| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. As per DSR 2023 Ch15S.I. 15.7.3 (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. As per DSR 2023 S.I. 2.6.1 All kinds of soil (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) .AS Per DSR Ch-4, S.I. 4.1.8 (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |
| 4 | Brick work with common burnt clay F.P.S.(non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) AS Per DSR Ch-6, S.I.6.1.2 (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platformAS Per DSR Ch-5, S.I 5.9.3 (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources As Per DSR Ch 5 SI No.5.1.2 (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).AS Per DSR Ch.-5, SI No.5.2.2 (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand)Ch-6, S.I. 2. DSR No.6.4.2. (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more..AS Per DSR Ch-5, S.I 5.22A.1 (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |
| 10 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) AS Per DSR Ch-13, S.I 13.4.1 (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |
| 11 | Washed stone grit plaster on exterior walls height upto 10 metre above ground level, in two layers, under layer 12 mm cement plaster 1:4 (1cement : 4 coarse sand ), furrowing the under layer with scratching tool, applying cement slurry on the under layer @ 2 Kg of cement per square metre, top layer 15 mm cement plaster 1:1/ 2:2 (1 cement: 1/2 coarse sand: 2 stone chipping 10 mm nominal size), in panels with groove all around as per approved pattern, including scrubbing and washing the top layer with brushes and water to expose the stone chippings ,complete as per specification and direction of Engineer-in-charge (payment for providing grooves shall be made separately).AS Per DSR Ch-13, S.I No. 13.72 (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |
| 12 | Finishing walls with water proofing cement paint of required shade :New work (Two or more coats applied @ 3.84 kg/10 sqmAS Per DSR Ch-13, S.I No. 13.44.1A (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.) |