| 1 | Dismentling of brick work or stone work in lime or cement mortar and i/c stacking or matrial as directed the engineer in charge with in a distance 60 meter |
| 2 | Dismentling reinforced cement concrete or reinforced brick work including stacking of dismantled matrial as directed the engineer in charge with in a distance 60 meter |
| 3 | Deduction of old and workable brick 20% of item no-1 |
| 4 | Disposal of refuse material up to 5km including loading unloading at dump site |
| 5 | Supplying & laying of Emplty cement bags filled with local sand |
| 6 | De-watering bt diesel pumping set of 5 H.P capacity during the costruction of bridge, culvert nala etc i/c hite charge of pumping set and its pol, labour all T&P etc complete in all respect. |
| 7 | Errection of barricades for three days consisting of three rows of horizontal wooden ballies 8cm dia at 45cm centre to centre and vertical posts of 8cm to 10cm size wood bargas or 10cm dia ballies 2.10 m to centre to centre 1 m to 1.25 m projection above ground level and 0.45 m embaded blow ground level security tightened with suprior quality of fine nariyal rope including supply of material labour tools and plants etc. required for proper completion of the work accoding to standard design issued wide C.E.S No. 4261C/1013C/74 dated 02.08.74 but in metric dimention give above as directed by the engineer-in-charge and including its removal leveling and dressing of the site when done with |
| 8 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift up to 1.5 M, and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into thhe plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches (where machine can not reach/move) for building work only, (excluding royalty) |
| 9 | Concrete with 4cm gauge stone ballast coarse sand and cement in proportion of 8:4:1 in foundation and under floor, including supply of all material labour and T&P etc required for proper completion of the work |
| 10 | M-150 brick work in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work |
| 11 | 12mm thick Plaster in 1:4 with one part cement,and four part of approved coarse sand mortar including supply ofall material ,labour and T&P etc.required for proper completion of work |
| 12 | R.C.C work with cement approved coarse sand and 4 Cm gauge approved stone grit in proporation of 1:1.5:3 in raft foundation and footing excluding supply of reinforcement and lits bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. |
| 13 | R.C.C work with cement approved coarse sand and 2 Cm gauge approved stone grit in proporation of 1:1.5:3 in RCC T-beam, slab, roof and R.C.C. columns excluding supply of reinforcement and lits bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. |
| 14 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications complete as per MORTH IInd Revision 2019 Specification 1600. |
| 15 | ADD or Less Say Amount |