Material Used In The Construction Are Approved Brand /Reputed Brand As Per Agreement Condition. , Run Of Main With 2 Wires Of 2.5 Sqmm Copper Pvc Insulated Unsheathed Single Core Multi Strand Fire Retardant 1.1 Kv Grade Copper Cable With Isi Mark Conforming To Is:694/1990 Andwith Continuous Earth By Means Of 2.5 Sqmm Copper Pvc Insulated Unsheathed Single Core Multi Strand Fire Retardant 1.1 Kv Grade Copper Cable With Isi Mark Conforming To Is:694/1990In Fully Concealed 19/20Mm Dia Rigid Pvc Conduit Pipe With Isi Mark Etc. Including Cost Of All Materials, Specials Etc. All Complete And As Directed By The Departmental Officers. , Providing Earthing Station Using Pipe Electrode As Per Is 3043 Using 2.5M Of 40Mm And 1.0 M Of 20Mm B-Class Gi Pipe Including Earth Work Excavation, Brick Work In Cement Mortar And Plastering And Cost Of Funnel, Gi Nuts, Bolts, Washers, Check Nuts, Gi Bend, Reducer And Coupling, C.I. Cover Of 30X30cm And Including Charcoal Of 40 Kgs And Salt10 Kg Etc., All Complete Complying With Relevant Standard Specifications & As Directed By The Departmental Officers. , Supplying And Laying Of8 Gauge Copper Wireon Wall / Below Ground Levels With Necessary ‘U’ Nails, Earth Work Excavation And Refilling Etc... Including Cost Of All Materials Etc.. All Complete.For Lift , Design, Manufacture, Supply, Delivery, Erection,Testing And Commissioning Of 13 Passenger Capacity Lift Mrl, Speed 1.5 M/S With Stainless Steel Panels, Disable Friendly, Microprocessor Based Controller, Vvvf Drive, Fire Rated Doors And Ard , Supplyinglaying And Connecting 31/225Sqmm Aluminium Armoured Ug Cable With Isi Mark Of Reputed Brandincluding Fixing In Walls With Necessary Ms Clamps, Brass Screws Including Cost Of All Materials Redoing The Dismantled Portion, Etc., All Complete Coplying With Relevant Standard Specification Andas Directed By The Departmental Officers. (The Quality And Brand Of Ug Cable Should Be Got Approved From Executive Engineer Before Use). , Supplying And Fixingthree Phase Distribution Board With 8 Way/Phase And 32 Amps/Per Way With Fuse And Neutral Link Of Reputed Brand, On Suitable Tw, Plank/ 12Mm Thick Well Varnished Including Necessary Interconnection And Earth Connection Cost Of All Materials Etc All Complete Forinside Flats. (The Brand/Model Of The Fitting Has To Be Got Approved By The Executive Engineer Before Fixing)