| 1 | Dismantling C.C work including clearing and staking of material within 60.0 mtr. |
| 2 | Earthwork in Excavation of Ordinary soil and Soil mixed with Kankar. |
| 3 | Plane Cement Concrete with 1:4:8 Cement, sand, stone ballast (20-50 MM) includingcost of material at site Labour, T&P etc. required for proper completion of work |
| 4 | Laying of P.V.C pipes including jointing ,coupling, cutting for making correct length |
| 5 | Earth work in back filling oftrenches after laying P.V.C pipe |
| 6 | M -150 brick work in 1:4 (cement and coarse sand of 2.25 F.M. mortar)in foundation and plinth including supply of materials , labour andT& P etc. required for proper completion of work . |
| 7 | M -150 brick work in 1:4 cement and coarse sand of 2.25fmmortar in superstructure up to plinth including cutting and moulding of brick as required thikness of wallsupply of materials , labour andT& P etc. required for proper completion of work(Superstructure). |
| 8 | Cement concrete with 2cm guage stone grit course sand & cement in proportion of 4:2:1 including supply of materials , labour andT& P etc. required for proper completion of work. |
| 9 | 3.5cm thick cement concrete in roof grouting with 1:2:4 cement coarse sand and 4.75-10mm stone grit and including water proofing materials including supply of materials , labour andT& P etc. required for proper completion of work . |
| 10 | Plaster Work in 1:4 Cement Sand Mortar Over BrickMasonary |
| 11 | R.C.C.work with cement approved coarse sand and 2 cm gauge stone grit in proportion 1:1.5:3 for slabs excluding supply of rainforcement & its bending but including fixing ,supplyand binding with binding wirenecessary centering and shuttering etc and supply of materials , labour andT& P etc. required for proper completion of work . |
| 12 | Mild steel /iron work such as R.C.C. work rainforcementas per item no-5 |
| 13 | Bending,Binding,Cutting and Placing of reinforcement bar i/c cost of binding wire but excluding cost of steel |
| 14 | Supply and Laying/fillingof 4cm guage stone ballast in filter chamber |
| 15 | Supply and Laying/feedingof 10-20mm gauge stone grit in filter chamber |
| 16 | Supply and Laying/feedingof 2-4mm pea gravel in filter chamber |
| 17 | Supply and Laying/feedingof 2.25fm coarse sand in filter chamber |
| 18 | Supply and Laying of nylon filter cloth/mess |
| 19 | Supply and Laying of flat Brick soling dry in filter chamber |
| 20 | Supply of 110 MM ɸ PVC Pipe 6kgf/sqcm With couplar. For Collecting Rain water From roof top to Filter Chamber |
| 21 | Supply of 150 MM ɸ PVC Pipe With couplar. For Connecting Filter Chamber and silt collection chamber |
| 22 | Supply of solvent cement |
| 23 | Supply and fixing of M.S clamp for fixing of P.V.C pipes |
| 24 | Supply and fixing ofP.V.C elbow for P.V.C pipes |
| 25 | Supply and fixing ofP.V.C Tee for P.V.C pipes |
| 26 | Supply and fixing of Gate valve |
| 27 | Providing andfixing iron mess |
| 28 | S/F of sign board with writing etc.complete. |
| 29 | Provision of painting,logo etc complete. |
| 30 | Boring work 150mm ɸ includingsupply of all materials , labour andT& P etc. required for proper completion of work(30.00 MTR DEPTH) |